Pacific Elevators New Dust Control System and Access

Viterra Pacific are proposing to install a new dust control filter and fan system that will replace four existing dust filters and fans currently located on the track shed roof at a new location at their terminal at 1803 Stewart Street in Vancouver BC. The new dust control filter and fan system will be 14.6 metres high and have a footprint of 6 square metres and will require the construction of a new stair tower and adjoining access bridge. The works are expected to take place over a two month duration, with completion anticipated towards the end of summer 2021.


Latest update

Notice of Determination

Vancouver, B.C. –December 1, 2020– The Vancouver Fraser Port Authority has determined that the proposed Pacific Elevators new dust control system and access located at 1803 Stewart Avenue, Vancouver, BC is not likely to cause significant adverse environmental effects..

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Pacific Elevators New Dust Control System and Access (British Columbia)
  • Nature of Activity

    • Maintenance activities (fences, walls)
  • Assessment Status

    Completed
  • Start Date

    2020-08-14
  • Proponent

    Viterra Pacific
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80929
Disclaimer