New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
New (Multiple) Tower Construction:
Beardy's and Okemasis Cree Nation is proposing the construction of 2 telecommunication towers to provide high-speed internet access to the Beardy's and Okemasis Cree Nation. The towers will be 50 m tall. Antennas will be mounted at the top of these towers. These antennas will operate in the 5.8 and 3.65 GHz frequency bands. All of the equipment necessary to operate this facility will be housed in a small equipment cabinet located on site. These towers may undergo future modifications or the addition/replacement of antennas.
Upgrade (Single) Tower:
Beardy's and Okemasis Cree Nation is proposing the addition of 4 [52 x 65 x 11 cm] antennas, in the 5.8 GHz frequency band, mounted at the top of an existing 33 m tower which is located on Beardy's and Okemasis Cree Nation. The antennas will be installed to improve network access to high-speed internet. In the future, the existing tower may have other antennas and other radiocommunication equipment added or replaced.
New Fibre Installation:
Beardy's and Okemasis Cree Nation plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the Beardy's and Okemasis Cree Nation. The project involves the installation of approximately 9 km of underground fiber optic cable from the Shaw nearest splice point (Lat: 52°49'28.38"N Long: -106°11'43.19"W) to the Justice Building main hub site.
The cable is to be buried by directional drilling, trenching.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Determination - New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation (Beardy's and Okemasis Cree Nation) | - | May 4, 2022 |
Contacts
Innovation Science Economic DevelopmentAmy Wilmott, Program Officer
Telephone: 343-573-9897
Email: amy.wilmott@ised-isde.gc.ca
-
Location
- Point of presence (Saskatchewan)
- Tower 1 (Saskatchewan)
- Tower 2 (Saskatchewan)
- Tower 3 (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2021-12-02 -
Proponent
Beardy's and Okemasis Cree Nation -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
83222
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Beaver dam and lodge removal
Prince Albert National Park -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Regional Psychiatric Centre
Regional Psychiatric Centre -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
SaskPower Transformer Salvage
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Muskoday Convenience Store Remediation
Muskoday First Nation -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
Aspen Power Station Project
Lanigan -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Outhouse relocation
Prince Albert National Park of Canada -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Crean Channel Modification
Prince Albert National Park -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass New School
Sweetgrass IR 113 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Flying Dust Commercial Project
Meadow Lake -
Lake Diefenbaker Irrigation Expansion Projects
Lake Diefenbaker -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88