Wharf Construction, Lahave River, Bridgewater, NS:

The proposed project will involve the construction of a wharf made of pressure treated lumber that will reach 13.72 m from the shoreline, supported by one pier. The pier will be a prefab concrete pier measuring 3.66 m by 3.66 m for a footprint of 13.40 m2 located below the low water mark. The pier will be filled with granite stone approximately half way. There will be no excavation work required, instead only slight leveling in the 3.66 m x 3.66 m area where the actual wharf will be located.

 

15/11/21 – The public comment period on the project is closed. Transport Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

More


Latest update

[11-17-2021] – Transport Canada has issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects..

Participate

Contacts

Transport Canada
Melissa Ginn, Regional Environmental Advisor
10 Barter's Hill
St. John's, Newfoundland and Labrador A1C 6M1
Telephone: 709-351-3200 or 1-888-675-6863
Email: melissa.ginn@tc.gc.ca


  • Location

    • 180 Shoredrive (Nova Scotia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2021-10-13
  • Proponent

    Kevin Oakes
  • Authorities

    • Transport Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83095
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: