Cargo and Apron Development at Edmonton International Airport
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
New Project Being Assessed by Transport Canada – Public Comments Invited from June 17, 2021 to July 17, 2021
June 17, 2021 - A new project has been proposed and before proceeding, Transport Canada must decide whether the proposed project is likely to cause significant adverse environmental effects.
Please note that this project was previously assessed. See Reference 81501. https://www.iaac.gc.ca/050/evaluations/proj/81501
To help inform this decision, Transport Canada is issuing this notice of intent to make a determination and inviting comments from the public on the project's potential environmental effects. All comments received will be considered public. For more information on the public nature of your comments, individuals should consult the Privacy Notice on the Canadian Impact Assessment Registry website.
Written comments must be submitted by July 17, 2021 to the contact identified on the project's homepage on the Canadian Impact Assessment Registry website. Please include the project's Registry reference number in the subject line of your comments.
Edmonton Regional Airports Authority is proposing to expand cargo operations at EIA, bringing new job creation opportunities as well as critical transportation capacity for exports and imports to drive our region's recovery and growth.
This project will expand the cargo-area apron, allowing the airport to accommodate more cargo aircraft at one time for loading and unloading. EIA plans to install a modern hydrant fueling system in the apron, which will replace truck-based fueling to increase safety and reduce overall aircraft turnaround times. Additional cargo buildings will be developed to house cold storage facilities that will facilitate the movement of goods including the handling of critical temperature sensitive products. The project is located on 21st street and 35th avenue at EIA and encompasses lands referred to as Lot 52, Lot 53, and Lot 54.
The project is proposed to occur entirely on developed lands with existing utility connections to the leased lots. Paving activities on the existing airfield cargo-area apron and groundside development will expand by approximately 57,200 square meters. Cargo building development is designed to encompass up to 232,000 square feet. The described hydrant fueling system will connect the existing aviation fuel tanks to the apron through a new 1.5 km underground fueling line.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
July 21, 2021 – Transport Canada has determined that the proposed Cargo and Apron Development project is not likely to cause significant adverse environmental effects..
Participate
Contacts
Transport CanadaAdam Downing, Regional Senior Environmental Supervisor
Telephone: 204-771-0787
Email: adam.downing@tc.gc.ca
-
Location
- Edmonton International Airport (Alberta) (Alberta)
-
Nature of Activity
- Airport and Airfields
-
Assessment Status
Completed -
Start Date
2021-06-17 -
Proponent
Edmonton Regional Airports Authority -
Authorities
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
81714
Nearby assessments
...within 200 kilometres-
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
GroHERE at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Trans Mountain Expansion Project
Edmonton -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Base Line Terminal Project
Edmonton -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Alexander First Nation Campground Project
Alexander First Nation -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Genesee Generating Station Expansion Project
Near Warburg -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Alexander Wastewater Treatment Plant
Alexander First Nation -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Redwater Facility Rail Yard Project
Near Redwater -
Alexander First Nation: BF 77352 Replacement and Twp. Rd 562 Improvements
Alexander First Nation -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Astotin Lake Dock Replacement
Elk Island National Park -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Sundance 7 Generating Station Project
Wabamun -
Enbridge Northern Gateway Project
Bruderheim -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Xplornet Telecommunications Tower Project
Alberta Beach -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Lamont Railcar Storage Project
Northwest of Lamont -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Ryley Biomedical Waste Incinerator Project
Ryley -
Waheeba Solar Energy Project
Alexis First Nation -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Ryley Facility Expansion Project
Ryley -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
Sunchild Gas Distribution Line
Sunchild -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Clearwater Peat Harvesting Project
Caroline -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Rocky Mountain House -
TransCanada Energy East Pipeline Project
Hardisty -
Enbridge Line 3 Replacement Program
Hardisty -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Moraine Power Generation Project
Whitecourt -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation