Redstreak Lagoon Decommission and Reclamation, Phase II, Kootenay National Park
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The objective of this project is to complete the second phase of the decommission and reclamation of the Redstreak wastewater lagoon. The first phase of the project was completed in the summer and fall of 2020 when a fence surrounding the lagoon and a large woody debris pile were removed. Furthermore, soil samples were collected and analyzed to confirm that the site is not contaminated and meets federal and provincial guidelines (BC OMRR, BC CSR, CCME).
The lagoon is adjacent to the Redstreak restoration area and is within a subunit called the provincial block, which was harvested and thinned in 2002. The Redstreak restoration area was created as a multi-year ecosystem-based management project where Parks Canada restored its historical fire regime and brought back native grasses to provide better grazing habitat by forest thinning and maintenance prescribed fire.
In 2021, Parks Canada is targeting to complete the full decommission and reclamation of the old wastewater lagoon site. The main objective of this project's second phase is to reduce the human footprint left on that site by removing any infrastructure that remains at the lagoon and prepare the site to start the natural revegetation phase of the reclamation.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | August 5, 2021 |
1 | New project being assessed by Parks Canada - Public comments invited from March 29 to April 28, 2021 | - | March 29, 2021 |
Contacts
Kootenay National ParkP.O. Box 220
Radium Hot Springs, British Columbia V0A 1M0
Email: noelle.summers@pc.gc.ca
-
Location
- Kootenay National Park (British Columbia)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2021-03-29 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81480
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Radium Hot Springs Aquacourt Foundation Stabilization, Phase 2
Kootenay National Park -
Biological Control at Dry Gulch
Kootenay National Park -
Highway 93 South Passing Lanes Kootenay National Park
Kootenay National Park -
Dry Gulch Forest Restoration, Kootenay National Park
Kootenay National Park -
Olive, Kaufmann, and Talc Lakes Aquatics Restoration
Kootenay National Park of Canada -
Crooks Meadows Stream Dredging
Kootenay National Park -
Bighorn Sheep Habitat restoration Project
Kootenay National Park -
Kootenay Crossing Warden Station Decommissioning
Kootenay National Park -
Kootenay Crossing Horse Facility Building Decommissioning and Site Rehabilitation
Kootenay/Yoho/Lake Louise National Parks of Canada -
Highway 93 South km 52.3 Bank Stabilization
Kootenay/Yoho/Banff National Parks of Canada -
Simpson River Pit Toilet Installation
Kootenay National Park of Canada -
Simpson 3 Avalanche Path Berm, Kootenay National Park
Kootenay National Park -
PCA Backcountry Shelter Redevelopment-Bryant and Egypt
Banff National Park -
Sunshine Village Ski Resort Angel Chairlift Replacement
Banff National Park of Canada -
PCA Backcountry Shelter Redevelopment-Bryant and Egypt
Banff National Park -
Sunshine Village Ski Resort Long Range Plan
Detailed Impact Assessment, Banff National Park -
Sunshine Village Ski Resort Ski Out Widening Tree Removal 2023
Banff National Park of Canada -
Sunshine Village Ski Resort Ski Out Widening Tree Removals
Banff National Park of Canada -
PCA Palliser Prescribe Burn
Banff National Park of Canada -
Sunshine Village West End Parking Reconfiguration
Banff National Park of Canada -
Sunshine Village Ski Resort Bourgeau Parking Lot Parkade
Banff National Park -
Sunshine Village Ski Area - Parking Lot Reconfiguration and Improvements
Banff National Park -
Highway 93S km 20 Bank Stabilization
Kootenay National Park -
Alpine Club of Canada (ACC) Shadow Lake Lodge Grey Water Pipe Replacement and Propane System Replacement
Banff National Park -
FortisAlberta Sunshine Cable Replacement - Phase 2
Banff National Park -
Kootenay National Park (KNP) Avalanche Mitigations, Whymper Remote Avalanche Control Systems (RACS)
Kootenay National Park -
Pursuit Night Rise Program
Banff National Park of Canada -
Banff Trail Riders-3 Mile BBQ Redevelopment
Banff National Park -
ToB 23DP65 7 Fairholme Place Deck Repair
Banff National Park of Canada -
Town of Banff Jasper Way to Cave Ave Commuter Trail
Banff National Park -
Town of Banff - Construction of Single Detached Home with Accessory Dwelling, 119 Spray Avenue
Banff National Park -
Parks Canada HWY 93S Boom Creek Culvert Replacement
Banff National Park -
Town of Banff 24DP09 Banff Trail Riders Barn Renovation
Banff National Park of Canada -
115 Spray Avenue Garage with Suite
Banff National Park -
Town of Banff Recreation Grounds Redevelopment and New Pedestrian Bridge
Banff National Park -
ATCO Town of Banff Compressed Natural Gas Connection
Banff National Park -
Town of Banff Bow River Bridge 2023 Rehabilitation Works
Banff National Park of Canada -
Town of Banff Bow River Sewer Siphon Liner Installation and In-Water Riffle Construction
Banff National Park -
Town of Banff Atco gas valve replacement
Banff National Park -
Yoho Administration Building Parking Lot Expansion
Yoho National Park -
Fortis Transformer Replacement
Banff National Park -
FortisAlberta 123 Banff Avenue Cable Installation
Banff National Park -
Town of Banff, New Family home construction, 129 Kootenay Ave
Banff National Park -
Town of Banff 135 Lynx Street New Accessory Dwelling
Banff National Park -
ToB 24DP 125 Banff Avenue Renovations
Banff National Park of Canada -
514 Buffalo Street, Crandell Peck Cabin Addition, Studio North
Banff National Park of Canada -
ToB 24DP05 Banff Centre Renovations
Banff National Park of Canada -
Shaw Cable Conduit Installation in Town of Banff
Banff National Park of Canada -
Town of Banff Bear Street Reconstruction
Banff National Park -
Bow Valley Credit Union- New Mixed Use Building Construction, 212 Banff Ave. Town of Banff
Banff National Park -
Town of Banff 24DP36 Installation of Outdoor Electrical Generator 301 Lynx St
Banff National Park of Canada -
Town of Banff 24DP18 302 Squirrel Street Petro Canada Renovation
Banff National Park -
Lodge at Bow Lake Redevelopment Master Plan
Banff National Park of Canada -
Town of Banff Bow River Bridge Old Pump Station Building Demolition
Banff National Park -
206 Otter Street Single Detached Dwelling Residential Addition
Banff National Park -
Town of Banff Atco gas valve replacements, Wolf Street
Banff National Park -
Town of Banff 311 and 317 Squirrel Street Redevelopment
Banff National Park -
19DP86 - 220 Otter Street Demo and New Building
Banff National Park -
Telus Roehampton CP Rail Yard Mobility
Banff National Park -
Shaw Cable Installation at 327 Railway Ave
Banff National Park -
ToB 23DP31 328 Muskrat Street Development
Banff National Park of Canada -
Banff Community High School Sidewalk Expansion
Banff National Park of Canada -
ToB 23DP45 Banff Community High School Exterior Renovations
Banff National Park of Canada -
Developing a backyard cabin into Bed and Breakfast
Banff National Park of Canada -
Town of Banff 347 Grizzly Street Edwina Handley & Kevan Colins New Garage and Accessory Dwelling
Banff National Park -
Banff Lodging Company-413 Beaver Street Redevelopment
Banff National Park -
High Country Inn Renovations and Landscaping - 419 Banff Avenue
Banff National Park of Canada -
Johnston Canyon Railing Extension
Banff National Park -
435 Squirrel Street CP Rail Transformer Installation
Banff National Park -
Town of Banff 425 Muskrat St New 8 Unit Residential Dwelling
Banff National Park -
Town of Banff 36 Unit Apartment, 418-420 Cougar Street
Banff National Park of Canada -
Town of Banff 435 Squirrel Street Shaw Cable
Banff National Park -
453 Marten Street - Best Western Plus Siding 29 Lodge Exterior Upgrades and Renovation
Banff National Park of Canada -
FortisAlberta System Improvement 407 Cougar St & Back Alley of 502 Banff Ave
Banff National Park of Canada -
Addition of three residential units to the existing apartment housing
Banff National Park of Canada -
ToB 24DP21 421 Cougar Place Redevelopment
Banff National Park of Canada -
Banff Rotary Club - Banff Rotary Park Redevelopment - 527 Banff Avenue
Banff National Park of Canada -
Town of Banff Marmot Crescent Dog Park
Banff National Park of Canada -
Otter Hotel Development (Inns of Banff)
Banff National Park of Canada -
Banff Legacy Trail Counter and Display
Banff National Park of Canada -
Town of Banff Mountain Avenue Transit Lane and Multi-Use Trail
Banff National Park of Canada -
ToB - Moose Street Sidewalk Upgrade
Banff National Park of Canada -
ATCO Gas Installation of 5 Cathode Test Stations in the Town of Banff
Banff National Park -
100 Falcon Street-New carpentry shop
Banff National Park -
Eagle Crescent Mountain View BBQ Housing
Banff National Park -
Town of Banff Chain Link Fencing 111 Hawk Ave
Banff National Park of Canada -
Fortis Alberta 610013030 Castle Junction 551L Rebuild
Banff National Park of Canada -
Town of Banff Affordable Housing Apartments, 338-342 Banff Avenue
Banff National Park -
PCA Castle Mountain Campground Utilities Upgrade
Banff National Park -
Tunnel Mountain Campground Winter Use
Banff National Park -
Town of Banff Water Withdrawal, Distribution and Treatment System
Banff National Park -
ToB 4 Kootenay Ridge House Development
Banff National Park -
Norquay Snowmaking Water Diversion Intake Maintenance
Banff National Park of Canada -
ToB 22DP57 216-218 Muskrat Street Redevelopment
Banff National Park of Canada -
ATCO Gas Cascade Mall Banff
Banff National Park -
Town of Banff 525 Buffalo Street Development
Banff National Park -
Mannix Pit Gravel Extraction, Processing and Reclamation 2022 to 2032
Banff National Park of Canada -
Town of Banff 217 Otter Street Redevelopment
Banff National Park of Canada -
Town of Banff 220 Otter Street-Duplex with Accessory Dwelling
Banff National Park of Canada -
Town of Banff 222 Otter Street Redevelopment
Banff National Park -
PCA Forty Mile Prescribe Fire
Banff National Park -
AltaLink 54L Transmission Rebuild
Banff National Park -
PCA Tunnel Mountain Toe Wildfire Risk Reduction
Banff National Park of Canada -
FortisAlberta Pole Replacement - Town of Banff (610013803)
Banff National Park -
Parks Canada National Fire Cache Facility Construction
Banff National Park of Canada -
Canalta 530 Banff Ave Redevelopment
Banff National Park -
Parks Canada Meadow Restoration Prescribe Fire Plan
Banff National Park -
Banff Air Strip Structure Removal
Banff National Park -
FortisAlberta Cascade 177S Substation Maintenance
Banff National Park -
ACC Castle Hut Replacement
Kootenay/Yoho/Banff National Parks of Canada -
Cascade Pit Gravel Crushing
Banff National Park -
Fairholme II Prescribed Fire
Banff National Park -
Westslope Cutthroat Trout Conservation Reintroduction to Cascade Creek
Banff National Park of Canada -
Protection Mountain Fire Guard
Banff National Park -
Moraine Lake Lodge Duplex Cabins
Banff National Park -
Fortis Line Install at CP Mile 108
Banff National Park -
Small-scale habitat enhancement for bears near Lake Louise, Alberta
Banff National Park -
Abbot Pass Refuge Cabin National Historic Site Removal
Yoko National Park, Detailed Impact Assessment -
ATCO Banff Transmission Line Repair Project
Stoney Nakoda Lands -
Badger Lake Non-Native Trout Removal
Banff National Park -
Lake Louise Drive Upgrades - Phase 2
Banff National Park of Canada -
Chateau Lake Louise Pool Rebuild
Banff National Park -
Louise Creek Bank Stabilization
Banff National Park of Canada -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park -
Bingay Main Coal Project
Elkford -
Deer Lodge Redevelopment
Banff National Park -
Fairmont Chateau Lake Louise Cooling Unit Installation
Banff National Park -
Fairmont Chateau Lake Louise Pool Demolition
Banff National Park -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
Chateau Lake Louise New Parking Lot Construction
Banff National Park of Canada -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Seebe, AB -
Mountaineer Lodge Staff Accommodation - 221 Hector Road
Banff National Park -
Moraine Lake Lodge Staff Accommodation
Banff National Park -
Village of Lake Louise Utilities Selected System Upgrades
Banff National Park -
Lake Louise Inn Generator and Exit Stairs
Banff National Park -
Wesley Band Goodstoney Meadows Development
Morley, AB -
Lake Louise Heliport
Kootenay/Yoho/Lake Louise National Parks -
Lake Louise Community Fire Guard
Banff National Park -
Mt. Stephen Trail Reroute
Yoho National Park of Canada -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 5 -
Wildfire Risk Reduction Maintenance Activities - Yoho, Kootenay, and Banff National Parks (2023-2034)
Yoho National Park of Canada -
Parks Canada Staff Accommodation 210 Stephen Avenue, Field, BC.
Yoho National Park of Canada -
Fortis Line Rebuild at Lake Louise Ski Area
Banff National Park -
Ross Lake Fire Guard
Yoho National Park of Canada -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Ozada, AB -
Stoney Nakoda Nation Broadband Tower installation - Tower 14 Project
Stoney Nakoda Nation -
Emerald Canoes Dock Replacement
Yoho National Park of Canada -
PCA Clearwater Prescribe Burn
Banff National Park of Canada -
Stoney North Morley Waterline Tie In Project
Stoney Nation -
Emerald Lake Lodge Water Permit
Yoho National Park of Canada -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Morley, AB -
Fording River Extension Project
Elkford -
Stoney Morley Rapid Housing Project
Morley -
Stoney Phase 17 Housing Project
Wesley First Nation -
Stoney Nakoda Tri Services Project
Stoney Nakoda Nation -
Wesley First Nation Solar Panels Project
Morley and Bighorn -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, 133X -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, 133X -
Stoney East & West Morley Waterline and Cistern Project
Stoney Nakoda Nation -
Stoney Phase 18 Housing Project
Wesley First Nation -
Stoney Nation Continuing Care Facility
Stoney Nakoda First Nation -
Chiniki First Nation - Rapid Housing 3
Chiniki First Nation -
Stoney North Morley Sanitary Servicing
Stoney First Nation -
Stoney Morley Aboriginal Head Start on Reserve Project
Stoney Morley -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley, Eagle Hill Rd -
Stoney Phase 18 Housing Project
Chiniki First Nation -
Margaret Creek Fish Barrier Creation
Banff National Park -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, Stoney 142 -
Tsuut'ina Nation Fire Smart Project
Tsuut'ina Nation -
Stoney Phase 18 Housing Project
Bearspaw First Nation -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 3 -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 4 -
Telus Communications Inc. New Tower Proposals on the Eden Valley No. 216 Reserve
Telus Communications Inc. New Tower Proposals on the Eden Valley No. 216 Reserve -
Xplore Inc. Radiocommunication New Tower Proposals on the Stoney No. 142-143-144 Reserve, Morley, AB 6318 Forestry Trunk Road
Morley, AB 6318 Forestry Trunk Road -
Tsuut'ina West End Rehabilitation Center
Tsuut'ina Nation -
Stoney Morley Broadband Tower Installation (Tower 12)
Stoney Nakoda Nation -
Stoney Nakoda Broadband Tower installation - Repeater Towers
Stoney Nakoda Nation -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Cochrane, AB -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 8 -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 5 -
Tsuut'ina Nation - Millburn Creek Culvert Replacement and Road Restoration Project
Tsuut'ina Nation -
West Path Delivery 2022 and 2023 Projects
Turner Valley -
Springbank Off-Stream Reservoir Project
15 kilometres west of Calgary -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Potential Regional Assessment in the Southwestern Alberta Foothills
Southwestern Alberta Foothills -
Hazard Spruce Tree Removal
Glacier National Park -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 6 -
JCLS Church Shaw Cable installation
Banff National Park -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 2 -
NGTL West Path Delivery 2023 Project
Bar U Ranch National Historic Site -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 1 -
Pekisko Creek Bank Armouring by NOVA Gas Transmission Ltd.
Bar U Ranch National Historic Site of Canada -
Pembina Pipeline Class Location Upgrade
Waterton Lakes National Park -
Sanitary sewer servicing for Bigham Crossing
Springbank Airport -
Ya Ha Tinda Ranch Solar Array
Banff National Park -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 4 -
Tsuut'ina Chief Big Belly Solar Project
Tsuut'ina Nation -
East Harmony Trail Extension
YBW Springbank Airport -
Crown Mountain Coking Coal Project
Sparwood -
Tsuut'ina Health Center and Healing Village
Tsuut'ina Nation -
Tsuut'ina Nation Master Services for Medical Center
Tsuut'ina Nation -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Tsuut'ina Nation Digital Sign Installation
Tsuut'ina Nation -
Tsuut'ina Nation The Shops at Buffalo Run
Tsuut'ina Nation -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 1 -
Self Storage Facility and Car Wash
Tsuut'ina Nation -
Tsuut'ina Nation Automotive Dealership Project
Tsuut'ina First Nation -
Tsuut'ina Nation Automotive Dealership Project
Tsuut'ina Nation -
Tsuut'ina Nation Automotive Dealership Project
Tsuut'ina Nation -
Tsuut'ina Gas Station Project
Taza Park East -
New (Multiple) Tower Construction, New Fibre Installation
Tsuut'ina Nation - Project Site 7 -
Taza Developments Eagle Landing Retail Project
Tsuut'ina Nation -
Coal Mountain Phase 2 Project
Sparwood -
Roof Upgrade at Calgary HQ Waters Building
Calgary -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Currie Building - Calgary -
Rooftop Solar Installation at Letter Carrier Depot (LCD) NW Calgary
40 Royal Vista Drive NW, Calgary, Alberta -
Recladding of The Military Museums - Calgary
The Military Museums - Calgary -
Michel Coal Project
Sparwood -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Roof Replacement - Mewata Armoury
Mewata Armoury, Calgary -
Potential Regional Assessment of Coal Development and Exploration Activity in Southwest Alberta
Southwest Alberta -
City of Calgary Green Line Maintenance and Storage Facility Project
Calgary -
Tent Mountain Mine Redevelopment Project
16km west of Coleman (Alberta) -
Yard Expansion - Canada Post Calgary Mail Processing Plant
1100 49th Avenue NE, Calgary -
Yard Expansion - Canada Post Calgary Mail Processing Plant
1351 Aviation Park NE, Calgary -
Yard Expansion - Canada Post Calgary Mail Processing Plant
589 Aviation Road NE, Calgary -
New rooftop radiocommunications antenna for Central Mountain Air at the Calgary International Airport
Calgary International Airport -
Foothills Zone 8 West Path Delivery 2023
Dominion Coal Block (Elko) -
Calgary International Airport West Runway Rehabilitation Project
Calgary -
AirSprint Apron Expansion
Calgary International Airport -
New rooftop radiocommunications antenna for Aero Mag 2000 at the Calgary International Airport
Calgary International Airport -
NBVL Volleydome
Calgary International Airport -
Grassy Mountain Coal Project
Southwest Alberta, approximately 7 kilometres north of Blairmore -
Parking Lot repave
301 3rd Street West, Revelstoke -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Lower Kootenay Band - Seven Nations Soaring Eagles Healing Centre
Seven Nations Soaring Eagles Healing Centre -
De Havilland Field Project
Cheadle -
Edson Mainline Expansion Project
Rocky Mountain House -
Electric Vehicle Charging Station Installation at Kingsgate Border Crossing
Kingsgate Border Crossing -
Tobacco Plains Road Rehabilitation
Tobacco Plains Indian Band IR#2 -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 2 -
Tobacco Plains Indian Band New Antenna Proposal for Existing Tower on the Tobacco Plains No. 2 Reserve
Tobacco Plains Indian Band New Antenna Proposal for Existing Tower on the Tobacco Plains No. 2 Reserve -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Pursuit - Columbia Icefield Adventure Tour Road Maintenance Program
Jasper National Park of Canada -
Clearwater Peat Harvesting Project
Caroline -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 3 -
Stoney Big Horn Fire Hall
Big Horn Reserve -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Edson Mainline Expansion Project
Rocky Mountain House