Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Wahnapitae First Nation is proposing to develop a new subdivision, the first part of this project will include site clearing and preparation of 20 new lots to be used for housing purposes. The project will include a geotechnical investigation and soil testing for each lot, and a legal survey. Following these activities each lot will be graded and drainage plans will be developed. An overhead hydro line will be extended for future service. A new access road will be constructed, the access road will be an extension of Makwazhaan Trail Road and will be a 2 lane road, with gravel surface, shoulders, ditches, culverts and driveways. Each lot will have a new water well installed. New septic systems will be designed and will be constructed at a later date. Aggregate will be imported and placed to accommodate new road base and topping. Houses will be built at a later date.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities | - | November 17, 2022 |
1 | Public Comment Period on Intent to Make a Determination | - | October 14, 2022 |
Contacts
Indigenous Services CanadaJulieta Werner, Sr. Environment Officer
Ontario Region
100 Anemki Place, Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-355-1196
Email: julieta.werner@canada.ca
-
Location
- Wahnapitae First Nation (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2022-10-14 -
Proponent
Wahnapitae First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84043
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Wahnapitae First Nation
Wahnapitae First Nation -
Atikameksheng Anishnawbek First Nation Business Park
Atikameksheng Anishnawbek First Nation -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Victoria Mine Project
Southwest of Sudbury -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
New Fibre Installation
Project site 12: WHITEFISH LAKE INDIAN RESERVE NO. 6 -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
VLA Water Plant Replacement
Nipissing -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Nipissing First Nation - Cultural Center Construction
Nipissing First Nation -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Dokis First Nation Water Treatment Plant
Dokis First Nation -
New Fibre Installation
Project site 04: WHITEFISH RIVER INDIAN RESERVE NO. 4 -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
Mnogin Constructed Wetland to Support Sustainable Water Treatment -
Portage Dam Concrete Storage Pad
Portage Dam -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
Latchford Dam - Public Safety Fencing
Latchford Dam -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
New Stoplog Lifter Latchford Dam
Latchford Dam -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
New Fibre Installation
NIPISSING INDIAN RESERVE NO. 10 -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Energy East Project
North Bay -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
Upgrade Underground Municipal Services - 22 Wing North Bay
22 Wing North Bay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Haileybury Bin Wall Repairs - Summer 2021
Haileybury -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
Côté Gold Mine Project
Gogama -
Sagamok Anishnawbek - Family Hub Complex Construction
Sagamok Anishnawbek -
Sagamok First Nation- Tree Clearing and School Construction Project
Sagamok New School -
New Fibre Installation
Project site 05: WIKWEMIKONG UNCEDED RESERVE -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
New Fibre Installation
Project site 18: Sucker Creek Indian Reserve No.23 -
Wikwemikong First Nation - Lot Servicing
Wikwemikong Unceded Territory -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
New Fibre Installation
Project site 17: Sheguandah Indian Reserve No.24 -
Timiskaming Drinking Water Treatment System Replacement Project
Timiskaming Dam -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
New Fibre Installation
Project site 11: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 06: WIKWEMIKONG UNCEDED RESERVE -
Widjikiwe Gas Bar
Timiskaming -
Development of four new streets in Kebaowek
Development of four new streets in Kebaowek -
Marina Construction Project
Kebaowek -
New Fibre Installation
Project site 10: WIKWEMIKONG UNCEDED RESERVE -
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Matachewan New Housing Construction Project
Matachewan First Nation -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Waste Transfer Station Construction
M'Chigeeng -
New Fibre Installation
Project site 13: SERPENT RIVER INDIAN RESERVE NO. 7 -
New Fibre Installation
Project site 20: M'chigeeng Indian Reserve No. 22 -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
New Fibre Installation
Project site 09: SERPENT RIVER INDIAN RESERVE NO. 7 -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
New Fibre Installation
Project site 03: MISSISSAGI RIVER INDIAN RESERVE NO. 8 -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
Upper Beaver Gold Project
19 kilometres (km) east of Kirkland Lake -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
Kipawa Rare Earths Project
Kipawa -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
Kimball Cottage Decommission
Bruce Peninsula National Park of Canada -
Davis Cabin Relocation
Bruce Peninsula National Park of Canada -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
Tobermory (Little Tub) Harbour - North and West Wall Rehabilitation
Tobermory -
Sheshegwaning Samson Edowishkosh Elementary School Construction
Sheshegwaning First Nation -
New Fibre Installation
Project site 16: Sheshegwaning Indian Reserve No.20 -
Zhiibaahaasing Water Storage and Distribution System Upgrades
Zhiibaahaasing Indian Reserve. No. 19 -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
New Fibre Installation
Project site 15: Zubaahaasing Indian Reserve No. 19A -
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
Gazoduq Project
Near Ramore -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park -
Century Gold Project
Timmins