Louis Bull Tribe - 2020 Septic System Improvements
The removal of old septic tanks, at about 19 properties on the Louis Bull Tribe reserve lands, to be replaced by new concrete tanks with working capacity of at least 5220 L (1150 Gal, acceptable for approximately 7 persons or 5 bedrooms).
Old shoot outs to be replaced by appropriately designed (by On-Site Sewerage Professional) dispersal field.
Miscellaneous piping connections as needed.
Amendment: A lined septic lagoon (20mx40m) will be installed at one location (53°00'22.2"N 113°55'24.2"W) instead of the previously planned septic dispersal field. The new lagoon will include installation of a synthetic liner, slotted underdrains and chainlink fence surrounding the lagoon.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Louis Bull Tribe - 2020 Septic System Improvements Project | - | January 4, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | December 3, 2020 |
List all records
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Louis Bull Tribe (Alberta)
-
Project Type
- Waste Management
-
Status
Completed -
Start Date
2020-12-03 -
Proponent
Louis Bull Tribe -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81197
Nearby projects
..within 200 kilometres-
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Genesee Generating Station Expansion Project
Near Warburg -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Base Line Terminal Project
Edmonton -
Trans Mountain Expansion Project
Edmonton -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Ryley Biomedical Waste Incinerator Project
Ryley -
Sundance 7 Generating Station Project
Wabamun -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Ryley Facility Expansion Project
Ryley -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Astotin Lake Dock Replacement
Elk Island National Park -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Xplornet Telecommunications Tower Project
Alberta Beach -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Redwater Facility Rail Yard Project
Near Redwater -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Lamont Railcar Storage Project
Northwest of Lamont -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Sunchild Gas Distribution Line
Sunchild -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Edson Mainline Expansion Project
Rocky Mountain House -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Edson Mainline Expansion Project
Drayton Valley -
Enbridge Line 3 Replacement Program
Hardisty -
TransCanada Energy East Pipeline Project
Hardisty -
Edson Mainline Expansion Project
Drayton Valley -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Ya Ha Tinda Ranch Solar Array
Banff National Park -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
New rooftop radiocommunications antenna for Aero Mag 2000 at the Calgary International Airport
Calgary International Airport -
JCLS Church Shaw Cable installation
Banff National Park -
New rooftop radiocommunications antenna for Central Mountain Air at the Calgary International Airport
Calgary International Airport