YUL Montréal-Trudeau International Airport - Expansion of the Holding Bay of Runway 24L

The project consists of an expansion of the holding bay of Runway 24L which will increase the paved surface by approximately 19,500 m2. The holding bay of Runway 24L is located in the north-easterly area of Runway 06R-24L (South Runway). The work includes the relocation of drinking water and sanitary water pipes as well as the installation of safety equipment and related electrical infrastructure.


Latest update

April 26, 2024 – ADM Aéroports de Montréal issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects by applying the mitigation measures provided for in the project.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - April 26, 2024
1 Notice of Intent to Make a Determination - Start of Public Comment Period - January 26, 2024

Contacts

Public Affairs
ADM Aéroports de Montréal
800 Place Leigh-Capreol
Office 1000
Dorval, Quebec H4Y 0A5
Email: consultation-projets@admtl.com


  • Location

    • YUL Montreal-Trudeau International Airport (Quebec)
  • Nature of Activity

    • Airport and Airfields
  • Assessment Status

    Completed
  • Start Date

    2024-01-26
  • Proponent

    ADM Aéroports de Montréal
  • Authorities

    • Montreal Airport Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    87262