Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
In June of 2018, First Nations Technical Services Advisory Group (TSAG) completed a Disaster Recovery Road Project Inspection, following the state of emergency that was declared by the Nation due to poor road conditions. Spring melt and summer rainfall created impassable conditions from road overtopping. The roads affected by this event, primarily roads within Reserve 166A, composed the scope of the inspection that TSAG completed. Four (4) culvert locations remain to be addressed. A total of twelve (12) larger culverts are proposed within the four (4) crossing locations to increase flow capacity during flood events and are proposing to include mandatory improvements by raising the profile of the road from between 0.3m and 2m.
Latest update
October 15, 2021 – The public period on the project is closed. Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Comment Period on Intent to Make a Determination | - | September 14, 2021 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Bigstone Cree Nation (Alberta)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2021-09-14 -
Proponent
Urban Systems Ltd. -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
82993
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
Bigstone Cree Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
ATCO Gas and Pipelines Ltd.: 1088866 Bigstone Cree Nation & Hamlet of Sandy Lake Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
Sawridge Band Solar Farm Project
Sawridge Band -
New Fibre Installation - Slave Lake
Project Site 1: Slave Lake -
North Corridor Expansion Project
Peerless Lake -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
New Fibre Installation - Slave Lake
Project Site 2: Slave Lake -
Loon River First Nation: CU344 Main Access Road Upgrade Project
Loon River First Nation -
Loon River First: Nation Industrial Park Warehouse
Loon River First Nation -
Loon River First Nation North Central Corridor Loop Temporary Contractor Yard
Loon River First Nation -
Atikameg Healing Shelter for Women and Children
Whitefish Lake First Nation -
Loon River First Nation Wastewater Treatment Facility Upgrade and Expansion
Loon River First Nation -
Whitefish Lake Fire Guard Project
Whitefish Lake First Nation 155 -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Loon River First Nation: CU363 Emergency Wastewater System Repairs
Loon River First Nation -
Loon River First Nation: CU350 BF 78716 Bridge Replacement over Loon River
Loon River First Nation -
Loon River First Nation: Industrial Park Grocery Store
Loon River Cree Nation -
Loon River Cree Nation Pure Fibre Network Project
Loon River Cree Nation -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
New Fibre Installation
Swan River 150E -
Swan River First Nation: Wastewater Lagoon Liner Repair & Sub-liner Drainage Installation
Swan River First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
Swan River 32 Lot West Subdivision Project
Swan River First Nation -
Swan River First Nation Lakefront Development Project
Lesser Slave Lake -
North Corridor Expansion Project
Highway 88 -
Driftpile Cree Nation Lagoon Reclamation
Driftpile Cree Nation -
Driftpile Cree Nation antenna supporting structure located on the Driftpile Cree Nation in the Municipal District of Big Lakes.
Driftpile Cree Nation antenna supporting structure -
Driftpile Cree Nation Lift Station No. 1 Replacement Project
Driftpile Cree Nation -
Driftpile Cree Nation Housing Project
Driftpile Cree Nation -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
DCN 2023 Rapid Housing Project
DCN 2023 Rapid Housing Project -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Woodland Cree CMHC Co-Investment Housing Project - Marten Lake Subdivision (10-Units)
Cadotte Lake -
New Fibre Installation
Project Site 1: Little Buffalo -
Kapawe'no Adventure Trail Project
Kapawe'no Adventure Trail Project -
Upgrade (Multiple) Tower
Project Site 1: Kapawe'no FN 150B -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Three Unit Modular Housing Project
Sucker Creek First Nation -
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
2024-3899-00 Sucker Creek Bridge Assessment
Sucker Creek First Nation -
Upgrade (Multiple) Tower
Project Site 2: Sucker Creek FN 150A -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
New Fibre Installation
Project Site 2 - Heart Lake: -
OS-7244 Woodland Cree 226
Woodland Cree 226 -
OS-7239 Woodland Cree 226
OS-7239 -
Regional Assessment of Beaver Lake Cree Nation's Traditional Territory
Lac la Biche -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Woodland Cree 226
OS-7238 -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
OS-7245 Woodland Cree Reserve 226
Woodland Cree 226 -
Woodland Cree CMHC Co-Investment Housing Project - Simon Lake Subdivision (21-Units)
Woodland Cree First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake -
Black Bear Power Plant Project
Swan Hills