RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser

A 15 m wide, 4,287 m long right of way easement will provide for the construction and operation of a pipeline riser and a pipeline that will transport natural gas. Construction of this infrastructure and reclamation of the right of way will be completed within the first year of the project. Following decommissioning of the pipeline, the right of way will be surrendered.

The proposed pipeline alignment will follow existing linear disturbances (seismic lines, roads, etc.) wherever possible. Horizontal directional drilling will be used for all small permanent and intermittent creeks as well as the semi-permanent wetland.

The project is located in Alexander First Nation. The proponent is Crescent Point Energy.

More


Latest update

March 16, 2023 – Indian Oil and Gas Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Contacts

Indian Oil and Gas Canada
Jilczy Nelson, Environmental Analyst
9911 Chiila Boulevard Suite 100 Tsuut'ina AB T3T 0E1
Calgary, Alberta T3T 0E1
Telephone: 403-292-5625
Email: jilczy.nelson@sac-isc.gc.ca


  • Location

    • Alexander First Nation (Alberta)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    Completed
  • Start Date

    2023-02-08
  • Proponent

    Crescent Point Energy
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    84313
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 