4545 results

Project Coal water treatment plant upgrades - Neptune Terminal

  • Location (Coal water treatment plant upgrades - Neptune Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88523
  • Last Modified: 2024-04-26
  • Relevance: 799.97
  • The proposed project Neptune Bulk Terminals Ltd. (the Applicant) is proposing to upgrade the coal water treatment system located at their terminal. The system treats a mixture of stormwater runoff and any process water that contacts coal product from the coal handling parts only on the site. The new system will include coagulation, flocculation, clarification, and the use of a centrifuge for dewatering solids. The upgrades will meet existing quality and quantity objectives under the ...

Project YUL Montréal-Trudeau International Airport - Installation of a New Exterior Belt at Gate 48

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87398
  • Last Modified: 2024-04-26
  • Relevance: 799.96
  • The project consists of installing a new 30 m long exterior belt at gate 48. The baggage will be manually transferred to this belt and injected directly into sorter B. Modifications to the exterior belt with the addition of infrastructure are required to make operations safer, this includes: A new exterior belt with a lightweight shelter to protect luggage and the system from the elements with access to carry out interventions. A new conveyor system to direct baggage to sorter B. ...

Project Rebuilt of breakwater 302 at Étang-du-Nord harbour, Magdalen Islands

  • Location (Étant-du-Nord harbour, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86006
  • Last Modified: 2024-04-26
  • Relevance: 799.92
  • Due to the age of the structure, the nature of the stone used in its construction, and the increasing intensity and frequency of storms, breakwater #302 at the Étang-du-Nord fishing harbour needs to be rebuilt. The current state of the breakwater does not offer adequate protection, and overtopping can occur during strong winds. This can pose a risk to harbour users and cause damage to harbour infrastructure or ships moored at the quays. The breakwater will be rebuilt in the same ...

Project Crooked Lake Outlet Structure Replacement

  • Location (Crooked Lake - SW-08-19A-05 W2M, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86123
  • Last Modified: 2024-04-26
  • Relevance: 799.92
  • The Crooked Lake water control structure (existing facility) is located at the east end of Crooked Lake, approximately 135 km east of Regina, Saskatchewan, in Sunset Beach (an Organized Resort Hamlet) in the Rural Municipality of Grayson No. 184. The existing facility consists of a reinforced concrete outlet structure, stop logs, and earthen dyke at the east end of Crooked Lake. Prairie Farm Rehabilitation Administration (PFRA) constructed the existing facility in the 1940s and the structure ...

Project New Fibre Installation

  • Location (Project Site 1 - Heart Lake:, Alberta) (Project Site 2 - Heart Lake:, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88451
  • Last Modified: 2024-04-26
  • Relevance: 799.92
  • ATG Arrow Technology Groupe Limited Partnership plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the community of Heart Lake. The project involves the installation of approximately 13 km of underground fiber optic cable along local road in the community of Heart Lake. The cable is to be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments.

Project Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area

  • Location (Riding Mountain National Park of Canada, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88452
  • Last Modified: 2024-04-26
  • Relevance: 799.92
  • Westman Communications Group proposes to install 5, 147 m of fibre optic cable into the Clear Lake Cabin Area in Riding Mountain National Park. The purpose of the project is to provide high-speed internet and data services through the installation of fibre optic cabling to the Clear Lake Cabin Area by means of a conduit system. It is part of a federal initiative to provide improved rural internet service in southern Manitoba with fibre-optic cables capable of carrying high-speed internet ...

Project New Fibre Installation

  • Location (Project Site 1 - Bigstone Cree Nation:, Alberta) (Project Site 2 - Wabasca No. 166B :, Alberta) (Project Site 3 - Wabasca No. 166C:, Alberta) (Project Site 4 - Wabasca No. 166D:, Alberta) (Project Site 5 - Wabasca No. 166:, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88450
  • Last Modified: 2024-04-26
  • Relevance: 799.92
  • ATG Arrow Technology Group Limited Partnership plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the community of Wabasca No. 166, Wabasca No. 166B, Wabasca No. 166C  Wabasca No. 166D and Bigstone Cree Nation. The project involves the installation of approximately 109 km of underground fiber optic cable along local roads in the community of Wabasca No. 166, Wabasca No. 166B, Wabasca No. 166C  Wabasca No. 166D and Bigstone Cree Nation. ...

Project Aggregate Pit Tsideldel First Nation

  • Location (Redstone Flat 1, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88522
  • Last Modified: 2024-04-25
  • Relevance: 799.89
  • April 25, 2024 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project, Aggregate Pit Tsideldel First Nation, is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments until May 25, 2024 respecting that determination.

Project Harvesting of damaged timber by the 2023 forest fire on Quaaout 1

  • Location (Quaaout 1, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87174
  • Last Modified: 2024-04-25
  • Relevance: 799.89
  • Notice of intent to make a determination Harvesting of damaged  timber by the 2023 forest fire on Quaaout 1 – Public Comments Invited December 20, 2023 – Indigenous Services Canada must determine whether the proposed  harvesting of damaged timber by the 2023 forest fire on Quaaout 1 located in the vicinity of Tappen, BC is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments ...

Project La Plonge Solar and Battery Energy Storage System

  • Location (English River First Nation Reserve, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87438
  • Last Modified: 2024-04-25
  • Relevance: 799.89
  • Located on the English River First Nation's Reserve in northern Saskatchewan, the La Plonge Solar and Battery Energy Storage system project is a proposed 500 kW (AC) solar project with a 500 kW (AC) battery energy storage system. The project is connected to a rural distribution line, fed by a lower reliability transmission line from the main grid. The project is expected to reduce CO2 by an expected 250 tCO2e per year. In addition to generating renewable energy, reducing Saskatchewan's ...

Project Septic Tank Replacement at Pakenham ON Post Office

  • Location (155 MacFarlane St, Pakenham, ON, K0A2X0, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87323
  • Last Modified: 2024-04-25
  • Relevance: 799.88
  • Canada Post is proposing to replace the existing septic tank system at the Pakenham Post Office, located in Pakenham, Ontario.  Project works will include site preparation, excavation, decommissioning of existing septic tank and removal of all sewage waste, installation of new tank and field, and revegetation work, as required.

Project Demolition of Buildings 1-11 - 5th Canadian Ranger Patrol Group Site

  • Location (5th Canadian Ranger Patrol Group Site, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88519
  • Last Modified: 2024-04-25
  • Relevance: 799.87
  • The Department of National Defence (DND) has proposed to demolish infrastructure at the 5th Canadian Ranger Patrol Group (5 CRPG) site in support of site redevelopment. The project will include demolition of four existing duplexes (Buildings 1 – 11), rehabilitation of the existing area, and construction of a new parking lot complete with storm drainage, electrical light fixtures and potential electrical vehicle supply equipment stub outs. The estimated area of the site to be rehabilitated ...

Project Elsipogtog First Nation - Housing Recovery Phase 2

  • Location (Elsipogtog First Nation, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87420
  • Last Modified: 2024-04-25
  • Relevance: 799.87
  • The project aims to remediate damages to 16 homes and properties caused by Spring flooding in 2018. Construction activities include the demolition of approximately 1700m2 of homes and 2450m2 of rebuilt homes. Other construction activities include lot re-grading and engineering controls to encourage water drainage and prevent future damage to foundations from water saturation.

Project Culverts Replacement - Ottawa Laboratory (Fallowfield) - 3851 Fallowfield Rd, Ottawa, ON

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88505
  • Last Modified: 2024-04-25
  • Relevance: 799.86
  • The Canadian Food Inspection Agency (CFIA) wishes to replace two culverts located on the roads of its property at 3851 Fallowfield Rd, Ottawa (Ontario). The culverts have reached the end of their useful life, and must be replaced in order to maintain the access roads to the property's agricultural lots. The new culverts will have the same diameter as the old ones and are located on unnamed watercourses which are tributaries to Graham Creek.

Project Site Development - 1440 Columbia Street

  • Location (Site Development - 1440 Columbia Street, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88453
  • Last Modified: 2024-04-25
  • Relevance: 799.81
  • The proposed project The applicant proposed to undertake the completion of the site development and terminal expansion and all civil works associated with the civil upgrades to 1440 Columbia Street in North Vancouver. The works are to include the relocation of street turnarounds, street paving, sanitary main maintenance, and installation of a new lock block and oil/grit/water separators.   The proposed works include: Relocating the Columbia Street turnaround involving ...

Project Cap-Pelé DFO-SCH Containment Cell Construction

  • Location (The Cap-Pelé DFO-SCH is located on the Northumberland Strait in the town of Cap-Acadie, Westmorland County, New Brunswick., New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 86106
  • Last Modified: 2024-04-24
  • Relevance: 799.76
  • The project consists of construction of a new containment cell for dredge material, located in the southeast corner of the existing harbour basin adjacent to existing shoreline protection structure 602 and breakwater 301. The project will have a footprint below the high-water mark of approximately 1950 m2, including 1700 m2 of new permanent footprint.

Project Cap-Lumière DFO-SCH Containment Cell Construction

  • Location (The Cap-Lumière DFO-SCH is located on the Northumberland Strait in the parish of Richibucto, Kent County, New Brunswick., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88518
  • Last Modified: 2024-04-24
  • Relevance: 799.76
  • The proposed project at the Cap-Lumière SCH consists of the construction of a new containment cell for dredge material, located in the southwest corner of the SCH property, just outside the harbour basin and adjacent to the entrance channel. The project will have a total footprint of approximately 3480 m² including approximately 1840 m² of new rock berm.

Project Siksika Continuing Care Centre

  • Location (Siksika Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87428
  • Last Modified: 2024-04-24
  • Relevance: 799.76
  • Siksika Nation is planning to construct a Continuing Care Centre on LSD 12NW 6-22-22-W4M. It will involve the construction of the facility, infrastructure support, utilities, and water. The facility will include commercial laundry, common kitchen, tub room, family room, dining room, café, chapel, and multi-purpose room.

Project Loggiecroft DFO-SCH Shore Protection and Floating Dock Realignment

  • Location (The project is taking place at Loggiecroft Small Craft Harbour (Kouchibouguac Park), Kent County, New Brunswick., New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83961
  • Last Modified: 2024-04-24
  • Relevance: 799.75
  • The Loggiecroft DFO-SCH requires the installation of additional amour stone using the same footprint as the existing armour stone on site for continued safe harbour operations. New concrete anchor blocks will be installed to hold the three floating piers.    The proposed activities are expected to take place between November 01, 2022 and March 31, 2023. Project commencement is subject to DFO-SCH operational priorities and funding, as well as the receipt of other regulatory ...

Project Beaver First Nation Child & Family Services Prevention Building

  • Location (Beaver First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87401
  • Last Modified: 2024-04-24
  • Relevance: 799.75
  • Beaver First Nation plans to build a Child and Family Services building. A stand alone ±2,800m² building will be constructed for the FNCFS Program which oversees and provides contribution funding for the ongoing provision of culturally appropriate prevention, including early intervention and least intrusive measures, and legislated protection services in order to respond to child maltreatment, support family preservation and well-being, including cultural and linguistic connections ...

Project Port of Oshawa Maintenance Dredging

  • Location (Oshawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87414
  • Last Modified: 2024-04-24
  • Relevance: 799.74
  • HOPA is proposing to conduct regular maintenance dredging at the Port of Oshawa.  Sediment accumulates in the shipping channel due to littoral drift along the shore of Lake Ontario, as well as Oshawa Creek and Montgomery Creek that empty into the harbour.  Maintenance dredging is required to maintain the navigational channel design depths and reduce risk to marine navigation.  Sediment suitable for in-water placement will be relocated to a near-shore area east of the port to ...

Project Building Construction - 5th Canadian Division Support Base (CDSB) Gagetown

  • Location (5th Canadian Division Support Base (CDSB) Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 84542
  • Last Modified: 2024-04-24
  • Relevance: 799.74
  • The Department of National Defence (DND) is proposing a project which will involve the mobilization and demobilization of Project personnel, equipment, and materials and construction and reclamation of the temporary laydown area(s); construction of the Ground Based Optical (GBO) System and associated infrastructure, including access road and utilities; operation and regular maintenance of the GBO System throughout the Project life; and, accidents, malfunctions, and unplanned events throughout ...

Project Range and Training Area Maintenance (RTA)- 5th Canadian Division Support Base (CDSB) Gagetown

  • Location (5th Canadian Division Support Base, Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88517
  • Last Modified: 2024-04-24
  • Relevance: 799.74
  • The Department of National Defence (DND) is proposing to conduct maintenance at various locations within the Gagetown Range and Training Area (RTA) consisting of culvert, fording, and freshet maintenance. Maintenance activities may occur at existing watercourse crossings and roadways and will consist of replacing existing culverts, naturalizing the sites, freshet repairs along roadways (gravelling and ditching), cross culvert and fording areas. Culvert crossing repairs/maintenance are proposed ...

Project Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations

  • Location (Thunderchild First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88446
  • Last Modified: 2024-04-24
  • Relevance: 799.7
  • Thunderchild First Nation is proposed to operate a new lagoon as a two-cell facultative lagoon with a third separate cell to facilitate evaporation of the water treatment plant's concentrate stream (waste from the reverse osmosis system).  The WTP process waste will be isolated to its own cell but will have the ability to be mixed into the storage cell of the lagoon, if required to dilute any residual biological loading.  However, this is intended to be operated as an evaporative ...

Project Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades

  • Location (Grandmother's Bay 219, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87447
  • Last Modified: 2024-04-24
  • Relevance: 799.7
  • The Lac La Ronge Indian Band (LLRIB) is proposing to construct a new facultative lagoon, to complete upgrades at the existing Sewage Pumping Stations (SPS) No. 1, 2, 3, 4 and 5, and the construction of a new SPS No 7. The Grandmother's Bay Lagoon and SPS Upgrade project will include a new sewage force main from SPS No. 7 to the new lagoon, a new sewage force main from SPS No. 6 to SPS No. 7, the decommissioning of the existing lagoon, and an upgrade to sewage pumping stations (SPS) No. 1, ...

Project Garrison Grounds Parking Lot Expansion at the Halifax Citadel National Historic Site

  • Location (Halifax Citadel National Historic Site of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87446
  • Last Modified: 2024-04-24
  • Relevance: 799.7
  • In collaboration with the Province of Nova Scotia, the Garrison Grounds parking lot will be expanded with the purpose of increasing the parking capacity for hospital staff and visitors at the Halifax Citadel National Historic Site. The expansion would consist of 140 new parking stalls for a total of 247 parking stalls and a footprint of 8,200 m2. The work would involve the excavation and removal of existing asphalt, curbs, grass and soil. The existing paved area (4,400 m2) would be ...

Project Beaver Lake New School

  • Location (Beaver Lake Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88516
  • Last Modified: 2024-04-23
  • Relevance: 799.68
  • Beaver Lake Cree Nation intends to construct a new Indigenous education facility in Beaver Lake Cree Nation Band No. 460. This facility includes a new school, support to adult education programs, a dedicated elders and mentor space, and a comfortable resource area. The school will be 1,900 square meters and is in a central area to the community, located in proximity to administration, commercial, and residential developments.

Project VanPile maintenance dredging

  • Location (VanPile maintenance dredging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87402
  • Last Modified: 2024-04-23
  • Relevance: 799.68
  • The proposed project   Vancouver Pile Driving Ltd. (Vanpile) proposes to conduct maintenance dredging of up to a maximum of 8,000 cubic metres per year adjacent to the mouth of Lynn Creek in North Vancouver, BC. Previous maintenance dredging at this location was most recently conducted in 2023 under PER Permit 17-400. Recent maintenance dredging activities have been restricted to a maximum dredge volume of 4,000 cubic metres per year to align with Vanpile's annual multi-site ...

Project Southern Gulf Island Aids to Navigation Rebuild

  • Location (Mandarte Island, British Columbia) (Isabella Island, British Columbia) (Canoe Rock, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88515
  • Last Modified: 2024-04-23
  • Relevance: 799.68
  • A condition review of the navigational aids in the Southern Gulf Islands has found that many of the structures are in poor condition, non-compliant to Canadian Coast Guard directives for service, and/or non-compliant to current Canadian standards for safety to the workers who maintain them. The sites are all accessible by small vessel. The Canadian Coast Guard proposes to refurbish twenty one navigational aids in the Southern Gulf Islands. Of these twenty one aids 3 are located in the Gulf ...

Project VIA Rail Slope Stabilization - Old Sly's Lockstation, 2024-25

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88514
  • Last Modified: 2024-04-23
  • Relevance: 799.66
  • VIA Rail is intending to retain the services of a Contractor to complete improvements to the masonry abutments and approach embankments of VIA Rail's bridge at Mile 1.20 of the Brockville Subdivision. The existing bridge at Mile 1.20 of the Brockville Subdivision carries a single track over the Rideau Canal National Historic Site and is located immediately downstream of the entrance to Parks Canada's Lock 27 (Old Sly's Lockstation) in the Town of Smiths Falls. The purpose of this ...

Project Nipissing First Nation - Cultural Center Construction

  • Location (Nipissing First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88513
  • Last Modified: 2024-04-23
  • Relevance: 799.65
  • Nipissing First Nation is proposing this project to develop a new cultural center that will provide culturally relevant services for the community. Physical activities will include earth works pertaining to site preparation such as clearing of trees, grubbing, lot servicing and connections to water and sanitary services. The total footprint of the new facility will be approximately 3,600 m2. 

Project Aboveground Storage Tank Replacement - Churchill Airport

  • Location (Churchill Airport, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87404
  • Last Modified: 2024-04-23
  • Relevance: 799.64
  • Transport Canada proposes to replace and upgrade an aboveground storage tank (AST) at the Churchill Airport. The work comprises all activities associated with: decommissioning and removal of the existing AST (23,223 L) and dispensing system; supply and installation of a new split fuel AST (8,000 L Gas and 17,000 L Diesel) and dispensing system; and installation of a new product transfer area, including the disposal of non-impacted and petroleum hydrocarbon (PHC) impacted soil associated with ...

Project Lower Tank Farm Containment Berm Maintenance and Upgrade - Halifax Harbour Terminal

  • Location (Dartmouth, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85986
  • Last Modified: 2024-04-23
  • Relevance: 799.63
  • Irving Oil Limited is proposing the maintenance and upgrade of the Lower Tank Farm Containment Berm at its existing Halifax Harbour Terminal facility in Dartmouth, Nova Scotia. This work is intended to provide for further environmental protection by mitigating any risk of shoreline erosion in relation to weather patterns and wave events. This project is in line with Irving Oil's continuous work to protect the environment and to operate safely, sustainably, and responsibly. The main ...

Project Drummond Institution - CARGO 100 - ANTI-ICE / 11,000 L brine tank 345-91302

  • Location (Drummond Institution, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87354
  • Last Modified: 2024-04-23
  • Relevance: 799.63
  • The project consists of the installation of a rented 11,000 L tank containing Perfo Cycle brine (29.6% calcium chloride and addition of a food additive and a corrosion inhibitor). It will be installed on a flat asphalt surface, within the secure perimeter of the institution.

Project Cowansville Institution - CARGO 100 - ANTI-ICE / 11,000 L brine tank 350-91303

  • Location (Cowansville Institution, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87355
  • Last Modified: 2024-04-23
  • Relevance: 799.63
  • The project consists of the installation of a rented 11,000 L tank containing Perfo Cycle brine (29.6% calcium chloride and addition of a food additive and a corrosion inhibitor). It will be installed on a flat asphalt surface, within the secure perimeter of the institution.

Project Warehouse upgrades - Annacis Auto Terminal

  • Location (Warehouse upgrades - Annacis Auto Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88512
  • Last Modified: 2024-04-22
  • Relevance: 799.57
  • The proposed project   WWL Vehicle Services Canada Ltd. is proposing to replace the current asphalt floor in their warehouse located at the Annacis Auto Terminal. In addition, to bring the warehouse up to the current 2020 Building Code a new warehouse pallet racking system will be installed, and a new fire suppression system will be installed complete with a fire pump and backup generator. New lighting and electrical room upgrades will occur as well.   The project ...

Project Rosewall Creek Research Hatchery - Hatchery Retrofit - Circular Fiberglass Tub Farm Installation

  • Location (Rosewall Creek Hatchery, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88511
  • Last Modified: 2024-04-22
  • Relevance: 799.55
  • As part of the PSSI and associated Salmonid Enhancement Program (SEP) initiatives, the Rosewall Creek Research Hatchery (Rosewall Hatchery) was selected to receive funding to expand the aquaculture capacity on-site to meet specific conservation enhancement targets for salmonid populations. To facilitate the required program expansion, the overall rearing capacity of the hatchery must be expanded. This project will take part in two phases and is occurring within a previously developed area. ...

Project Okeover Inlet Wharf Reconstruction

  • Location (Okeover Inlet, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88510
  • Last Modified: 2024-04-22
  • Relevance: 799.55
  • Small Craft Harbours (SCH) is undertaking a project to reconstruct the timber wharf at Okeover Inlet Harbour.  The wharf allows user access to floats for vessel moorage and provides vehicle access for loading and offloading of aquaculture and fishing vessels.  The project also includes reconstruction of the floating plastic pipe breakwater that provides important shelter from northwest waves. The wharf has suffered degradation with age and is past its useful life.  The ...

Project Cando Sturgeon Rail Terminal West Expansion Project

  • Location (Sturgeon County, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 87381
  • Last Modified: 2024-04-22
  • Relevance: 799.54
  • Cando Rail and Terminals is proposing to expand the Cando Sturgeon Rail Terminal Project, an existing rail terminal facility located in Sturgeon County, about 23 kilometres northeast of Edmonton, Alberta. As proposed, the Cando Sturgeon Rail Terminal West Expansion Project would double the area of the current rail terminal by increasing the project footprint by about 130 hectares. The project would operate for at least 50 years and be a full-service and multi-purpose facility ...

Project Eskasoni 100mm Waterline Abandonment

  • Location (Eskasoni First Nation, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88508
  • Last Modified: 2024-04-22
  • Relevance: 799.54
  • The project will include the decommissioning and abandonment of a 100mm diameter cast iron watermain in Eskasoni, NS. Approximately 140 new water service lines will need to be installed to connect existing dwellings to an existing 200mm PVC watermain and disconnect them from the 100mm main. There will also be approximately one kilometer of new watermains installed. Site preparation activities include trenching, excavation, horizontal drilling, clearing, grubbing and site reinstatement. The ...

Project Upgrade Single Tower & New Fibre Installation

  • Location (Project Site 1: Alkali Lake 1, British Columbia) (Project Site 2: Nazco 20, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87437
  • Last Modified: 2024-04-22
  • Relevance: 799.53
  • Upgrade (Single) Tower TELUS Communications Company is proposing the addition of a 2-3 in meters height antenna, in the 850,1900, 700, 2100, 2600, 600, 2100 MHz frequency band, mounted at the top of an existing 35 in meters tower which is located on NAZCO 20. The antenna will be installed to improve network access to high-speed internet. In the future, the existing tower may have other antennas and other radiocommunication equipment added or replaced.   New Fibre ...

Project New Fibre Installation

  • Location (Project site 1: Regional Municipality of Wood Buffalo, Alberta) (Project site 2: Regional Municipality of Wood Buffalo, Alberta) (Project site 3: Regional Municipality of Wood Buffalo, Alberta) (Project site 4: Regional Municipality of Wood Buffalo, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87429
  • Last Modified: 2024-04-22
  • Relevance: 799.53
  • The project involves the installation of approximately 150 km of aerial fiber optic cable from the Fort McKay point of presence located at latitude 57.17935 and longitude-111.63689, the fibre will be deployed along the local roads of the Fort McKay First Nation. In addition, the fibre will be deployed along Highway 881 through Gregoire Lake 176A and 176. In Janvier, the fibre will be deployed from point of presence located at latitude 55.92592 and longitude -110.7304 throughout the ...

Project New Fibre Installation

  • Location (Project site 1: Thabacha Náre 196A & Thebathi 196, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87426
  • Last Modified: 2024-04-22
  • Relevance: 799.53
  • The Proposed Project Smith's Landing First Nation and Northwestel plan to install underground and aerial fiber optic cabling, for Internet purposes, to all residential homes in Smith's Landing First Nation (Thabacha Náre 196A) and Fitzgerald Settlement (Smith's Landing First Nation) (Thebathi 196). The project involves the installation of approximately 7.5 km of underground and/or aerial fiber optic cable along highway 48 starting from Pine Lake road, and along local roads ...

Project Upgrade (Multiple) Tower

  • Location (Project Site 1: Kapawe'no FN 150B, Alberta) (Project Site 2: Sucker Creek FN 150A, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87431
  • Last Modified: 2024-04-22
  • Relevance: 799.53
  • ATG Arrow Technology Group Limited Partnership is proposing the addition of antennas, in the 6GHz frequency band, mounted at the top of 2 existing 45 meters towers which are located on Kapawe'no First Nation 150B and Sucker Creek 150A. The antennas will be installed to improve network access to high-speed internet. In the future, the existing towers may have other antennas and other radiocommunication equipment added or replaced.

Project Septic (Holding Tank) Installation at Port Severn ON Post Office

  • Location (3280 Port Severn Road South, Port Severn, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87444
  • Last Modified: 2024-04-22
  • Relevance: 799.48
  • Canada Post is proposing to install a new septic system (holding tank) at the Port Severn Post Office, located in Port Severn, Ontario.  Project works will include site preparation, excavation, decommissioning of lines connected to the neighbour's septic tank, installation of new holding tank, repaving and revegetation work, as required.

Project Peterborough County - County Road 32, Hickey's Bridge Replacement

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87442
  • Last Modified: 2024-04-21
  • Relevance: 799.37
  • The County of Peterborough has proposed a complete replacement of Hickey's Bridge, a single span (9.1m) precast concrete slab structure with asphalt surface and rock timber crib abutments, located on County Road 32 (River Road). The existing structure is in fair condition with deterioration of ballast walls, concrete abutment slabs, and precast girder ends due to leaking expansion joints. The underside of the girders also exhibits isolated deterioration. The existing crib abutments show ...

Project Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building

  • Location (Big River First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85795
  • Last Modified: 2024-04-20
  • Relevance: 799.26
  • Mistahi Sipiy Child and Family Service and Big River First Nation prevention agencies are proposing to construct a new administration facility within the community of Big River First Nation. The proposed building will be approximately 2,500 m2. with a projected staff complement of over 50 people. The project will also include a garage facility to house the fleet vehicles and to store recreational program equipment and materials. Project site works will include clearing of vegetation and ...

Project St. Laurent Boulevard Pipeline Replacement Project

  • Location (Nicholson Building RCMP HQ, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88502
  • Last Modified: 2024-04-19
  • Relevance: 799.22
  • Enbridge Gas Inc. (Enbridge Gas) is proposing to replace its St. Laurent Pipeline System that is currently located along St. Laurent Boulevard in Ottawa, Ontario (the Project). The Project is located east of the Rideau River and south of the Ottawa River, generally in the neighbourhoods of Rockcliffe and Manor parks, Vanier, Overbrook, Forbes, Cummings, Cyrville, and Ottawa South. The Project will involve the installation of approximately 13 km of new 6-inch, 12-inch, and 16-inch diameter ...

Project Apeskomakon St. Phase 2 - Tobique First Nation

  • Location (Tobique First Nation, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88507
  • Last Modified: 2024-04-19
  • Relevance: 799.22
  • The development will include the construction of up to 23 housing lots, including the development of a new roadway (550m), underground piping (water and sanitary sewer), culverts and road ditching. Site preparation activities include clearing, grubbing and site grading. The total project footprint is approximately 4 hectares. 

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Authorities Display Filters

Date modified: