Brokenhead Ojibway Nation - Elder's Lodge - 2324
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
To create a 20-unit residence to somplement the existing seniors housing and fulfill the community's long desired wish for increased services for their elders.
Infrastructure: Graded lot, drainage, driveway and parking lot construction, overhead power lines, water service design, sewer service design.
Activities: Clearing and grubbing, environmental site assessment, lot grading and drainage, driveway and parking lot construction, lot development, geotechnical study.
Waster Generation: Solids - Any solid waste that cannot be reused will be removed to the community landfill or another licensed landfill as appropriate. Gaseous - During construction, the equipment will emit exhaust gases and particulate matter. Maintaining construction equipment to good working order and running equipment only when necessary to help minimize emissions. Hazardous Materials - Fuel and/or other substances that may be requeired on site during construction will be properly labelled and contained to avoid spillage or misuse. Spill kits will be kept on site durning construction. Liquid - Best management practices will be used during construction to prevent erosion and dedimentation in adjacent water bodies.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | January 24, 2024 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
-
Location
- Brokenhead Ojibway Nation - Elder's Lodge - 2324 (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2024-01-24 -
Proponent
Brokenhead Ojibway First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87253
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Vivian Sand Project
Springfield -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Energy East Project
Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water Wharf Construction
Hollow Water -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Women's Lodge & Cultural Safe Space
Kejick -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Trans-Canada Highway Twinning Project
Kenora -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Morden Pesticide and Chemical Building Project
Morden -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation