Telecommunication Infrastructure Replacement - CFB Suffield
The Department of National Defence at Canadian Forces Base (CFB) Suffield is to execute a project to replace existing Telecommunications Infrastructure within the developed area of the Ammunition Compound in Summer 2020. The physical work encompasses replacement of existing buried communications cable with a maintenance hole system. The new infrastructure will consist of approximately 5,900 m of underground communications ducts (pathways) connected by 20 maintenance holes (MH's).
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
June 22, 2020— The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
List all records
Contacts
Mr. Daniel RuetchDepartment of National Defence
Daniel Ruetch, Senior Project Technologist (Electrical)
CFB Suffield
P.O. Box 6000, Station Main
Medicine Hat, Alberta T1A 8K8
Email: daniel.ruetch@forces.gc.ca
-
Location
- CFB Suffield (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2020-04-17 -
Proponent
Department of National Defence -
Authorities
- Department of National Defence
-
Assessment Type
Project on federal lands -
Reference Number
80606
Nearby assessments
..within 200 kilometres-
Install 25kV Electrical - Phase 9 at Canadian Forces Base Suffield
CFB Suffield -
Replace roof of Building 229 at CFB Suffield
CFB Suffield . The nearest major municipality is the City of Medicine Hat. -
EnCana Shallow Gas Infill Development Project in the Suffield National Wildlife Area
Suffield, Canadian Forces Base -
Replace roof of Building 1 at CFB Suffield
CFB Suffield, Medicine Hat -
Modernize Chemical and Biological Laboratories
Canadian Forces Base Suffield -
Methanex Medicine Hat Expansion Project
Medicine Hat -
Little Bow Reservoir Rehabilitation and Upgrading Project
Travers Reservoir -
Decommissioning of Tenaille Lake Water Infrastructure
Tenaille Lake -
Wildfire Risk Reduction at Fort Walsh National Historic Site
Fort Walsh National Historic Site -
Maple Creek Irrigation Project- Decommissioning of Dry Side
near Maple Creek -
Siksika Running Rabbit Culvert
Siksika Nation -
Onefour Removal of an Aboveground Storage Tank
Onefour -
Siksika Nation Cannabis Production Facility
Siksika Nation Cannabis Production Facility -
Coutts Point of Entry Roof Repairs
Coutts Port of Entry -
Blood Tribe Irrigation Infrastructure Expansion Project
Blood IR #148 -
Kainai Forage Processing Plant Storage Expansion Project
Blood #148 -
Kainai Forage Processing Plant Storage Expansion Project (Phase 2)
Blood #148 -
Blood Tribe Public Works Building
Blood Tribe -
Red Crow Community College New Campus
Standoff -
CCI Wireless o/a Corridor Communications Inc. - Antenna Structure - Del Bonita Border Crossing, Hwy 62, Del Bonita, AB
Del Bonita Boarder Crossing