The Proposed Project
Smith's Landing First Nation and Northwestel plan to install underground and aerial fiber optic cabling, for Internet purposes, to all residential homes in Smith's Landing First Nation (Thabacha Náre 196A) and Fitzgerald Settlement (Smith's Landing First Nation) (Thebathi 196). The project involves the installation of approximately 7.5 km of underground and/or aerial fiber optic cable along highway 48 starting from Pine Lake road, and along local roads in Fitzgerald Settlement. Existing pole infrastructure will be used for aerial fibre placement where possible and otherwise the fiber will be buried using directional drilling, trenching, or using existing conduits as required.
Latest update
April 22, 2024 - Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- relevant potential environmental effects;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Innovation, Science and Economic Development Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | April 22, 2024 |
1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | March 19, 2024 |
Contacts
Innovation Science Economic Development CanadaJacinthe Moreau, Technical Officer, Connected Canada Branch
235 Queen Street
1st Floor West Tower, CD Howe Building
Ottawa, Ontario K1A 0H5
Email: Get-connected-brachez-vous@ised-isde.gc.ca
-
Location
- Project site 1: Thabacha Náre 196A & Thebathi 196 (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2024-03-19 -
Proponent
Smith's Landing First Nation -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
87426
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
Smith's Landing First Nation Phase 1A Housing Development (Part 2)
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Berry Plant Clearing in Pine Lake Campground, Wood Buffalo National Park
Wood Buffalo National Park -
Wood Buffalo National Park Highway Asphalt Surface Treatment
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Sandhills Substation Generator Upgrade
Wood Buffalo National Park of Canada -
Sass River / Prebble Creek Embankment Repair and Gabion Installation by the Government of the Northwest Territories
Wood Buffalo National Park of Canada -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201)