Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project.

FortisBC Energy Inc. is proposing to construct a new 161 km long natural gas transmission pipeline generally alongside the existing natural gas transmission pipeline between Kingsvale, B.C. and Oliver, B.C.

Note this project was formerly known as the Kingsvale-Oliver Reinforcement Project.

More


Latest update

January 08, 2016 - The assessment process has been terminated.

Participate

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca


  • Location

    • Kingsvale (British Columbia)
    • Oliver (British Columbia)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    Terminated
  • Proponent

    FortisBC Energy Inc.
  • Authorities

    • Canadian Environmental Assessment Agency
    • Indigenous and Northern Affairs Canada
  • Assessment Type

    Comprehensive study under CEAA 1992
  • Reference Number

    64738