GCT Deltaport Expansion - Berth Four Project
GCT Canada Limited Partnership is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia, approximately 35 kilometres south of Vancouver. As proposed, the GCT Deltaport Expansion - Berth Four Project would add a fourth berth on the east side of the Roberts Bank Causeway, include an expansion of the intermodal rail yard along the causeway (Roberts Bank Way) and dredging to provide safe access for ships. The additional land-based container storage and handling facilities would provide an additional two million 20-foot long storage containers (otherwise referred to as 20-foot equivalent units or TEUs) per year at the existing terminal.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
January 8, 2021 — The Impact Assessment Agency of Canada has suspended the timeline for the impact assessment at the request of the proponent.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
62 | Notice of Time Limit Suspension with Reasons | - | January 8, 2021 |
61 | Joint Summary of Issues and Engagement | PDF (595 KB) | December 23, 2020 |
2 | Summary of an Initial Project Description of a Designated Project | PDF (5.3 MB) | September 18, 2020 |
1 | Initial Project Description of a Designated Project | PDF (9.8 MB) | September 18, 2020 |
List all records
Contacts
GCT Deltaport Expansion - Berth Four ProjectImpact Assessment Agency of Canada
Suite 210A - 757 West Hastings Street
Vancouver, British Columbia V6C 3M2
Telephone: 604-666-2431
Email: IAAC.Deltaport.AEIC@canada.ca
-
Location
- Delta (British Columbia)
-
Project Type
- Ports and Harbours
-
Status
Suspended -
Start Date
2020-09-28 -
Proponent
GCT Canada Limited Partnership -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Planning Phase for Impact Assessment -
Reference Number
81010
Nearby projects
..within 200 kilometres-
Roberts Bank Terminal 2 Project
Delta -
Westshore Terminals Berth 2 Mooring Dolphin Upgrades
Delta -
Drainage Maintenance and Improvement Project - Alaksen National Wildlife Area
Alaksen National Wildlife Area -
Steveston Paramount Maintenance Dredging
Steveston Paramount Small Craft Harbour -
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080)
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080) -
WesPac Tilbury Marine Jetty Project
Tilbury Island, Delta -
Tilbury Phase 2 LNG Expansion Project
Tilbury Island, Delta -
Vancouver Airport Fuel Delivery Project
Richmond -
Delta Grinding Facility Project
Tilbury Island, Delta -
Fraser River Pile and Dredge No. 8 Road Barge Ramp Maintenance Dredging
Richmond -
Construct Maintenance Building and Military Vehicle Parking at Richmond Armoury
Richmond Armoury, 5500 #4 Road, Richmond -
Fenceline Construction and Maintenance at Richmond Training Area
Colonel Sherman Armoury and Richmond Training Area -
Riparian Habitat Enhancement - Russ Baker Way Lands
Riparian Habitat Enhancement - Russ Baker Way Lands -
City of Delta Stormwater Outfall
City of Delta Stormwater Outfall -
Canadian Coast Guard Purfleet Point Front and Rear Range Rebuild
Lower Fraser River of the Vancouver Regional District, New Westminster, Annacis Island, British Columbia -
Canadian Coast Guard Purfleet Point Front and Rear Range Rebuild
Lower Fraser River of the Vancouver Regional District, New Westminster, Annacis Island, British Columbia -
Concrete Batch Plant
Vancouver -
Vito Shipyards Wharf Repairs amendment
Vito Shipyards Wharf Repairs amendment -
Vito Dock Maintenance Dredging
Delta -
Vito Shipyards Wharf Repairs
Delta -
Delta Cedar New Pile Installation
Delta -
Annacis Island Wastewater Treatment Plant New Outfall - Project Permit No. 17-093-1 - Amendment (Condition 32 - Extended Hours)
Delta -
Truck Parking Construction - Nordel Way Area
Truck Parking Construction - Nordel Way Area -
Queensgate Maintenance Dredging
Queensgate Maintenance Dredging -
Winter Cove Boat Ramp Repair, Saturna Island
Gulf Islands National Park Reserve -
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours) -
WWL Underground Storage Tank Removal Annacis Island
Delta -
Maintenance Dredging at FRPD Waterlot
Maintenance Dredging at FRPD Waterlot -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Installation of Pole Lights
100 Annacis Parkway, Annacis Island, Delta -
Containerized dry bulk handling project
Containerized dry bulk handling project -
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction -
Shoreline Protection at 177 Duncan Street in New Westminster
Shoreline Protection at 177 Duncan Street in New Westminster -
Trans Mountain Expansion Project
Burnaby -
Installation of scour protection
Installation of scour protection -
Expansion of the Lumber Transload Facility of Goodrich Terminal2012 Ltd. at the Port of Vancouver
Port of Vancoouver -
Demolition of Office Building and Parking Canopies
Demolition of Office Building and Parking Canopies -
Nav Canada surveillance radar - Gulf Islands National Park Reserve, Saturna Island, BC
Saturna Island, BC - Gulf Islands National Park Reserve of Canada -
Olsen Road site development for truck staging
Olsen Road site development for truck staging -
Pacific Elevators New Dust Control System and Access
Pacific Elevators New Dust Control System and Access -
CN rail bridge seismic retrofit project
CN rail bridge seismic retrofit project -
Amix Pile and Float Removal
Amix Pile and Float Removal -
Kitsilano CCG SAR - Workshop Reconstruction
Kitsilano CCG SAR -
Schnitzer Fire Suppression Project - Design Amendment
Schnitzer Fire Suppression Project - Design Amendment -
Fire Hydrant Replacement
Surrey Taxation Data Centre -
Lehigh Materials - Surrey Barge Ramp Project
Lehigh Materials - Surrey Barge Ramp Project -
Radio Tower Upgrades, North Pender Island
Gulf Islands National Park Reserve -
Surrey Langley SkyTrain Project and Broadway Subway Project
Surrey -
Schnitzer Steel Maintenance Dredging
Schnitzer Steel Maintenance Dredging -
Freedom Mobile Installation on Radio Tower Site, North Pender Island
Gulf Islands National Park Reserve -
WildFire Risk Reduction Project - fuels managment at three sites in Gulf Islands National Park Reserve
Gulf Islands National Park Reserve -
Georgia Pacific Gypsum Plant Demolition
Georgia Pacific Gypsum Plant Demolition -
Flood Barrier
Vancouver -
Retaining wall replacement
Retaining wall replacement -
Seabin Installation at Main Street Dock
Vancouver, British Columbia -
SeaBus Terminal Upgrades (Utilities)
SeaBus Terminal Upgrades (Utilities) -
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date -
Shoreline protection and retaining wall improvements project
Shoreline protection and retaining wall improvements project -
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours)
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours) -
Amendment to dates - Centerm Expansion Project Fisheries Act Authorization
Vancouver -
Centerm Expansion Project - Amendment to Fisheries Act Authorization
Vancouver -
Centerm Expansion Project - Amendment (Condition 66 - Dredging)
Centerm Expansion Project - Amendment (Condition 66 - Dredging) -
Maintenance dredging - Centerm
Maintenance dredging - Centerm -
Pacific Terminals Emergency Vehicle Road Access
Pacific Terminals Emergency Vehicle Road Access -
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade -
Global Container Terminal Vanterm Maintenance Dredging
Vancouver -
Extension - Temporary Construction Staging Parking and Barge Loading
Extension - Temporary Construction Staging Parking and Barge Loading -
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion -
Marine Operations Facility
Marine Operations Facility -
Osprey Nest Platform
Osprey Nest Platform -
Mariner Seafoods Shoreline Protection
Mariner Seafoods Shoreline Protection -
Cascadia West Rail Extension
Vancouver -
South Shore Corridor Project - Extension to Expiry Date
South Shore Corridor Project - Extension to Expiry Date -
Columbia Containers Shoreline Protection Repair
Columbia Containers Shoreline Protection Repair -
Oil Spill Emergency Response Base - Project Permit No. 16-290 - Extension to the Expiry Date
Vancouver -
Fraser Mills Foreshore Improvements
Fraser Mills Foreshore Improvements -
Fraser Mills Pile Removal
Fraser Mills Pile Removal -
Installation of Annex 4 Vacuum System
Installation of Annex 4 Vacuum System -
Rail Expansion with Tent
Rail Expansion with Tent -
G3 Terminal Vancouver Berth Pocket Obstruction Removals
G3 Terminal -
Neptune Terminal maintenance dredging at Berth 2 and 3
Neptune Terminal maintenance dredging at Berth 2 and 3 -
Dredging to Deepen Berth 1 - Project Permit No. 18-027-1 - Amendment (Condition 23 - Extended Hours)
North Vancouver -
Neptune Coal Capacity Project and West Quadrant Shiploader - Project Permit No. 12-066-1 - Amendment (Condition 18 - Extended Hours)
North Vancouver -
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment -
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals -
Chemtrade maintenance dredging
Chemtrade maintenance dredging -
Fibreco Terminal Enhancement Project Amendment (Stormwater Design)
North Vancouver -
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours -
Subtidal Cobble Replacement
North Vancouver -
Neptune - Rail Bypass Track Layout
Neptune - Rail Bypass Track Layout -
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date -
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date -
Seaspan Outfitting Pier Extension
Seaspan Outfitting Pier Extension -
Neptune Cargill Overpass Extension - Project Permit No. 17-131-1 - Amendment (Condition 17 - Extended Hours)
North Vancouver -
Installation of Eight Steel Pipe Piles - Project Permit No. 18-184 - Extension to the Expiry Date
Burnaby -
Barge Loading Facility
Barge loading facility -
Water Supply Pipe and Casing - Neptune
Water Supply Pipe and Casing - Neptune -
Kings Mill Park Shoreline and Habitat Work
Kings Mill Park Shoreline and Habitat Work -
Barge Ramp Beam Installation
Burnaby -
Seaspan Ship Load-out Gravel Bed and Shoreline Protection
North Vancouver -
Shellburn Berthing Dolphin Replacement
Burnaby -
Conveyance for North Shore Wastewater Treatment Plant - Project Permit No. 17-090-1 - Amendment (Condition 51 - Extended Hours)
North Vancouver -
New Microwave system and antenna proposal at 1959 Marine Dr. North Vancouver, BC
1959 Marine Drive North Vancouver BC -
Cates Park Foreshore Erosion Protection Project
North Vancouver -
Removal of Concrete Boat Launch
Removal of concrete boat launch -
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107)
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107) -
Pacific Enterprise Science Centre (PESC) Foreshore Maintenance
Pacific Enterprise Science Centre (PESC) -
Existing Dock Upgrade for 4659 Strathcona
Existing Dock Upgrade for 4659 Strathcona -
New Pile Installation for Recreational Dock
New Pile Installation for Recreational Dock -
Teal-Jones Maintenance Dredging
Teal-Jones Maintenance Dredging -
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request -
Rocky Point Park Boat Ramp Repair in Port Moody
Rocky Point Boat Ramp Repair in Port Moody -
Surrey Langley SkyTrain Project and Broadway Subway Project
Langley -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
District of North Vancouver Designated Anchorage Area
District of North Vancouver Designated Anchorage Area -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Installation of non-hydraulic boat lift
Installation of non-hydraulic boat lift -
Halo Sawmill Maintenance Dredging
Halo Sawmill Maintenance Dredging -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
New Float Installation for 2250 Farrer Cove Place
Public Notice New Float Installation for 2250 Farrer Cove Place -
Katzie First Nation Shoreline Clean Up
Pitt Meadows -
Langley Outfall Maintenance Dredging
Langley Outfall Maintenance Dredging -
Burnco Langley Maintenance Dredging Project
Burnco Langley Maintenance Dredging Project -
Golden Ears Forcemain (GDEFM) Project
Golden Ears Forcemain Project -
Stormwater outfall and dike upgrades
Stormwater outfall and dike upgrades -
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment -
Campground Kiosk Install
Gulf Islands National Park Reserve -
Sidney Spit Buoy Upgrades
Gulf Islands National Park Reserve -
Creosote Pile Removal and Disposal - Extension PER No. 19-022-01
Creosote Pile Removal and Disposal - Extension PER No. 19-022-01 -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours) -
Establishing Shrubs in Protective Fenced Areas to Facilitate Forest Restoration on Sidney Island
Gulf Islands National Park Reserve -
Maintenance Dredging, Fraser River, Small Craft Harbours
Kanaka Landing -
Control of English Hawthorn on Sidney Island
Gulf Islands National Park Reserve -
Maintenance Dredging, Fraser River, Small Craft Harbours
McMillan Island Harbour -
Institute of Ocean Sciences Patricia Bay - Wharf Waterline Replacement
The Institute of Ocean Sciences is located in Sidney BC. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Institute of Ocean Sciences Patricia Bay - Wharf refurbishment
The Institute of Ocean Sciences is located in Sidney BC, on Vancouver Island. The facility is accessible via road access, as well as by water. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Institute of Ocean Sciences Patricia Bay - Miscellaneous Repairs 2020
The Institute of Ocean Sciences is located in Sidney BC. The facility is accessible via road access, as well as by water for vessel/barge access. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Construction of a Distribution Warehouse
Victoria International Airport -
Blue Heron Aeropark Construction of Aircraft Hangars
Victoria International Airport YYJ -
Western Canadian Marine Response Corporation (WCMRC) Saanich Base
Victoria International Airport (YYJ) -
Titan Boats Construction of a Boat Manufacturing Facility
Victoria International Airport (YYJ) -
Temporary Installation of Remotely Piloted Aircraft System (RPAS) Detection Equipment
Victoria International Airport -
Modification of Existing Petroleum Storage Facility
Victoria International Airport -
Maintenance Dredging, Fraser River, Small Craft Harbours
McIvors Landing -
Replacement of the Aldergrove Weather Radar
26600 8th Avenue, Langley, BC V0X 1A0 -
Gibsons Small Craft Harbour Wharf Reconstruction
Gibsons Landing Small Craft Harbour -
Pauquachin Legacy Gathering Space
Cole Bay No. 3 Reserve (Pauquachin First Nation), North Saanich BC -
Maintenance Dredging, Fraser River, Small Craft Harbours
Whonnock Harbour -
GRT Holdings Ltd. Construction and Operation of Soil Treatment Facility -DUKE POINT
Nanaimo -
Telus Communications Inc. Radiocommunication Antenna Addition on Sechelt Band Lands No 2 Reserve, Sechelt BC
5411 Reservoir Road Sechelt BC, Sunshine Coast area on the Sechelt Band Lands No 2 Reserve -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
Exterior Landscape Redesign
60 Front Street Nanaimo -
Nanaimo to Protection Island Submarine Cable Replacement Project
Nanaimo -
BURNCO Aggregate Mine Project
Howe Sound -
Maintenance Dredging, Fraser River, Small Craft Harbours
Mission Harbour -
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities) -
Porpoise Bay Harbour Boat Grid Removal
Porpoise Bay Harbour -
Construction of a Boat Storage Facility at Colwood, CFB Esquimalt
CFB Esquimalt's Colwood property, located in the municipality of Colwood. -
Replacement and Installation of New Base Security Cameras - Colwood and Naden, Canadian Forces Base (CFB) Esquimalt
CFB Esquimalt Colwood property, located in Victoria -
Pedestrian Walkway Extension Lot B1
Esquimalt Graving Dock -
G Jetty and Jetty 11 Remediation in Esquimalt Harbour
Colwood, Esquimalt Harbour, located in the municipality of Colwood British Columbia -
Colwood Fuel Oil Depot - Air Scrubber
Colwood Fuel Oil Depot, Rosebank Road, Colwood -
EastEnd Dock Extension-Dock Floor/Wall Refurbishment
Esquimalt Graving Dock -
Replacement and Installation of New Base Security Cameras - Colwood and Naden, Canadian Forces Base (CFB) Esquimalt
CFB Esquimalt Naden property, located in Victoria -
Drydock Leak Repairs at HMC Dockyard, Canadian Forces Base Esquimalt
Her Majesty's Canadian Dockyard, Esquimalt Harbour -
Victoria Coast Guard Base - Timber Fender Replacement
This project is located on the wharf at the Victoria Coast Guard Base, 25 Huron Street, Victoria, BC. The base is accessible via road access, as well as by water for vessel and barge access. -
Canadian Coast Guard Victoria Base Wharf Refurbishment
The Victoria Coast Guard Base in James Bay, Victoria, British Columbia. The base is situated 2km from downtown Victoria, and lies on the edge of the Victoria's inner harbour, which eventually funnels out into the Strait of Juan de Fuca. -
Canadian Coast Guard Victoria Search and Rescue Float
25 Huron Street, Victoria BC, V8V 4V9 -
Royal Roads University - Japanese Gardens Drainage Upgrades
Royal Roads University, 2005 Sooke Road, Colwood -
Royal Roads University Sustainability Initiative - Overhead Service Upgrades (Lower Campus)
Royal Roads University in Colwood -
Royal Roads University Recreation Centre Change Room Renovation Project
Royal Roads University campus, in the municipality of Colwood, British Columbia -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Woodfibre LNG Project
Howe Sound -
Install Security Cameras at Winchelsea Island
Winchelsea Island, which is part of the Canadian Forces Maritime Experimental Test Ranges (CFMETR), in Nanoose Bay -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Albert Head Road, Metchosin -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Mary Hill - 5300 William Head Road, Metchosin -
Canadian Forces Ammunition Depot (CFAD) Rocky Point Main Gates Recapitalization
CFAD Rocky Point, located in the municipality of Metchosin, BC. -
Connect Municipal Water Supply to Canadian Forces Ammunition Depot (CFAD) Rocky Point
Canadian Forces Ammunition Depot (CFAD) Rocky Point , Metchosin -
Bivouac Site, OPSEE Training Area
OPSEE Training Area, Vance road, Cultus Lake -
SAY Community Centre
Skowkale No. 10 Reserve Land -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
TOPAZ Submarine fibre-optic cable
Port Alberni -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Raven Underground Coal Mine Project
Buckley Bay -
City of Powell River - Consolidated Waste Water Treatment Project
Powell River -
Kwispaa LNG Project
10 kilometres northeast of Bamfield -
Canadian Coast Guard - Cape Lazo BC - Oceans Protection Plan - Marine Safety System Modernization Initiative
Cape Lazo -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
Contaminated Site Remediation: Grice Bay and McLean Point
Pacific Rim National Park Reserve -
Kingsvale-Oliver Reinforcement Project
Kingsvale