Burlington Lift Bridge - Storage Tank Upgrades

The storage tank system will be upgraded to bring it into compliance. Upgrades to include replacing main tank, repairing the concrete secondary containment, adding a second day tank, replacing the pump system, adding a manual shutoff valve to the supply line, installing redundant level-control system on both day tanks, replacing the suction piping of the transfer duplex pumps and provide effective corrosion protection on new piping, adding pressure relief piping from the duplex pumps to the main tank and installing a liquid tight 150 mm high sill around all the fuel installations in the service room.


Latest update

Notice of Determination

September 16, 2021 – The authority issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Public Notice - Burlington Lift Bridge - Storage Tank Upgrades - July 28, 2021

Contacts

Public Services and Procurement Canada
Joseph Nguyen, Environmental Specialist
4900 Yonge Street
Toronto, Ontario M2N 6A6
Telephone: 437-992-4353
Email: Joseph.Nguyen@pwgsc-tpsgc.gc.ca


  • Location

    • Burlington Lift Bridge 1157 Beach Boulevard Hamilton, Ontario (Ontario)
  • Nature of Activity

    • Building and Property Development
    • Oil and Gas
  • Assessment Status

    Completed
  • Start Date

    2021-07-28
  • Proponent

    Public Services and Procurement Canada
  • Authorities

    • Public Services and Procurement Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    82833