Provide Power to Troop Shelters at Garrison Wainwright
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
This project involves the provision of power to the Troop Shelters at various locations within the Range and Training Area of Garrison Wainwright. Specifically:
· Gas Hut - trenching cable below-ground 42m in a new corridor (the original power was overhead)
· Range 1 - installing 3-phase power to intersection (underground) and single phase power to Range 1 troop shelter
· Range 3 - trenching 30m of cable underground
· Range 6 and 8 - extend overhead from Building 457; create new utility right-of-way to bring power to Range 6 and Range 8; tree removal is required
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Contacts
Project Manager, Real Property Operations Unit (West) Detachment WainwrightDepartment of National Defence
Caroline Paquin, Project Manager, Real Property Operations Unit (West) Detachment Wainwright
Real Property Operations Unit (West) Detachment Wainwright
Denwood, Alberta T0B 1B0
Telephone: 780-842-1363 ext. 1361
Email: caroline.paquin@forces.gc.ca
-
Location
- Garrison Wainwright (Denwood) (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2020-04-30 -
Proponent
Department of National Defence -
Authorities
- Department of National Defence
-
Assessment Type
Project on federal lands -
Reference Number
80636
Nearby assessments
...within 200 kilometres-
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
TransCanada Energy East Pipeline Project
Hardisty -
Enbridge Line 3 Replacement Program
Hardisty -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Ryley Facility Expansion Project
Ryley -
Ryley Biomedical Waste Incinerator Project
Ryley -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Little Pine First Nation Lagoon Upgrade
Little Pine IR No. 116 -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Kehewin Lift Station Project
Kehewin Cree Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Enbridge Line 3 Replacement Program
Kerrobert -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Astotin Lake Dock Replacement
Elk Island National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161A -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WATERHEN I.R. 130 -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Lamont Railcar Storage Project
Northwest of Lamont -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation Project)
Cold Lake First Nation -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 3) -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 2) -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Base Line Terminal Project
Edmonton -
Department of National Defence Future Fighter Capability Project - Demolition of Hangar 6 and Construction of New Fighter Squadron Facility
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Ramp Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Redwater Facility Rail Yard Project
Near Redwater -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
GroHERE at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Trans Mountain Expansion Project
Edmonton -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Powwow Arbour Construction
Pierceland -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation