Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
The Northwest Angle 33 First Nation Angle Inlet community requires an upgrade to the Water
Treatment System. Two new surface water intake pipes will be installed approximately 219 m into Lake
of the Woods and a water reject pipe will be installed approximately 187 m into the lake. A new water
treatment plant and below ground reservoir will be constructed to service the community, and new
water service piping will be installed throughout the community. The treatment and distribution system
will be designed for fire flow capacity to design year 20, based on projected population growth. The
treatment system upgrade plan is attached.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet | - | December 19, 2019 |
1 | Public Comment Period on Intent to Make a Determination | PDF (418 KB) | September 18, 2019 |
List all records
Contacts
Indigenous Services CanadaAaron Pervais, Environmental Officer
100 Anemki Place, Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-624-5921
Fax: 807-623-3536
Email: aaron.pervais2@canada.ca
Indigenous Services Canada
Julieta Werner, Sr. Environment Officer
Ontario Region
100 Anemki Place, Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-355-1196
Email: julieta.werner@canada.ca
-
Location
- Northwest Angle #33 FN (Ontario)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2019-09-18 -
Proponent
Northwest Angle 33 First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80210
Nearby assessments
..within 200 kilometres-
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Wastewater Plant Replacement
Naotkamegwanning First Nation Reserve -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Rainy River Gold Project
Township of Chapple -
Caribou Street Culvert Replacement
Rainy River First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
Vivian Sand Processing Facility Project and Vivian Sand Extraction Project
Springfield -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Energy East Project
Winnipeg -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Goliath Gold Project
Dryden -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Enbridge Line 3 Replacement Program
Gretna -
Josephine Cone Mine Project
Ignace -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB