Summerland Irrigation Infrastructure Rehabilitation
Project Description:
The existing irrigation system at the Summerland Research and Development Centre is 70-100 years old. The current system has reached the end of its expected life cycle and is experiencing failures to isolation valves and pressure reducing valves, as well as having significant leaks in the system. A feasibility study was completed in spring of 2020 and recommended replacing the underground pipe network with new steel and PVC pipe networks and provide new pressure relief valves and filtration stations. In total there is approximately 16.5 km of pipeline to be installed.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
The public comment period on the project is closed. Agriculture and Agri-Food Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects..
List all records
Contacts
Engineering and Environmental ServicesAgriculture and Agri-Food Canada
Daryl Nazar, Environmental Officer
300-2010-12 th. Avenue
Regina, Saskatchewan S4P 0M3
Telephone: 306-523-6696
Email: daryl.nazar@canada.ca
-
Location
- Summerland (British Columbia)
-
Project Type
- Water Management
-
Status
Completed -
Start Date
2020-09-18 -
Proponent
Agriculture and Agri-Food Canada -
Authorities
- Agriculture and Agri-Food Canada
-
Assessment Type
Project on federal lands -
Reference Number
81002
Nearby projects
..within 200 kilometres-
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Kingsvale-Oliver Reinforcement Project
Oliver -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Kingsvale-Oliver Reinforcement Project
Kingsvale -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Harper Creek Mine Project
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
SAY Community Centre
Skowkale No. 10 Reserve Land -
Parking Lot repave
301 3rd Street West, Revelstoke -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Maintenance Dredging, Fraser River, Small Craft Harbours
Mission Harbour -
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)