MLCN Montreal LK East Lagoon
Expansion of the existing East core sewage lagoon and decommissioning of the west core sewage lagoon. Existing 1.10ha primary lagoon cell being expanded with an additional 4.43ha primary lagoon cell. Existing 12,900 cu.m. primary lagoon cell being expanded with an additional 146,252 cu.m. lagoon storage cell. Approx. 5,750 lin.m. of new 150mm dia. DR17 sewage force main from SPS no.2 to the east lagoon. Approx. 500 lin.m. of new 200mm dia. PVC gravity sewer main from SPS no.1 to SPS no.2. The east lagoon expansion will consist of flagging of the existing forested area to indicate clearing extents, tree clearing within the extents marked by the Engineer, topsoil stripping, earthwork excavation/fill to construct the new lagoon cells, placement of 600mm thick compacted clay liner, topsoil replacement, seeding and erosion protection. New forcemain installation to convey sewage from the west core area to the east lagoon. Decommissioning of the existing west lagoon upon completion of the east lagoon expansion. Any construction waste generated from construction of the new lagoon, forcemain, sewage pumping stations will be transported to an off-site landfill by the Contractor.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
.
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for Montreal Lake East Lagoon | - | December 17, 2020 |
1 | Public Comment Period on Intent to Make a Determination | - | October 13, 2020 |
List all records
Contacts
ISC-SKENVIndigenous Services Canada
Hilary Hunter, A/ Sr. Environment Officer
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-780-5392
Email: aadnc.isc-skenv.aandc@canada.ca
-
Location
- Montreal Lake IR 106 (Saskatchewan)
-
Project Type
- Waste Management
-
Status
Completed -
Start Date
2021-05-02 -
Proponent
Montreal Lake Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81051
Nearby projects
..within 200 kilometres-
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Crean Channel Modification
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Montreal Lake Cree Nation Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Big River First Nation Arena Build Project
Big River IR 118 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Star-Orion South Diamond Project
Fort à la Corne Provincial Forest -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203