Lynnterm Berth 4 Mooring and Dolphin Upgrades

The proposed project  

Univar proposes to upgrade the existing berthing and mooring dolphins to meet current safety code requirements and allow for additional mooring capacity for larger vessels at Lynnterm Berth 4, 1545 Bay Street, North Vancouver. The project includes extending existing fender panels, installing new fender panels, replacing an existing 75 tonne bollard with a 150 tonne rated bollard, installing ten 914 millimeter diameter steel piles, extending concrete pile caps, replacing damaged fender piles, and relocating a gangway, shed and associated equipment. Construction is anticipated to take approximately three to four months to complete. 


Latest update

Notice of Determination 

North Vancouver, B.C. – September 10, 2021 – The Vancouver Fraser Port Authority has determined that the proposed Lynnterm Berth 4 Mooring and Dolphin Upgrades located at 1545 Bay Street, North Vancouver, BC is not likely to cause significant adverse environmental effects.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Lynnterm Berth 4 Mooring and Dolphin Upgrades (British Columbia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2021-03-08
  • Proponent

    Univar
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    82860
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: