Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

860 results

Project Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84272
  • Last Modified: 2023-01-26
  • Relevance: 799.98
  • The Lodge at Bow Lake is proposing to replace a staff accommodation building and install a temporary staff dining tent on their leasehold. The project also includes creation of a new gravel parking lot for guest parking located adjacent to Highway 93 North and an existing Parks Canada public parking lot. The proposed parking lot will be approximately 1,259 m2 (36 stalls) located on a previously disturbed site currently used for staging. An equivalent size of land will be removed from the ...

Project R30 Fort Frederick Tower Masonry Repairs - Phase 2 - Royal Military College of Canada

  • Location (Royal Military College of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84270
  • Last Modified: 2023-01-25
  • Relevance: 799.89
  • The Department of National Defence (DND) has proposed a project. This is multi-year project that has been divided into three phases to date. Previous project phases included, Phase 1, as an experimental phase for one part of the Fort Frederick curtain wall and more work on the wall was required in future phases. Phase 1B of the Fort Frederick Restoration was an experimental stage for work around one window and one caponier of the Martello Tower, R30. The caponier is now complete. This ...

Project Proposed In Situ Abandonment of an Existing Retired Sewer Located on 155 and 170 Island Park Drive

  • Location (Island Park Drive, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84269
  • Last Modified: 2023-01-25
  • Relevance: 799.87
  • The City of Ottawa is undertaking the abandonment of approximately 1500 meters of an existing, retired and not in-service City of Ottawa owned sanitary sewer on vacant lands and lands occupied by transportation infrastructure owned by the National Capital Commission (NCC).   The overall site of the proposed abandonment is located within and adjacent to the Sir John A. Macdonald Parkway Corridor, between Churchill Avenue and Patricia Avenue in Ottawa. NCC properties affected by the ...

Project Hiawatha First Nation Water Treatment System Upgrades

  • Location (Project Area, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84268
  • Last Modified: 2023-01-25
  • Relevance: 799.86
  • The proposed project aims to address critical health and safety risks of inadequately treated groundwater used by residents of Hiawatha First Nation. It involves the construction of 14 Point-of-Entry (POE) systems, connecting 11 homes to a planned water distribution system, and the construction of drilled wells for 10 homes. The project will take place on developed land and include minor clearing of grub and vegetation on site as needed. The project does not include works in water, however, the ...

Project Rehabilitation of the Whitefish Bay Water Distribution System

  • Location (Project Area, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84267
  • Last Modified: 2023-01-25
  • Relevance: 799.86
  • This project entails the replacement of aged and undersized watermain in Lac Seul First Nation to meet current water demands and fire protection, in accordance with current regulations and standards. The existing 50mm watermain is significantly undersized and is insufficient and poses a significant health and safety risk to the community. Specifically, the infrastructure upgrades to be completed include:  • Replacement of the aged and undersized 50mm watermain, with the properly ...

Project St. Theresa Point First Nation - Old Bulk Fuels Decommissioning

  • Location (St. Theresa Point First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84266
  • Last Modified: 2023-01-25
  • Relevance: 799.86
  • STPMG, the group responsible for the bulk fuel farms, has proved by monitoring fuel consumption that the community's fuel usage has increased from 150,000 to 200,000 litres per month thus increasing the new bulk fuels site on-year fuel storage capacity from 1.8 million to 2.4 million liters per year. The community is using the old bulk fuel storage facility to overcome the shortage in fuel storage. In 2017, Neegan Burnside in their report concluded that it would be most feasible  for ...

Project L150 Anchor Inspection and Repair

  • Location (Wood Buffalo National Park of Canada, Northwest Territories)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84265
  • Last Modified: 2023-01-25
  • Relevance: 799.85
  • NTPC is currently planning an anchor degradation study for L150 transmission line. The initial inspection phase of the project will be conducted outside of the migratory bird nesting period from late July to the end of August, 2023. Excavation work will take place during the fall months. The L-150 is a 115 kV transmission line that forms the South Slave Power Grid, it comprises of approximately 800 Guyed-Y aluminum transmission towers. The length of the transmission line spans 285 km and is ...

Project Loggicroft DFO-SCH Shore Protection, Float Realignment and Dredge Spoil Removal

  • Location (The project is taking place at Loggiecroft Small Craft Harbour (Kouchibouguac Park), Kent County, New Brunswick., New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83961
  • Last Modified: 2023-01-25
  • Relevance: 799.85
  • The Loggicroft DFO-SCH requires the installation of additional amour stone using the same footprint as the existing armour stone on site for continued safe harbour operations. New concrete anchor blocks will be installed to hold the three floating piers. Dredge materials stored on site will be removed to an approved site and the area will be graded and landscaped.   The proposed activities are expected to take place between November 01, 2022 and March 31, 2023. Project commencement ...

Project Commissary Accessibility Marina Park Society - Shelburne, NS

  • Location (Shelburne, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84264
  • Last Modified: 2023-01-25
  • Relevance: 799.85
  • The proposed project will involve the construction of a public not-for-profit handicap, mobility impaired accessible marina on the shore of Shelburne harbor, Nova Scotia. The project will involving the installation of floating docks on the waters beside the shore and attached to the land above the water line, the construction of a parking lot and the construction of a small maintenance/admin building on top of a concrete slab on undeveloped and unused land. There will be no infilling of the ...

Project Underground stormwater retention basin project of the Chevreuil outfall

  • Location (Omer Lainé Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83989
  • Last Modified: 2023-01-25
  • Relevance: 799.85
  • Following a rain event in the fall of 2017, the Huron-Wendat Nation Council noticed a surface overflow of stormwater at the intersection of Chevreuil and Chief Stanislas Koska streets.  In this sense, to improve the conditions of the storm sewer system, the Council of the Huron-Wendat Nation wishes to set up a retention and control basin of the storm flow. The surface area of the basin is 3600 square meters (60m x 60m by 2.5m to a depth of 3.5m). The underground basin will be made of ...

Project Annacis Water Main No. 2 Scour Protection project

  • Location (Annacis Water Main No. 2 Scour Protection project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84262
  • Last Modified: 2023-01-24
  • Relevance: 799.74
  • The proposed project  Metro Vancouver's Greater Vancouver Water District is proposing to place a blended rock apron for scour protection over the Annacis Main No. 2 within the Annacis Chanel of the Fraser River near New Westminster, B.C. Scour protection is required to cover exposed areas of the pipe and to repair inadequate scour protection placed in 2019. Project works are proposed to occur outside the navigation channel.   The Project will consist of placement of ...

Project RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84261
  • Last Modified: 2023-01-24
  • Relevance: 799.74
  • A 15 m wide, 498.3 m long right of way easement will provide for the construction and operation of a  pipeline that will transport natural gas.  Construction of the pipeline and reclamation of the right of way will be completed within the first year of the project.  Following decommissioning of the pipeline, the right of way will be surrendered. The project is located in Frog Lake First Nation. The proponent is West Lake Energy Corp.

Project White Lake Partial Wharf Removal

  • Location (White Lake, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84259
  • Last Modified: 2023-01-24
  • Relevance: 799.73
  • Fisheries and Oceans Canada's Small Craft Harbours (SCH) intends to remove a portion of the exisitng wharf at White Lake Small Craft Harbour. The end of the wharf has deteriorated over time and SCH intends to remove the end portion to maintain structure safety and integrity. This work includes removal of the existing concrete deck and steel components over an area of approximately 5.5m2.  

Project Wharf Reconstruction at MacLeod Point's (Ingonish) Small Craft Harbour, Victoria County, NS

  • Location (MacLeod Point SCH is located in the community of Ingonish, Victoria County, Nova Scotia. It is located on the northeast coast of Cape Breton Island. It is accessible from Wharf Road via Highway #30., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84260
  • Last Modified: 2023-01-24
  • Relevance: 799.73
  • The proposed harbour improvements at MacLeod Point (Ingonish) SCH, Victoria County, NS will include removal and replacement of the existing wharf and shoreline protection. The proposed project will result in an increase to the existing footprint of approximately 250 m2 within the footprint of the reinstated shoreline protection. The existing timber piled, ell shaped wharf, including concrete deck (stem) and timber deck (ell) will be removed to expose the existing timber cribwork to allow ...

Project Canadian Coast Guard Port Weller Search and Rescue Station Dock Replacement

  • Location (St. Catharines, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84216
  • Last Modified: 2023-01-24
  • Relevance: 799.73
  • Fisheries and Oceans Canada owns, operates, and maintains a Canadian Coast Guard Search and Rescue Station in Port Weller, Ontario, a tiny community that is part of the City of St. Catharines. Seasonal marine search and rescue operations for Lake Ontario and the surrounding local waterways are carried out between March and December from this strategically located site. The Search and Rescue Station is located on the western manmade breakwater at the northern terminus of the Welland Canal. ...

Project Sweetgrass Daycare and Early Learning Head Start Centre Project

  • Location (Saskatoon, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84177
  • Last Modified: 2023-01-24
  • Relevance: 799.68
  • The proposed project is the construction of a New K-12 School with an area of 3,871 m2, including parking area and access road, playing fields, rink, fenced playground areas, and extension of the community's water, sewer, power, and gas infrastructure to support the new building. The farmland will only need to be graded to the extent required to ensure positive drainage away from the new building and off the developed green areas - no clearing of vegetation is required. Excavation will ...

Project Wharf Reconstruction at the Hampton Fisheries and Oceans Canada Small Craft Harbour, Annapolis County, Nova Scotia

  • Location (Hampton DFO-SCH, Hampton Wharf Road, Annapolis County, Nova Scotia, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84258
  • Last Modified: 2023-01-23
  • Relevance: 799.61
  • Fisheries and Oceans Canada – Small Craft Harbours (DFO-SCH) proposes to reconstruct a wharf and approach at Hampton DFO-SCH, Annapolis County, Nova Scotia. The existing structures will be removed and replaced with a new timber cribwork structure. The new structure will have a total length of approximately 48.90 m and width varying from 6.1 m to 7.6 m, with an approximate footprint of 340 m2, all of which will be within the existing wharf footprint. The existing gravel surface and ...

Project Redevelopment of the Wapizagonke, Waber and Anticagamac trails, La Mauricie National Park

  • Location (La Mauricie National Park of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84199
  • Last Modified: 2023-01-21
  • Relevance: 799.35
  • The high popularity and use of the Wapizagonke, Waber and Anticagamac trails in La Mauricie National Park over the years has led to an accelerated degradation of the walking surface, necessitating a review of the entire trail network in the sector and the need for major rehabilitation work. The majority of the work to be done is routine trail maintenance. There is a need to raise the trail bed to backfill roots or fill in gullies created by trampling, to build berms to promote water management ...

Project Trial Islands Lightstation - New Desalinator and Freshwater Distribution System

  • Location (Trial Islands Lightstation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83971
  • Last Modified: 2023-01-21
  • Relevance: 799.35
  • DFO and CCG are proposing to install a seawater desalinator unit at the Trial Islands Lightstation. The lightstation is staffed by two lightkeepers 24/7. Rainwater collection is the staff's main source of water supply. Due to yearly water shortages on Trial Islands Lightstation, the source of rainwater is not sufficient to support onsite operations. The proposed design was chosen as it utilizes existing infrastructure and minimizes ground disturbance. The construction will take place in the ...

Project North Rustico DFO-SCH Wharf Reconstruction

  • Location (North Rustico SCH, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84257
  • Last Modified: 2023-01-20
  • Relevance: 799.32
  • North Rustico SCH's existing breakwater structure has, after years of aging and weathering from ice, pounding surf and storm events, deteriorated to the point requiring major reconstruction. The existing structure's stone filled interior will be partially removed to allow for the installation of new steel sheet piling and tie rods. New mainland rock will replace the eroding sandstone rock within the structure as well as being added to the north side of the breakwater as an armourstone ...

Project Bay Fortune Wharf & Launching Ramp Reconstruction (Structures 410 and 503)

  • Location (Bay Fortune SCH, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84256
  • Last Modified: 2023-01-20
  • Relevance: 799.31
  • Bay Fortune's Small Craft Harbour wharf and launching ramp currently require reconstruction because of infrastructure deterioration caused by of years of aging, the effects of weather and, in particular, storm events. The launching ramp requires replacement of the decking timbers while the southern section of wharf immediately parallel to the bait sheds requires replacement of the concrete decking with a raised concrete deck to take into account sea-level rise. The existing timber wharf ...

Project Alberton (Northport) Wharf Reconstruction (Structure 412)

  • Location (Alberton (Northport) SCH, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84255
  • Last Modified: 2023-01-20
  • Relevance: 799.31
  • Alberton (Northport) SCH requires the reconstruction of a section of inner harbour wharf that has began to fail and is no longer safe to use. The existing 12 meter section of wharf to be replaced was constructed over an existing launching ramp over 40 years ago that was no longer in use. The timber decking supported by steel beams has since partially collapsed. The timber decking and fenders along with the steel beams and former concrete launching ramp will removed and a new steel sheet pile ...

Project Miminegash DFO-SCH South Breakwater Reconstruction

  • Location (Miminegash SCH, Queens county, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84254
  • Last Modified: 2023-01-20
  • Relevance: 799.31
  • Miminegash Small Craft Harbour (SCH) requires the replacement of the aging steel sheet piling located along the harbour channel entrance with steel tie-back anchors connecting each side. The steel sheet piling will be driven in behind the existing wall to prevent narrowing of the harbour entrance run. The old steel sheet piling will then be cut and removed. Cavities within the sheet piles will be filled with stone. Armour stone protection will be installed on the south side of the ...

Project Lac Philippe Camping Lagoon Rehabilitation

  • Location (lac Philippe, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84253
  • Last Modified: 2023-01-20
  • Relevance: 799.31
  • The lac Philippe campground is a major recreational site in Gatineau Park, located within the township of Sainte-Cécile-de-Masham in Quebec. Designed and built in the 1950-60s, many of its assets have reached the end of their life cycle.    The campground uses a sanitary lagoon, built in the 1970s, for the treatment of sewage from the campground. After over 40 years of operation, the lagoon requires the accumulated sludge to be removed. To accommodate equipment to safely ...

Project Scarlett Point Lightstation Fuel Tank Replacement

  • Location (The Scarlett Point Lightstation is located on Balaklava Island, near Port Hardy, BC. It can be accessed by ship offshore or by helicopter only. The light tower is recognized as a Federal Heritage Building through the Lighthouse Protection Act., British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84252
  • Last Modified: 2023-01-20
  • Relevance: 799.31
  • DFO and CCG are proposing to replace the diesel fuel tanks at the Scarlett Point Lightstation. The lightstation is staffed by two lightkeepers 24/7 as per maritime safety requirements. Currently, the station is powered by diesel fuel powered generators, which supply electricity to the three residences, radio communication equipment, weather monitoring system, and the many other buildings and assets on station. The current diesel fuel tanks are at their end of service and need to be ...

Project Lac Philippe Camping Rehabilitation

  • Location (lac Philippe, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84251
  • Last Modified: 2023-01-20
  • Relevance: 799.31
  • The lac Philippe campground is a major recreational and accommodation attraction in Gatineau Park, located within the township of Sainte-Cécile-de-Masham in Quebec. Designed and built in the 1950-60s, many of its assets have reached the end of their life cycle and the camping offer lacks many of the services and amenities offered in the regional and national camping markets. Infrastructure throughout the campground and associated buildings needs upgrading, maintenance, or modification to ...

Project Plumbing System Replacement - CCHM - S5-8

  • Location (Chambly Canal National Historic Site of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84194
  • Last Modified: 2023-01-20
  • Relevance: 799.24
  • The septic tanks at Locks 5 and 8 of the Chambly Canal are at the end of their life cycle and show signs of advanced deterioration, with the potential for soil contamination. The metal tanks are extremely corroded, which suggests that the contents of the tanks have percolated into the surrounding soil. A soil characterization is required to determine the degree of soil contamination, if any. The metal pits will be replaced with concrete pits. 

Project Ivory Island Lightstation - Septic System Replacement

  • Location (Ivory Island Lightstation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84186
  • Last Modified: 2023-01-20
  • Relevance: 799.24
  • DFO and CCG are proposing to install a new septic system at the Ivory Island Lightstation. Ivory Island Lightstation is a staffed site located on the east side of Milbanke Sound, in British Columbia.   Ivory Island's septic treatment system has reached the end of its serviceable life and is not up to the current regulatory sanitary code requirements according to the Provincial Sewerage System Standard Practice Manual.  The existing system is comprised of one concrete tank ...

Project Solar Microgrid for Bayside Travel Centre

  • Location (Bayside Travel Centre, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84243
  • Last Modified: 2023-01-19
  • Relevance: 799.19
  • Bayside Development Corporation, a business wholly owned by the Paq'tnkek First Nation, is proposing to design, procure, and install a DC microgrid system that incorporates solar PV, battery storage, and electric vehicle (EV) charging systems for the Paq'tnkek Mi'kmaw Nation-owned Bayside Travel Centre. The Bayside Travel Centre currently houses amenities such as a gas bar, convenience store, truckers' lounge, information centre, and two quick-service restaurants. The project is ...

Project White's Portage Dam Replacement, Trent-Severn Waterway

  • Location (Trent-Severn Waterway National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84147
  • Last Modified: 2023-01-19
  • Relevance: 799.19
  • The project is a complete replacement of the dam. The scope of work includes 2-phased reconstruction of the existing structure. Project activities include, but are not limited to, replacement of the dam complete with abutments, sluices, new stop logs, new machinery, new decks, operator safety features, railing for public safety, landscape and embankment works, commissioning, demolition of the old dam and site restoration. The dam is to be built in two phases and will last 2 years. Due to the ...

Project Bingwi Neyaashi Anishinaabek (196) Lot Servicing and Pre-Construction

  • Location (Bingwi Neyaashi Anishinaabek, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84023
  • Last Modified: 2023-01-19
  • Relevance: 799.19
  • The project entails the creation / contstruction of infrastruture for lot development. This includes; roads, culverts, septic systems, wells, drainage systems, electrical connections and residential dwellings.  The lot servicing activities being applied for are an immediate need since BNA wants to ensure that the environment and water-bodies are protected, while at the same time developing their community on the eastern shore of Lake Nipigon. The lot servicing activities being applied ...

Project Dixon Bridge Replacement

  • Location (Grasslands National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84244
  • Last Modified: 2023-01-19
  • Relevance: 799.19
  • The Dixon Bridge is a two 6.1 m span timber bridge across the Frenchmen River in southwest Saskatchewan, built in 1965. It is at the end of its service life and requires replacement. The bridge provides critical access through the park. Proposed work is to deconstruct the existing bridge and construct a new three-span 6 m -18 m - 6 m that will reduce issues of flooding and bridge damage from ice flows. A temporary bridge will be constructed prior to decommissioning the old bridge to maintain ...

Project Keltic Road Infrastructure Upgrades (East)

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84249
  • Last Modified: 2023-01-19
  • Relevance: 799.19
  • Extensive infrastructure upgrades are needed at the eastern end of the Keltic In Road on the Middle Head peninsula in Cape Breton Highlands National Park. The proposed project includes work to underground and underground-to-surface infrastructure and above-ground to subsurface works, as outlined below. Underground and underground to surface infrastructure: · Force-main, sanitary sewer, sanitary services to buildings or other · Electrical line · Water-main, water ...

Project Estevan Point Lightstation - Septic System Replacement

  • Location (Estevan Point Lightstation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84185
  • Last Modified: 2023-01-19
  • Relevance: 799.13
  • DFO and CCG are proposing to install a new septic system at Estevan Point Lightstation. Estevan Point Lightstation is a staffed federal heritage site located on the west coast of Vancouver Island in the Hesquiat Peninsula.   The Estevan Point's septic treatment system has reached the end of its serviceable life and is not up to the current regulatory sanitary code requirements according to the Provincial Sewerage System Standard Practice Manual. There are three existing tanks at ...

Project New electrical service to existing building at 80 Hangar Line Road

  • Location (Winnipeg Richardson International Airport (YWG), Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84207
  • Last Modified: 2023-01-18
  • Relevance: 799.13
  • Winnipeg Airports Authority must determine whether the proposed installation of new electrical service to an existing building at Winnipeg Richardson International Airport (YWG), located in Winnipeg, Manitoba is likely to cause significant adverse environmental effects. To help inform this determination, Winnipeg Airports Authority is inviting comments from the public until January 29, 2023 respecting that determination. All comments received will be considered public and may be posted ...

Project 38 Bollards Installation- Canadian Forces Base Bagotville

  • Location (Canadian Forces Base Bagotville, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84246
  • Last Modified: 2023-01-18
  • Relevance: 799.1
  • The Department of National Defence (DND) has proposed a project which involves work execution as well as labour supply, materials and tools necessary for bollards installation to protect transformers that are located in different places of the Canadian Forces Base Bagotville. The work includes excavations to a depth of 1.4 meters with a manual auger. Then, the galvanized steel bollards, which have a diameter of 17 centimeters, will be installed with a length of 1 meter above the ground. Since ...

Project New Dock Installation 242 Turtlehead Road

  • Location (New Dock Installation 242 Turtlehead Road, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84245
  • Last Modified: 2023-01-18
  • Relevance: 799.09
  • The proposed project The proposed dock includes the following features:  Lower landing of an approximately 18 metre long pedestrian tram that is located mostly outside of the Port Authority's jurisdiction to provide access from the upland owner's residence to the fixed platform.   Approximately 15 square metre aluminum fixed platform (between the tram and gangway), with four aluminum legs that would be drilled into bedrock with stainless steel ...

Project Demolition of the Portneuf Wharf and Sediment Remediation

  • Location (Portneuf Wharf, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84140
  • Last Modified: 2023-01-18
  • Relevance: 799.09
  • The Portneuf port infrastructure was built between 1956 and 1962. It consists of a long pier of approximately 950 linear meters and a wharf head mainly mostly made of a creosote wood structure. These wooden boxes are surmounted by concrete weight walls and it's main facade is made of steel sheet piles. The wharf's backfill and the surrounding seabed are contaminated mainly by polycyclic aromatic hydrocarbons (PAH) and mercury. The present project is a remediation project which ...

Project Queensgate Routine Maintenance Dredging

  • Location (Queensgate Routine Maintenance Dredging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84189
  • Last Modified: 2023-01-18
  • Relevance: 799.03
  • The proposed project Queensgate Marina proposes to conduct maintenance dredging to establish safe navigation and moorage for house floats and vessels at its facility located within Annacis Channel at 798 South Dyke Road, New Westminster. The scope of works includes dredging a footprint of approximately 4,000 square meters to a target dredge depth of -2.5 metres chart datum. The total dredge volume will be approximately 6,000 cubic metres. Dredging will be completed with a barge-mounted crane ...

Project Shellburn Berthing Dolphin Replacement Project - PER No. 20-012-05 - Extension - Public comments invited

  • Location (Burnaby, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80510
  • Last Modified: 2023-01-18
  • Relevance: 799.03
  • The Proposed Project Amendment Shell Canada Products Ltd. proposes to carry out physical activities related to the replacement of four existing berthing dolphins and the installation of a fifth berthing dolphin at the Shellburn facility up until February 28, 2024. This would require an extension to the approved project permit (PER 20-012-04), which has an expiry date of June 30, 2023.  In-water works have been planned to occur during least-risk windows for the protection of fish and ...

Project OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad

  • Location (OS-6825, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84240
  • Last Modified: 2023-01-17
  • Relevance: 798.99
  • A surface lease consisting of a 155.7 m long access road and 2.36 ha area extension for drilling and operating a multi-well oil pad will be constructed and maintained for the operating life of the wells, then decommissioned and reclaimed before the lease agreement is surrendered. The proposed wellsite extension has been located along the south boundary of the existing 16D-14-56-3W4M padsite, which had been constructed but not drilled at the time of the field assessment and application. The ...

Project Tobacco Plains Indian Band New Antenna Proposal for Existing Tower on the Tobacco Plains No. 2 Reserve

  • Location (Tobacco Plains Indian Band New Antenna Proposal for Existing Tower on the Tobacco Plains No. 2 Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84242
  • Last Modified: 2023-01-17
  • Relevance: 798.98
  • Tobacco Plains Indian Band New Antenna Proposal for Existing Tower on the Tobacco Plains No. 2 Reserve   Tobacco Plains Indian Band is proposing the installation of new radiocommunication antenna system on an existing tower 28 meters in height for public safety services, located on Tobacco Plains No. 2 Reserve.   An antenna consisting of one mounting mast with two circular dipoles (loops) attached, measuring 3.20 m in length and 1.01 m in width will be mounted to the ...

Project Rideau Canal Lighting Rehabilitation

  • Location (Rideau Canal, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84241
  • Last Modified: 2023-01-17
  • Relevance: 798.96
  • The National Capital Commission (NCC) proposes to rehabilitate the deteriorating lighting systems within the Rideau Canal corridor. All pathway lights and streetlights would be replaced.   The proposed project would take place on lands owned by the NCC and Parks Canada, and will be subject to a federal land use, design, and real estate transaction approval under the National Capital Act. The NCC and Parks Canada will make a joint determination under the Impact Assessment Act. The NCC ...

Project Range Maintenance 2023 Road Repairs - Canadian Forces Base Suffield

  • Location (Canadian Forces Base Suffield, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84239
  • Last Modified: 2023-01-16
  • Relevance: 798.88
  • The Department of National Defence (DND) has proposed a project. Annual submission for all road repairs/maintenance/replacements on the Base including culverts, minor road repair (grading, gravel application, etc.) to address washouts, rutting, etc., usage of barricades (concrete blocks, boulders) and ditch work (contouring, resloping, drainage channels, etc.).

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Assessment Type Display Filters

Authorities Display Filters

Date modified: