Mistawasis Nêhiyawak Community Center
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The project is the construction of a new community centre for the people of Mistawasis Nehiyawak, on the Mistawasis Indian Reserve No. 103. The ability to come together year-round in a cultural setting, is part of the healing process for Mistawasis membership. The new community centre will allow Elders, Chief, and Council, and others, to fulfil their traditional roles, something that is greatly inhibited at the present, especially for wakes. In addition to regaining the traditional ways and healing from past and present, the community centre will also be a platform for growth and evolution of Mistawasis where ideas about the future will be shared, voted on, and ratified by consensus and respectful discussion. There are few activities that any people undertake without the need for sheltered space, and Mistawasis is no different. This new building will be easy to spot for newcomers and the public visiting the Reserve for the first time, making it even more welcoming for those coming to enjoy the public programming Mistawasis intends to offer.
The new building will be located on farmland that is currently leased. The portion of land required for the new community centre will be designated for this use under the Mistawasis Land Code. Mistawasis is a signatory to the First Nation Land Management Act, with 'Operational' Status. Mistawasis has been self-governing under the FNLMA since 2017. The project will be the construction of a new community centre with an area of 1,480 m2, including gravel parking area and access road, and extension of the community's water, sewer, power, and gas infrastructure to support the new building. The farmland will only need to be graded to the extent required to ensure positive drainage away from and around the building. Excavation will be required for the crawlspace/basement underneath the building, and drilling of piles will be required.
The project will not require vegetation clearing or works in water. It will require grading and excavation as part of the construction. All project work is taking place on federally owned land within Mistawasis Indian Reserve No. 103
Latest update
July 24, 2023 - Infrastructure Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination - Mistawasis Nêhiyawak Community Centre | - | July 24, 2023 |
1 | Mistawasis Nêhiyawak Community Center | - | August 30, 2022 |
Contacts
Infrastructure CanadaMackenzie Dopping, Environmental Review Officer
180 Kent Street
Ottawa, Ontario K1P 0B6
Telephone: 343-576-3596
Email: Mackenzieryan.debertindopping@infc.gc.ca
Marika Haspeck, Environmental Review Officer
180 Kent Street
Ottawa, Ontario K1P 0B6
Telephone: 343-571-6569
Email: marika.haspeck@infc.gc.ca
-
Location
- Mistawasis (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2022-08-30 -
Proponent
Mistawasis Nêhiyawak -
Authorities
- Indigenous Services Canada
- Infrastructure Canada
-
Assessment Type
Project on federal lands -
Reference Number
83944
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Beaver dam and lodge removal
Prince Albert National Park -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Batoche Drainage Improvement
Grasslands National Park -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
SaskPower Transformer Salvage
Prince Albert National Park -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Outhouse relocation
Prince Albert National Park of Canada -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Regional Psychiatric Centre
Regional Psychiatric Centre -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Crean Channel Modification
Prince Albert National Park -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Sweetgrass New School
Sweetgrass IR 113 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Flying Dust Commercial Project
Meadow Lake -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Dakota Springs Spa
Whitecap IR #94 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Dore Lake Wharf Removal
Dore Lake -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Aspen Power Station Project
Lanigan -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42