Phase 5 of the dust collector replacement program at the Viterra grain terminal in the port of Montreal

Phase 5 of a multi-year program to improve dust collection at Viterra's grain terminal (Elevator n°4) by replacing the cyclone systems with new higher efficiency bag-house dust collection systems. The scope of work also includes reconfiguration of air flows and the addition of a new dust collector to collect airborne dust generated during truck unloading operations.


Latest update

July 2nd, 2020 – The Montreal Port Authority (MPA) has determined that the proposed project Phase 5 of the dust collector replacement program at the Viterra grain terminal is not likely to cause significant adverse environmental effects.

 

Mitigation measures taken into account for this determination are:

  • Water, soil and air pollution prevention
  • Noise pollution prevention
  • Verify the presence of vulnerable or endangered species

 

Therefore, the MPA may perform any duty or function to enable the project to be carried out in whole or in part.

Participate

Contacts

Port of Montreal
2100, Pierre-Dupuy avenue, Wing 1
Montréal, Quebec H3C 3R5
Telephone: 514-283-7050
Email: communications@port-montreal.com


  • Location

    • Port of Montreal (Quebec) (Quebec)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2020-05-29
  • Proponent

    Viterra
  • Authorities

    • Montréal Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80743