Wharf Replacement Pier 20 West and Pier 21

The proposed project is to replace the existing wharf structures (and

remove a building) at Pier 20 West and Pier 21, with a new concrete

deck wharf with steel pipe piles as well as the creation of additional

operational workspace and parking. See Appendix B for Design

Details.

The new wharf is to be designed to accommodate fish handling

operations including fishing vessels up to 30 meters in length, forklifts,

fuel trucks, boom trucks and loaded tractor trailers.

The new wharf will be similar in design/construction to the adjacent Pier

20, which was built in 2014. The existing treated timber fendering

system (replaced in 2014) is to remain in place as the berthing face for

the new facility. The upland will be capped with an asphalt surface to

provide working space and parking.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

January 19, 2021 - The assessment decision statement has been issued to the proponent.

Contacts

St. John's Port Authority
Brandon Russell, Technical Services Coordinator
1 Water Street, P.O. Box 6178
St. John's, Newfoundland and Labrador A1C 5X8
Telephone: 709-738-4782
Fax: 709-738-4784
Email: brussell@sjpa.com

St. John's Port Authority
Paul Sheppard, Manager, Technical Services
1 Water Street, P.O. Box 6178
St. John's, Newfoundland and Labrador A1C 5X8
Telephone: 709-738-4782
Fax: 709-738-4784
Email: psheppard@sjpa.com


  • Location

    • Pier 20/21 (Newfoundland and Labrador)
  • Project Type

    • Ports and Harbours
  • Status

    Completed
  • Start Date

    2020-11-20
  • Proponent

    St. John's Port Authority
  • Authorities

    • St. John's Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    81163

Nearby projects

..within 200 kilometres
Date modified: