Big River First Nation Drainage Reestablishment Phase 1B

Big River First Nation is proposing to replace existing culvert crossings at eight locations in the community which are frequently subject to washouts and flooding. The work to be completed at each location will include upgrades to road structure, ditching, and drainage.

Site preparation activities will include clearing and grubbing of vegetation, and stripping of topsoil within roadway ditches and drainage channels. Construction activities will include installation/replacement of culverts, installation of rip rap, excavating/filling existing roadways and ditching to design elevations, application of aggregate and surfacing materials to the road surface, and application of topsoil and seeding to the ditching.


Latest update

May 28, 2026 – Indigenous Services Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
2 Notice of Determination - May 28, 2026
1 Notice of Intent to Make a Determination – Start of Public Comment Period - January 9, 2026

Contacts

ISC-SKENV
Indigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • BIG RIVER INDIAN RESERVE NO. 118 (Saskatchewan)
  • Nature of Activity

    • Highways and Roads
  • Assessment Status

    Completed
  • Start Date

    2026-01-09
  • Proponent

    Big River First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    90137

Nearby assessments

...within 200 kilometres