White Bear First Nation Community Spray Park
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
White Bear First Nations is looking to create a publicly accessible all-ages spray park as a social gathering place and foundation for a community area. The project features all-ages water play equipment and will be fully wheelchair accessible, ensuring high-level accessibility throughout the park. The project will also install a modern water recirculating system, which treats and reuses the water that will go through the park. This will minimize the water requirements to run the park, ensuring that it is both ecologically and fiscally responsible without any loss of functionality. The spray park will be installed in a central location within the community as part of a larger revitalization project which will include supporting sidewalks, green space, and gathering areas.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
This determination was based on a consideration of the following factors:
- impacts on rights of Indigenous peoples;
- Indigenous knowledge;
- community knowledge;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Infrastructure Canada is satisfied that the carrying out of the Project is not likely to cause significant adverse environmental effects.
Therefore, Infrastructure Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination - Infrastructure Canada | - | September 6, 2023 |
1 | White Bear First Nation Community Spray Park | - | June 23, 2023 |
Contacts
Infrastructure CanadaThomas Seeger, Environmental Officer
180 Kent Street
Suite 1100
Ottawa, Ontario K1P 0B6
Telephone: 343-550-1791
Email: thomas.seeger@infc.gc.ca
-
Location
- White Bear 70 (Saskatchewan)
-
Nature of Activity
- Recreation and Tourism
-
Assessment Status
Completed -
Start Date
2023-06-23 -
Proponent
White Bear First Nation -
Authorities
- Infrastructure Canada
-
Assessment Type
Project on federal lands -
Reference Number
85711
Nearby assessments
...within 200 kilometres-
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Enbridge Line 3 Replacement Program
Cromer -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
TransCanada Energy East Pipeline Project
Moosomin -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
North Portal Septic Tank Replacement
North Portal -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
Cowessess - Agricultural Permit Gordon D. Lerat
Cowessess Indian Reserve 73 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Birdtail Sioux Dakota Nation - Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Zagime Anishinabek School
Sakimay IR 74 -
Estevan Port of Entry Redevelopment
Estevan Port of Entry -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
WireIE (Canada) Inc. - Radiocommunication Tower - Torquay Border Crossing, Hwy 350, Torquay SK
Torquay Border Crossing -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Oungre Port of Entry Redevelopment
Oungre Port of Entry -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Zagime Community Center
Zagime IR #74-3 -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Tower Hill VHF Tower
Riding Mountain National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Awasis Solar Project
SE 7-17-18 W2 -
New (Multiple) Tower Construction
School Tower -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Notice of Determination -Start of Public Comment Period
Muscowpetung Saulteaux Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
WireIE (Canada) Inc. - Antenna Structure - Regway Border Crossing, Hwy 6, Regway SK
Regway Border Crossing -
Regway Port of Entry Redevelopment
Regway Port of Entry -
Enbridge Line 3 Replacement Program
Regina -
Smallmouth Bass Project
Riding Mountain National Park -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Tiger Salamander Crossing
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Runway De-Icing Liquid Storage Tank
Regina -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Runway 13-31 Rehabilitation
Regina -
New Fibre Installation
Riding Mountain National Park -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
Piapot Wind Farm Project
Piapot Indian Reserve 75 -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada