Berry Point TCZ-2 and TCZ-3 Range Light Installations

The Applicant proposes to install and operate two navigational aid platforms (i.e., range light towers). The Project is required to facilitate the movement of vessels through the Second Narrows Traffic Control Zone 2 (TCZ-2) as part of the Port Authority Active Vessel Traffic Management Program. Four piles will be driven into the seabed at each location. Other components of the range light towers (e.g., range platform, tower, tower solar array, etc.) would be prefabricated offsite into modules and installed upon pile installation. The distance between the two structures will be approximately 300 m. 


Latest update

End of public comment period 

The public comment period on the project is closed. The Vancouver Fraser Port Authority is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Berry Point TCZ-2 and TCZ-3 Range Light Installations - November 21, 2023

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Berry Point TCZ-2 and TCZ-3 Range Light Installations (British Columbia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    In progress
  • Start Date

    2023-11-21
  • Proponent

    Vancouver Fraser Port Authority
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    86104