Sucker Creek Housing Project 2020 (4 Units)
Rural residential Housing. Supply and install 1400 sq ft prefabricated modular home with Poured concrete foundation piling system. Site servicing comprised of 1500 gal precast concrete water cistern, 2000 gal precast concrete sewage holding tank, 3 phase power, natural gas and driveway.
Rubber tired backhoe, Skidsteer, John Deere 200 Trackhoe, and D5 Cat Crawler Tractor to be used for excavation, driveway construction, backfill and landscaping.
Rural residential Housing. Supply and install 1220 sq ft stickbuilt bi-level house with ICF Poured concrete foundation walls. Site servicing comprised of 1500 gal precast concrete water cistern, 2000 gal precast concrete sewage holding tank, 3 phase power, natural gas and driveway.
Rubber tired backhoe, Skidsteer, John Deere 200 Trackhoe, and D5 Cat Crawler Tractor to be used for excavation, driveway construction, backfill and landscaping.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Sucker Creek Housing Project 2020 (4 Units) | - | December 11, 2020 |
1 | Public Comment Period on Intent to Make a Determination | - | October 26, 2020 |
List all records
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Sucker Creek First Nation (Alberta)
-
Project Type
- Building and Property Development
-
Status
Completed -
Start Date
2020-10-26 -
Proponent
Sucker Creek First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81100
Nearby projects
..within 200 kilometres-
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
Sawridge Band Solar Farm Project
Sawridge Band -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Highway 947 Extension Project
-
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Rycroft Alternative Water Hub Facility Project
Woking -
Wolverine River Lateral Loop (Carmon Creek Section)
Jackpine Lake -
North Corridor Expansion Project
Peerless Lake -
2017 NGTL System Expansion Project
Grande Prairie -
Prairie Lights Power Project
Greenview -
North Corridor Expansion Project
Highway 88 -
Amisk Hydroelectric Project
Peace River -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area