Installation of Running Trail - Canadian Forces Base Shilo

The Department of National Defence (DND) has proposed a project which proposes the construction of a walking/running trail around the perimeter of the Base following the path of the existing perimeter security fence. This will be a gravel trail. The trail is to be located 25 cm inside of the security fence and will be approximate 3m wide. The running path will be built in several stages with the final length of the trail to match the length of the security fence at approximately 9 km in length. The first 2 phases are planned for 2022-2023 and include the sections from Horsham Road north to the railway and east to Engineer Road. Subsequent phases of construction have not been scheduled at this time and are subject to funding approvals.


Latest update

February  22, 2022— The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

.

Participate

Contacts

Robert Hutchings
Department of National Defence
Robert Hutchings, Civil Engineering Designer
PO Box 5000, Station Main
Shilo, Manitoba R0K 2A0
Email: robert.hutchings@forces.gc.ca


  • Location

    • Canadian Forces Base Shilo (Manitoba)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Completed
  • Start Date

    2021-11-24
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands