Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation is proposing to replace a bridge over the Piche River on the Heart Lake First Nations Reserve No. 167. The Project is located within SW 01-070-11 W4M (approximately 15 km east of Highway 881 and 70 km northeast of Lac La Biche) and consists of Bridge File (BF) 80752 crossing the Piche River along an unnamed local road.
An assessment of BF 80752 indicated that the bridge is in poor condition and near the end of its useful life, and requires either rehabilitation or replacement (WSP 2014). As the bridge was constructed in 1975 and usage is anticipated to increase significantly in the near future, bridge replacement was deemed to be the more favourable option given the risks typically associated with rehabilitation work. The Project entails replacement of the BF 80752 bridge from its current configuration (three span 5.5 m – 5.5 m – 5.5 m treated timber stringers with treated timber substructures) to a more durable option approximately 16 m downstream of the current location.
The existing bridge is along the only access road in or out of the First Nation, representing an essential piece of infrastructure for the community.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
4 | Notice of Determination for the Heart Lake BF 80752 Bridge Replacement | - | December 30, 2020 |
3 | New Public Comment Period on Intent to Make a Determination | - | October 28, 2020 |
2 | Notice of Determination for the Heart Lake BF 80752 Bridge Replacement | - | September 24, 2020 |
1 | Public Comment Period on Intent to Make a Determination | - | August 14, 2020 |
List all records
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Heart Lake First Nation (Alberta)
-
Project Type
- Bridges
-
Status
Completed -
Start Date
2020-08-14 -
Proponent
Heart Lake First Nation -
Authorities
- Indigenous Services Canada
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
80936
Nearby projects
..within 200 kilometres-
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Department of National Defence Future Fighter Capability Project - Demolition of Hangar 6 and Construction of New Fighter Squadron Facility
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation Project)
Cold Lake First Nation -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Lamont Railcar Storage Project
Northwest of Lamont -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Astotin Lake Dock Replacement
Elk Island National Park -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Sawridge Band Solar Farm Project
Sawridge Band