Trans Mountain Corporation Sleepy Hollow Line Replacement
This project will be assessed with a Basic Impact Assessment.
Trans Mountain plans to complete a pipe replacement on the inactive 24-inch Trans Mountain Pipeline along an approximately 1 km segment in Jasper National Park. The pipe replacement segment is located between Hazel Avenue and Connaught Drive, south of Sleepy Hollow Road (KP 377.695 to KP 378.9) near the Municipality of Jasper. The Project requires the installation of a heavier wall pipe to meet the higher-class location requirement for the new construction of Hostel International Jasper. Equipment will be utilized to conduct site preparation, pipeline excavation, coating, pipe handling, stringing, and welding of new pipe, support services, re-coating, dewatering, backfill, cleanup work and reclamation.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada - Public comments invited from September 24 to October 24, 2021 | - | September 24, 2021 |
List all records
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
In progress -
Start Date
2021-09-24 -
Proponent
Trans Mountain -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
83046
Nearby assessments
..within 200 kilometres-
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Robb Trend Coal Mine Expansion Project
Robb -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Ruddock Creek Mine Project
Avola -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Highway 947 Extension Project
-
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Hazard Spruce Tree Removal
Glacier National Park -
Harper Creek Mine Project
Vavenby -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Margaret Creek Fish Barrier Creation
Banff National Park -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Sunchild Gas Distribution Line
Sunchild -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park