Clearwater Multi-User Access Project, Alberta
The Minister of the Environment has designated this project and the environmental assessment will continue under the former Canadian Environmental Assessment Act.
The proposed Clearwater Multi-User Access Project is a 30 km long, 40 m wide all-season access road in the Rural Municipality of Wood Buffalo, Alberta. The road will provide access from Highway 69 to an existing network of resource roads that connect to the east Athabasca Highway. The project requires bridge construction over the Clearwater River, along with 17 other crossings of various watercourses along the proposed route. The bridge over the Clearwater River will have three spans and two in-water piers. The approximate footprint of each pier is 13 m2. The piers will be constructed using work platforms on a temporary bridge.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
List all records
Contacts
Prairies and Northern Regional EA ContactTransport Canada
P.O. Box 8550
3-344 Edmonton Street
Winnipeg, Manitoba R3C 0P6
Telephone: 204-983-3533
Email: pnrea-rpnee@tc.gc.ca
-
Location
- Clearwater River (Alberta)
-
Project Type
- Highways and Roads
-
Status
Terminated -
Proponent
Ledcor CMI Ltd -
Authorities
- Transport Canada
-
Assessment Type
Screening-type assessment under CEAA 1992 -
Reference Number
59994
Nearby projects
..within 200 kilometres-
2017 NGTL System Expansion Project
Fort McMurray -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Jackpine Mine Expansion Project
Fort McKay -
Pierre River Mine Project
Fort McKay -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Frontier Oil Sands Mine Project
Fort McKay -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Rook 1 Project
Patterson Lake -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
North Corridor Expansion Project
Peerless Lake