The Proposed Project
The building was built in 1986. There is the main building and a shed on the premise. This is a one storey building with 349 square meters of total area. The structure is of a wood frame and concrete with metal siding and brick veneer on exterior. The statement of work includes both interior and exterior work. Exterior work is not limited to replacing walkways, driveway and parking lot, replacing lighting, and adding key pad and exterior post. Interior work is not limited to restructuring various rooms to meet RCMP requirements, including updating lighting throughout and upgrading fire alarm system. Estimated extent of repaving is approximately 1000 square meters.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | May 7, 2021 |
1 | Public Notice | - | October 1, 2020 |
Contacts
Royal Canadian Mounted PoliceKarani Karthikaikumar, Environmental Analyst
73 Leikin Drive
Ottawa, Ontario K1A 0R2
Email: NtlEnvironmentalProgram-ProgrammeEnvironmentalNtl@rcmp-grc.gc.ca
-
Location
- New Wes Valley (Newfoundland and Labrador)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2020-10-01 -
Proponent
Royal Canadian Mounted Police -
Authorities
- Royal Canadian Mounted Police
-
Assessment Type
Project on federal lands -
Reference Number
81021
Nearby assessments
...within 200 kilometres-
Floating Dock Reconstruction, Wesleyville (Brookfield), NL
Wesleyville -
Puffin Island Fuel Tank Replacement
Puffin Island, Bonavista Bay, NL -
Shoreline Protection Repairs, Musgrave Harbour, NL
The DFO-SCH project site is located in Musgrave Harbour, Newfoundland. -
Comfort Cove Building Demolition
Comfort Cove -
Fishway Refurbishment, Middle Brook, NL
Middle Brook, Newfoundland -
Water and Sewer Utilities System Recapitalisation - Phase 3
Terra Nova National Park -
Demolition of Cape Bonavista Loran A Site, Bonavista, Newfoundland and Labrador
The Cape Bonavista Loran A site was a long-range radio navigation station located approximately five kilometers north of Bonavista, Newfoundland and Labrador (NL) between Cape Shore Road to the West and the shoreline of Cape Bonavista to the East -
DFO-SCH Launchway Construction, Tilting, NL
Tilting, Newfoundland -
Fishway Refurbishment, Lower Terra Nova River, NL
The DFO-RPSS project site is located in Terra Nova, Newfoundland. -
Vegetation Maintenance along the Bell Aliant Fibre Optic Line
Terra Nova National Park -
Repair Cross Loop Access Road - Canadian Forces Station (CFS) Leitrim, Gander
Canadian Forces Station Leitrim, Gander -
Construction of a mountain bike skills trail in Newman Sound, Terra Nova National Park
Terra Nova National Park of Canada -
Water and Sewer Utility Systems Recapitalization - Phase 2
Terra Nova National Park -
Gander Very High Frequency Omni-directional Range (VOR) Replacement
Gander -
Entrance Washrooms Sanitary Rehabilitations
Terra Nova National Park -
Relocate Sewage Lift Station at Hangar 1, Canadian Forces Base 9 Wing Gander, Newfoundland and Labrador
Hangar 1, Canadian Forces Base 9 Wing Gander -
Construct New Military Family Resource Centre - Canadian Forces Base (CFB) Gander
Canadian Forces Base (CFB) Gander -
Accommodation for Wing Headquarters - 9 Wing Gander
9 Wing Gander -
Upgrade Building B160 for Occupancy - 9 Wing Gander
9 Wing Gander -
Breakwater Construction, Summerville, N.L.
Summerville, NL -
Construction of New Building - Canadian Forces Base (CFB) Gander
Canadian Forces Base (CFB) Gander -
Explosives Storage Area Fence Repairs at 9 Wing Gander, Canadian Forces Base Gander, Newfoundland and Labrador
9 Wing Gander -
Utility pole installation along the Bell Aliant fibre optic line in Terra Nova National Park
Terra Nova National Park -
Capital work at the Port Blandford Marina
Town of Port Blandford -
DFO-SCH Boat Launchway Construction, Jenkins Cove (Twillingate), NL
Jenkins Cove -
Building and Associated Infrastructure Demolition at Canadian Forces Base 9 Wing Gander Careless Cove Site, Newfoundland and Labrador
Canadian Forces Base 9 Wing Gander Careless Cove Site, along Gander Lake -
Lease Renewal - Lewisporte Marina
Lewisporte -
DFO-SCH New Marginal Wharf and Floating Docks, Hickman's Harbour, NL
Hickmans Harbour -
Wharf Reconstruction - Gooseberry Cove, Newfoundland
Gooseberry Cove -
DFO-SCH Finger Pier Extension, Old Perlican, NL
Old Perlican -
Wharf Reconstruction, Old Perlican, NL
The DFO-SCH project site is located in Old Perlican, Newfoundland. -
Wharf Reconstruction, Phillip's Head, NL
Phillip's Head, Newfoundland -
Marginal Wharf Construction, Little Heart's Ease, NL
Little Heart's Ease, Newfoundland -
Wharf Construction, Bay de Verde, Newfoundland
Bay de Verde -
Wharf Reconstruction, Winterton, Newfoundland
Winterton -
Wharf Reconstruction and Breakwater Extension, Ochre Pit Cove, NL
Ochre Pit Cove, Newfoundland -
Demolition of the Rappel Tower at Canadian Forces Base Beaumont Hamel Armoury, Grand Falls - Windsor, Newfoundland and Labrador
Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor -
Boat Launch Reconstruction, Arnold's Cove, NL
The DFO-SCH project site is located in Arnold's Cove, Newfoundland. -
Wharf Reconstruction, Carbonear, Newfoundland
Carbonear -
Marginal Wharf Construction, Lushes Bight, NL
The DFO-SCH project site is located in Lushes Bight, Newfoundland. -
Sanitary and Storm Sewer Outfall Relocation
Harbour Grace -
Wharf Reconstruction, Harbour Grace, Newfoundland
Harbour Grace -
DFO-SCH Shoreline Restoration / Armourstone Installation, Harbour Grace, NL
Harbour Grace -
DFO-SCH Floating Dock Installation, Roberts Arm, NL
Roberts Arm -
Shoreline Protection, Flatrock, NL
The DFO-SCH project site is located in Flatrock, Newfoundland. -
Interior & Exterior Upgrades to Facility
Bell Island -
Marginal Wharf Reconstruction, Port de Grave, Newfoundland
Port de Grave -
Repair & Regrade including resurfacing parking lot.
Bay Roberts -
Wharf Reconstruction, St. Phillip's, Newfoundland
St. Phillip's -
Portugal Cove Light and Fog Signal Replacement
Portugal Cove -
Floating Dock Installation, Nippers Harbour, NL
The DFO-SCH project site is located in Nippers Harbour, Newfoundland. -
Material Lay-down Area
St. John's -
Robin Hood Bay Radar Communications Site
Sugar Loaf Road, Robin Hood Bay, St. John's, NL -
Newman Sound Day Use Area, HV cable replacement
Terra Nova National Park of Canada -
Perimeter Ditching and Site Drainage Improvements
East White Hills -
Sir Humphrey Gilbert Building Radar Communications Site
Sir Humphrey Gilbert Building -
Long Pond Development Project
Conception Bay South -
Steel Sheet Pile Wall Repairs St. John's Dockyard Limited
St. John's Harbour -
Wharf Replacement Pier 20 West and Pier 21
Pier 20/21 -
Fishway Reconstruction, Indian River, Springdale, NL
Indian River, Springdale, Newfoundland -
Sediment Removal Under Syncrolift 2023
St. John's Dockyard Limited (NEWDOCK) -
Canadian Coast Guard Demolition of Administration Building, Southside Road, St. John's, NL
Southside Road, St. John's, NL -
St. John's AAFC Research and Development Centre Waterline Upgrade Project
St. John's -
St. John's Building Retrofit Project
St. John's -
Installation of Septic Field
Cape Spear National Historic Site -
Main Electrical Feed Replacement
Cape Spear National Historic Site