Deroche Creek Long Term Solutions

The Deroche Creek Long-Term Solution Project encompasses Reaches 1, 2 and 3 on the lower alluvial fan. The scope of the Project includes the following major work items, listed from downstream (Reach 1) to upstream (Reach 3) :
• Excavation of a secondary pilot channel in Nicomen Slough where it cuts through the toe of the fan deposit at the downstream extent of Reach 1.
• Construction of two deflection berms extending out from Taylor Rd into Nicomen Slough, located west of the creek in Reach 1 (Downstream of Taylor Rd).
• Construction of a sediment basin in Reach 2 (between Taylor Rd and North Nicomen Rd), including armouring of inlet/ outlet of the basin for grade control, and bank stabilization.
• Armouring of the channel bed at the Taylor Rd. Bridge to prevent future degradation due to the sediment basin.
• Bank stabilization within Reach 3.


Latest update

The public comment period closed December 29, 2023.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - February 12, 2024
1 Notice of Intent to Make a Determination - Start of Public Comment Period - November 30, 2023

Contacts

Indigenous Services Canada
Rachelle Ormond, Senior Engineer
Suite 600, 1138 Melville St
Vancouver, British Columbia V6E 4S3
Telephone: 604-363-0081
Email: rachelle.ormond3@canada.ca


  • Location

    • Deroche Creek (British Columbia)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2023-11-30
  • Proponent

    Ministry of Environment and Climate Change Strategy
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    86132