Wharf Reconstruction, Belleoram, Newfoundland
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
DFO, Small Craft Harbour intends to complete a wharf reconstruction project in Belleoram, Newfoundland. The proposed project includes the demolition and disposal of the existing timber pile wharf and the construction of a new treated timber pile wharf. The existing pile wharf is approximately 53.7m long and is constructed of creosoted timber pile and cap with reinforced concrete deck and untreated timber fenders and wales. All demolition debris (including creosote timber) will be disposed of at an approved waste site. The new timber pile wharf, complete with reinforced concrete deck and concrete pile caps will be approximately 54m with a further 24m dog-leg section. The wharf will be 7.3m wide. The new wharf will have mooring cleats, structural timber wheelguard, wheelguard blocking and bracing, and untreated hardwood fenders and ladders. The area of the new wharf footprint will be 570 m2 with the other dog-leg accounting for 175 m2 of new footprint. A new electrical system will replace the old system and be fed from a new electrical shed, which replaces the old one. The new electrical system will include the new electrical shed, pedestals, light poles, conduit, wiring and service panels. Two (2) existing floating docks which are attached to the head of the existing wharf will have to be relocated.
Latest update
Participate
Contacts
Fisheries and Oceans CanadaPaul Curran, Regional Engineer
10 Barters Hill
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-6660
Email: paul.curran@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Belleoram (Newfoundland and Labrador)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
Completed -
Start Date
2021-08-31 -
Proponent
Fisheries and Oceans Canada- Small Craft Harbours (DFO-SCH) -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
82952
Nearby assessments
...within 200 kilometres-
Parking Expansion, Wreck Cove, NL
The DFO-SCH project site is located in Wreck Cove, Newfoundland. -
Wharf Extensions, Pool's Cove, NL
The DFO-SCH project site is located in Pool's Cove, Newfoundland. -
Aid to Navigation Tower Refurbishments - Coast of Newfoundland
Coast -
Temporary Wharf Access, Harbour Brenton, NL
Harbour Brenton, Newfoundland -
Lauchway Reconstruction, St. Bernard's, NL
The DFO-SCH project site is located in St. Bernard's, Newfoundland. -
Floating Dock Installation, Hermitage, NL
The DFO-SCH project site is located in Hermitage, Newfoundland. -
Installation of an Outfall Pipeline, Mortier Bay, NL
Outfall Pipeline, Mortier Bay, NL -
Marystown RCMP Detachment Replacement Project
Marystown -
Marbase Lumpfish Hatchery - Saltwater Intake and Discharge Pipelines, Marystown, NL
Marystown -
Miawpukek First Nation Water Treatment Plant Expansion
Miawpukek First Nation -
Miawpukek First Nation Centre Culvert Replacement
Miawpukek First Nation -
MFN Emergency Services Building
Miawpukek -
Wharf Reconstruction (Phase II), Grand Bank, Newfoundland
Grand Bank -
Burin Search and Rescue Wharf Construction
Canadian Coast Guard Search and Rescue Station, Burin -
Wharf Demolition, Burin, NL
The DFO-RPSS project site is located in Burin, Newfoundland. -
Lauchway Reconstruction, Burin, NL
The DFO-SCH project site is located in Burin, Newfoundland. -
Wharf Reconstruction, Fortune, Newfoundland
Fortune -
Dredging, Lawn, NL
Lawn, Newfoundland -
Wharf Reconstruction, St. Lawrence, NL
The DFO-SCH project site is located in St. Lawrence, Newfoundland. -
St. Lawrence Fluorspar Marine Shipping Terminal Project
Mine Cove, Little Lawn Harbour -
Lord's Cove, NL, Fog Signal Site Upgrades
Lord's Cove -
Regional Assessment of Offshore Wind Development in Newfoundland and Labrador
Offshore Area -
Newman Sound Day Use Area, HV cable replacement
Terra Nova National Park of Canada -
Floating Dock Installation, Arnold's Cove, NL
Arnold's Cove, Newfoundland -
Boat Launch Reconstruction, Arnold's Cove, NL
The DFO-SCH project site is located in Arnold's Cove, Newfoundland. -
Finger Pier Reconstruction, Arnold's Cove, NL
Arnold's Cove -
Argentia Inspection Station - Roof Replacement
Argentia -
Cooper Cove Marine Terminal Expansion Project
Placentia Bay -
Wharf Reconstruction, Jerseyside, Newfoundland
Jerseyside -
Wharf Reconstruction at St. Bride's SCH, Newfoundland and Labrador
The St. Bride's SCH is located within St. Bride's, on the southwestern shore of the Avalon Peninsula, NL. -
Shoreline Protection, St. Bride's, NL
The DFO-SCH project site is located in St. Bride's, Newfoundland. -
North East Arm Camp Hazardous Material Removal and Demolition
The Northeast Arm River is a scheduled salmon river that supports a recreational salmon fishery. The proposed project location is in the North East Arm Camp, accessible via Highway 100 in Dunville, Newfoundland. -
Capital work at the Port Blandford Marina
Town of Port Blandford -
Dredging Branch, NL
Branch -
Water Withdrawal from Northwest River, Terra Nova National Park, for Golf Course Irrigation
Terra Nova National Park -
Marginal Wharf Construction, Little Heart's Ease, NL
Little Heart's Ease, Newfoundland -
DFO-SCH New Marginal Wharf and Floating Docks, Hickman's Harbour, NL
Hickmans Harbour -
Wharf Reconstruction - Gooseberry Cove, Newfoundland
Gooseberry Cove -
Floating Dock construction, Whiteway, NL
DFO SCH Site in Whiteway, NL (DFRP # 00158) -
Storm Damage Repairs, Ramea, NL
Ramea, Newfoundland -
Helicopter Pad Replacement, Northwest Head (Ramea), NL
The DFO-RPSS project site is located in Northwest Head (Ramea), Newfoundland. -
Entrance Washrooms Sanitary Rehabilitations
Terra Nova National Park -
Water and Sewer Utility Systems Recapitalization - Phase 2
Terra Nova National Park -
Fishway Refurbishment, Lower Terra Nova River, NL
The DFO-RPSS project site is located in Terra Nova, Newfoundland. -
Construction of a mountain bike skills trail in Newman Sound, Terra Nova National Park
Terra Nova National Park of Canada -
Wharf Construction, Riverhead, NL
Riverhead, Newfoundland -
Cambrai Rifle Range Repair – Canadian Forces Station St. John's
Canadian Forces Station St. John’s -
Vegetation Maintenance along the Bell Aliant Fibre Optic Line
Terra Nova National Park -
Routine Vegetation Maintenance at Terra Nova Golf Resort and Community
Terra Nova National Park -
Demolition of the Rappel Tower at Canadian Forces Base Beaumont Hamel Armoury, Grand Falls - Windsor, Newfoundland and Labrador
Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor -
Valentine Gold Project
Valentine Lake -
Building and Associated Infrastructure Demolition at Canadian Forces Base 9 Wing Gander Careless Cove Site, Newfoundland and Labrador
Canadian Forces Base 9 Wing Gander Careless Cove Site, along Gander Lake -
Warehouse Water and Sewer Servicing at Tilton Barrens, NL
The Tilton Barrens is a DFO property located at 899 Conception Bay Highway, Tilton, Newfoundland (NL). -
Repair, regrade and resurfacing parking lot - Bay Roberts Detachment
Bay Roberts -
Wharf Reconstruction, Winterton, Newfoundland
Winterton -
Utility pole installation along the Bell Aliant fibre optic line in Terra Nova National Park
Terra Nova National Park -
DFO-SCH Shoreline Restoration / Armourstone Installation, Harbour Grace, NL
Harbour Grace -
Marginal Wharf Reconstruction, Port de Grave, Newfoundland
Port de Grave -
Wharf Reconstruction, Harbour Grace, Newfoundland
Harbour Grace -
Sanitary and Storm Sewer Outfall Relocation
Harbour Grace -
Wharf Reconstruction, Carbonear, Newfoundland
Carbonear -
Gander Very High Frequency Omni-directional Range (VOR) Replacement
Gander -
Harbour Redevelopment at Ship Cove SCH, NL
Ship Cove SCH is located in Port de Grave, Newfoundland. Port de Grave is located along the shore of Conception Bay, in the Avalon Peninsula. -
Burgeo Wharf Reconstruction
The Canadian Coast Guard Lifeboat Station is located in the community of Burgeo, NL.The project site is accessible via Reach Road located off of Route 480. -
Burgeo Search and Rescue Floating Dock Construction
Burgeo, Newfoundland and Labrador -
Burgeo Search and Rescue Floating Dock Construction
Burgeo, Newfoundland and Labrador -
Water and Sewer Utilities System Recapitalisation - Phase 3
Terra Nova National Park -
Fishway Refurbishment, Middle Brook, NL
Middle Brook, Newfoundland -
VHF tower construction, Burgeo, Newfoundland Labrador
Burgeo -
Explosives Storage Area Fence Repairs at 9 Wing Gander, Canadian Forces Base Gander, Newfoundland and Labrador
9 Wing Gander -
Brush Cutting and Fence Line Repairs - Canadian Forces Base (CFB) Gander
Canadian Forces Base (CFB) Gander -
Relocate Sewage Lift Station at Hangar 1, Canadian Forces Base 9 Wing Gander, Newfoundland and Labrador
Hangar 1, Canadian Forces Base 9 Wing Gander -
Upgrade Building B160 for Occupancy - 9 Wing Gander
9 Wing Gander -
Accommodation for Wing Headquarters - 9 Wing Gander
9 Wing Gander -
Construct New Military Family Resource Centre - Canadian Forces Base (CFB) Gander
Canadian Forces Base (CFB) Gander -
Repair Cross Loop Access Road - Canadian Forces Station (CFS) Leitrim, Gander
Canadian Forces Station Leitrim, Gander -
Construction of New Building - Canadian Forces Base (CFB) Gander
Canadian Forces Base (CFB) Gander -
Demolition of Buildings 1-11 - 5th Canadian Ranger Patrol Group Site
5th Canadian Ranger Patrol Group Site -
Holyrood District Office & Detachment Re-grading and Re-surface of Parking Lot
36-40 Salmonier Line -
Chapel's Cove Breakwater Mitigation Project
Town of Harbour Main - Chapel's Cove-Lakeview -
Breakwater Construction, Summerville, N.L.
Summerville, NL -
Boat Launch Construction, Trepassey, NL
Trepassey, Newfoundland -
Wharf Reconstruction and Breakwater Extension, Ochre Pit Cove, NL
Ochre Pit Cove, Newfoundland -
Long Pond Development Project
Conception Bay South -
Interior & Exterior Upgrades to Facility
Bell Island -
Wharf Repairs, Portugal Cove South, NL
The DFO-SCH project site is located in Portugal Cove South, Newfoundland. -
Wharf Reconstruction, Phillip's Head, NL
Phillip's Head, Newfoundland -
Main Beach Armour Stone
Old Perlican -
Wharf Reconstruction, St. Phillip's, Newfoundland
St. Phillip's -
DFO-SCH Finger Pier Extension, Old Perlican, NL
Old Perlican -
Wharf Reconstruction, Old Perlican, NL
The DFO-SCH project site is located in Old Perlican, Newfoundland. -
Portugal Cove Light and Fog Signal Replacement
Portugal Cove -
Exterior Upgrades to Facility - Lewisporte Detachment
Lewisporte -
Outfall Pipeline Extension, Lewisporte, NL
Lewisporte -
Lease Renewal - Lewisporte Marina
Lewisporte -
Bristy Cove Bridge Rehab
The project is located at Bristy Cove River in the community of Trepassey along the road to Cape Race. -
St. John's Small Concrete Dam Removal Project
St. John's -
St. John's AAFC Research and Development Centre Waterline Upgrade Project
St. John's -
St. John's Building Retrofit Project
St. John's -
Bay de Verde SCH Southern Breakwater Extension
The Bay de Verde SCH is an incorporated town in Conception Bay on the northern tip of the Bay de Verde Peninsula of Newfoundland and Labrador. -
Wharf Construction, Bay de Verde, Newfoundland
Bay de Verde -
Government of Canada Building Construction in St. John's, NL
80 Kelsey Drive, St. John's, Newfoundland. -
Completion of Route 3
Mount Pearl