Interior & Exterior Upgrades to Facility
The Proposed Project
The building was built in 1986. There is the main building and a shed on the premise. This is a one storey building with 349 square meters of total area. The structure is of a wood frame and concrete with metal siding and brick veneer on exterior. The statement of work includes both interior and exterior work. Exterior work is not limited to replacing walkways, driveway and parking lot, replacing lighting, and adding key pad and exterior post. Interior work is not limited to restructuring various rooms to meet RCMP requirements, including updating lighting throughout and upgrading fire alarm system. Estimated extent of repaving is approximately 1000 square meters.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Notice | - | October 1, 2020 |
List all records
Contacts
Royal Canadian Mounted Police73 Leikin Drive
Ottawa, Ontario K1A 0R2
Email: NtlEnvironmentalProgram-ProgrammeEnvironmentalNtl@rcmp-grc.gc.ca
-
Location
- New Wes Valley (Newfoundland and Labrador)
-
Project Type
- Other, not otherwise specified
-
Status
In progress -
Start Date
2020-10-01 -
Proponent
Royal Canadian Mounted Police -
Authorities
- Royal Canadian Mounted Police
-
Assessment Type
Project on federal lands -
Reference Number
81021
Nearby projects
..within 200 kilometres-
Puffin Island Fuel Tank Replacement
Puffin Island, Bonavista Bay, NL -
Comfort Cove Building Demolition
Comfort Cove -
Demolition of Cape Bonavista Loran A Site, Bonavista, Newfoundland and Labrador
The Cape Bonavista Loran A site was a long-range radio navigation station located approximately five kilometers north of Bonavista, Newfoundland and Labrador (NL) between Cape Shore Road to the West and the shoreline of Cape Bonavista to the East -
DFO-SCH Launchway Construction, Tilting, NL
Tilting, Newfoundland -
Water and Sewer Utility Systems Recapitalization - Phase 2
Terra Nova National Park -
Relocate Sewage Lift Station at Hangar 1, Canadian Forces Base 9 Wing Gander, Newfoundland and Labrador
Hangar 1, Canadian Forces Base 9 Wing Gander -
Breakwater Construction, Summerville, N.L.
Summerville, NL -
Capital work at the Port Blandford Marina
Town of Port Blandford -
DFO-SCH Boat Launchway Construction, Jenkins Cove (Twillingate), NL
Jenkins Cove -
Building and Associated Infrastructure Demolition at Canadian Forces Base 9 Wing Gander Careless Cove Site, Newfoundland and Labrador
Canadian Forces Base 9 Wing Gander Careless Cove Site, along Gander Lake -
DFO-SCH New Marginal Wharf and Floating Docks, Hickman's Harbour, NL
Hickmans Harbour -
DFO-SCH Finger Pier Extension, Old Perlican, NL
Old Perlican -
Demolition of the Rappel Tower at Canadian Forces Base Beaumont Hamel Armoury, Grand Falls - Windsor, Newfoundland and Labrador
Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor -
DFO-SCH Shoreline Restoration / Armourstone Installation, Harbour Grace, NL
Harbour Grace -
DFO-SCH Floating Dock Installation, Roberts Arm, NL
Roberts Arm -
Interior & Exterior Upgrades to Facility
Bell Island -
Material Lay-down Area
St. John's -
Wharf Replacement Pier 20 West and Pier 21
Pier 20/21 -
Canadian Coast Guard Demolition of Administration Building, Southside Road, St. John's, NL
Southside Road, St. John's, NL -
St. John's Building Retrofit Project
St. John's -
Installation of Septic Field
Cape Spear National Historic Site