Sawridge Band Solar Farm Project

Sawridge Band is proposing to construct and operate a new solar electrical generation facility with the maximum output capacity of 4.95 megawatts (MW) and up to 8.5 gigawatt hours (GWh) per year. The site is 10.1 ha with a target build-able area of the entire site. There will be approximately 18,000 solar panels arranged into approximately 25 arrays.  It is planned to be 99 inverters of 50 kW each and 3, 2 MVA transformers. The electricity generated from the facility will be input into the local electrical grid that is part of Alberta's Interconnected Electric System (AIES).


Latest update

August 31, 2022 – Indigenous Services Canada issued its notice of determination Notice of Determination for the Sawridge Band Solar Farm Project - Canada.ca (iaac-aeic.gc.ca) and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination for the Sawridge Band Solar Farm Project - August 31, 2022
1 Public Comment Period on Intent to Make a Determination - October 30, 2019

Contacts

Indigenous Services Canada
Stacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca


  • Location

    • Sawridge Band (Alberta)
  • Nature of Activity

    • Alternative Energy
  • Assessment Status

    Completed
  • Start Date

    2019-10-30
  • Proponent

    Sawridge Band
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80282