Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Trans Mountain Pipeline ULC plans to conduct depth of cover mitigations on the 24" pipeline within the Derr Creek watercourse crossing in Jasper National Park. Annual geohazard assessments identified inadequate cover of the existing pipeline and risk of bank scouring during high creek flow events. To complete the work, the watercourse will require isolation at the site location and flow diversion around the workspace in order to place materials required to meet the engineering hydraulic assessment for protection of the pipeline. The GAPS fibre optic line will be installed at the same time to reduce the need for additional instream work. Some riparian vegetation will require removal for access and bank repair. Reclamation of aquatic habitat and any upland staging areas will follow construction.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada - Public comments invited from March 3 to April 2, 2023 | - | March 3, 2023 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
In progress -
Start Date
2023-03-03 -
Proponent
Trans Mountain Pipeline ULC -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
84381
Nearby assessments
...within 200 kilometres-
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Pine Bungalows Master Plan 2021
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Trail 8c Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Jacques Lake Realignment
Jasper National Park of Canada -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Robb Trend Coal Mine Expansion Project
Robb -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Summit Mine 14 Project
Grande Cache -
Ruddock Creek Mine Project
Avola -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Big Horn Fire Hall
Big Horn Reserve -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Edson Mainline Expansion Project
Drayton Valley -
Harper Creek Mine Project
Vavenby -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Edson Mainline Expansion Project
Drayton Valley -
Highway 947 Extension Project
-
Hazard Spruce Tree Removal
Glacier National Park -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
AIB reservoir Construction
Ashcroft