Pelican Lake Timber Harvesting Plan 2021-22
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Pelican Lake First Nation has requested that a timber permit be issued for the 2021-2022 to Tolko Industries, who plan to harvest up to a total softwood volume of 40,445 m3, and a hardwood volume of 114,340 m3 from from cutblocks on Chitek Lake IR 191 and Chitek Lake IR 191A.
Latest update
February 08, 2021 - The assessment decision statement has been issued to the proponent.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for Pelican Lake Timber Harvesting Plan 2021-22 | - | February 1, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | December 22, 2020 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Chitek Lake IR 191 & 191A (Saskatchewan)
-
Nature of Activity
- Forestry
-
Assessment Status
Completed -
Start Date
2021-06-01 -
Proponent
Pelican Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81253
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Flying Dust Commercial Project
Meadow Lake -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Mistawasis Nêhiyawak Community Center
Mistawasis -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Beaver dam and lodge removal
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Outhouse relocation
Prince Albert National Park of Canada -
SaskPower Transformer Salvage
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Dore Lake Wharf Removal
Dore Lake -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
Crean Channel Modification
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Powwow Arbour Construction
Pierceland -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Frog Lake CFS Equine Centre
Frog Lake -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Regional Psychiatric Centre
Regional Psychiatric Centre -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation