TOPAZ Submarine fibre-optic cable

The Proposed Project

TOPAZ Cable System

The proposed submarine fibreoptic cable system – Topaz - consists of a main cable between Port Alberni, BC and, in Japan, Shima (Mie prefecture) to the South, and Takahagi (Ibaraki Prefecture) to the North. In addition, a second cable for future development will extend from Port Alberni and terminate at the headlands of Barkley Sound.

 

The Topaz submarine cable system will extend from an existing telecommunications facility near Canal Beach in Port Alberni and will follow Alberni Inlet to the ocean. The main cable will extend onto the continental shelf and then follow a Northern Pacific route to Japan. The second cable will terminate at the headlands of Barkley Sound and is intended to minimize nearshore disturbances when  a second cable lands in  Canada in the future.

 

The Canadian point of origin for the Topaz system will be an existing land-based communications facility located in Port Alberni. The cables will transition from the facility to a beach manhole via an underground duct measuring approximately 200 metre and located approximately 1.2 m below existing grade. From the beach manhole the cables will access Alberni Inlet. The system will be surface lain within Alberni Inlet with burial starting towards the mouth of Trevor Channel. Burial will be undertaken by towed plough from Barkley Sound headlands (approx. 100 m water depth) to approximately 1500 m water depth. The system will be surface laid in water depths greater than 1500 m. Cable installation within Canadian waters is anticipated to be completed within a 2 week timeframe during the late Spring of 2021.

More


Latest update

Notice of Determination

08 June 2021 – Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.

 

This determination was based on a consideration of the following factors:

•    impacts on rights of Indigenous peoples; 
•    Indigenous knowledge;
•    community knowledge;
•    comments received from the public; and
•    technically and economically feasible mitigation measures.

 

Mitigation measures will be implemented for the following: seabed and sediment, marine water quality, marine fish and invertebrates, marine mammals, marine birds, atmospheric, acoustic and visual environment, marine use, land use, human health, heritage resources, indigenous rights.

 

Innovation, Science and Economic Development Canada is satisfied that carrying out the project is not likely to cause significant adverse environmental effects.  

 

Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.

Participate

Contacts

Innovation, Science and Economic Development
Ryan Calvery, Policy Advisor
Email: Ryan.Calvery2@ised-isde.gc.ca

Public Services and Procurement Canada
Mark McNeil, Senior Environmental Specialist
Telephone: 709-637-4481
Email: mark.mcneil@pwgsc-tpsgc.gc.ca


  • Location

    • Port Alberni (British Columbia)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2020-11-05
  • Proponent

    Google Canada
  • Authorities

    • Innovation, Science and Economic Development
  • Assessment Type

    Project on federal lands
  • Reference Number

    81122
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: