Cold Lake First Nation Water System Upgrades
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The proposed project includes the connection of the Cold Lake First Nation to the Cold Lake/Bonyville regional water system. The project includes connecting a supply main from the regional water system to the core area of the First Nation, and an expansion of the Cold Lake First Nation's distribution system to service rural residences within the First Nation lands with potable water. The proposed infrastructure includes construction of a new water booster pumphouse building complete with gravity sewer, natural gas backup generator, and natural gas unit heaters. It also includes the installation of approximately 3 km of treated water supply main, 28 km of distribution mains, and 20 km of service piping.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Cold Lake First Nation Water System Upgrades | - | May 26, 2020 |
1 | Public Comment Period on Intent to Make a Determination | - | April 18, 2020 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Cold Lake First Nation (Alberta)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2020-04-18 -
Proponent
BCL Engineering Ltd. -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80609
Nearby assessments
...within 200 kilometres-
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Ramp Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangar 6 and Construction of New Fighter Squadron Facility
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation Project)
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Powwow Arbour Construction
Pierceland -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WATERHEN I.R. 130 -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 3) -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161A -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 1) -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 2) -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
EAGLES LAKE I.R. 165C -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 1) -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 3) -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
LA PLONGE I.R. 192 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Dore Lake Wharf Removal
Dore Lake -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Lamont Railcar Storage Project
Northwest of Lamont -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Astotin Lake Dock Replacement
Elk Island National Park -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Ryley Facility Expansion Project
Ryley -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Ryley Biomedical Waste Incinerator Project
Ryley -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park