Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Skip to Filters

1084 results

Project Nepean Point Redevelopment

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80522
  • Last Modified: 2020-10-20
  • Relevance: 10298.3
  • The National Capital Commission is leading the Nepean Point Redevelopment project, which is based on the winning design of an International Landscape Design Competition held in 2017 by the National Capital Commission.  Beginning with a June 2014 visioning and design workshop, and continuing into October 2017 with proposal presentations by the Design Competition finalists, stakeholder groups and members of the community have been able to help define key goals of the Redevelopment ...

Project Kemess Underground Project

  • Location (Smithers, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: Completed
  • Reference Number: 80063
  • Last Modified: 2020-10-20
  • Relevance: 10298.12
  • AuRico Metals Inc. proposes to construct and operate the Kemess Underground Project, an underground gold-copper mine located approximately 250 kilometres north of Smithers and 430 kilometres northwest of Prince George, British Columbia. As proposed, the project is anticipated to have an ore production capacity of approximately 24,650 tonnes per day (105,000 ounces of gold and 44 million pounds of copper per year) using underground block caving methods, over a predicted 13-year mine life.

Project Ecological restoration of Lac des Cinq: Dismantling of a former log driving structure and removal of logs

  • Location (La Mauricie National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80607
  • Last Modified: 2020-10-20
  • Relevance: 10298.09
  • To improve the ecological integrity of the area, LPNM created an aquatic ecosystem restoration program and implemented it in 2004. The current project focuses on Lac des Cinq, which is situated in the backcountry north of LPNM. Its aim is to restore the hydrological regime to near-natural conditions by removing all remnants of an old log driving structure located at the outlet of the lake. This will stimulate the development of the riparian ecosystem and uncover natural beaches that have long ...

Project Telus Communications Inc. Radiocommunication Antenna Addition on Sechelt Band Lands No 2 Reserve, Sechelt BC

  • Location (5411 Reservoir Road Sechelt BC, Sunshine Coast area on the Sechelt Band Lands No 2 Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81086
  • Last Modified: 2020-10-20
  • Relevance: 10297.9
  • TELUS Communications Inc. is proposing the installation of a new antenna on the existing tower structure, for a microwave radio communication link from Sechelt BC to Cawley Point BC in the Sunshine Coast area. The Sechelt system is located on the Sechelt Band Lands No 2 Reserve, and the installation will include a 1.8m diameter microwave antenna mounted at the top of an existing 36m radiocommunication antenna tower. This system will carry  high capacity Ethernet network traffic ...

Project Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild

  • Location (The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81085
  • Last Modified: 2020-10-19
  • Relevance: 10295.26
  • The Canadian Coast Guard identifies locations where aids to navigation (nav-aids) are required to be constructed or modified to better provide their service and to improve the safety to those who maintain them. The Project aligns with the CCG and Federal Infrastructure Initiative's goal of providing safe, economical, and efficient services for marine navigation and is critical for Canadian Coast Guard mandate of providing safe and accessible waterways. It has come to the Canadian Coast ...

Project Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation

  • Location (Sakimay IR 74, Shesheep IR 74A, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81083
  • Last Modified: 2020-10-19
  • Relevance: 10294.91
  • The project area is comprised of the Designated Cottage Area within Shesheep IR 74A and Sakimay IR 74. The area is not a new development, but the renewal of leases including an inventory of vacant lots on a previously developed cottage lot area. The scope of the project includes the continued construction (as applicable), operation and maintenance of a cottage and/or other dwellings (i.e. mobile home, camper trailer), on a cottage lot (residential/recreational lease) situated on ...

Project Construction of a private driveway off Notch Road

  • Location (Chelsea, Quebec, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 80532
  • Last Modified: 2020-10-19
  • Relevance: 10294.4
  • A private proponent is proposing the construction of a 38-metre-long stone dust driveway through federal lands owned by the National Capital Commission (lot 2735286) to create access to the proponent's private property (lot 2924022). The lot is located on Notch Road in Chelsea, Quebec. Due to wetlands located on the private property, the National Capital Commission lands present the only acceptable area to construct the driveway.   Once built, the driveway will serve as an ...

Project Mohawks of the Bay of Quinte Remedial Action Plan

  • Location (Parcel 1, Ontario) (Parcel 10) (Parcel 12) (Parcel 5A/C)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80243
  • Last Modified: 2020-10-19
  • Relevance: 10294.38
  • The Mohawks of the Bay of Quinte (MBQ) Remediation Project ("the Project") includes the remediation of four areas of known contamination within the MBQ community. The four areas include: Parcel 1, Parcel 5A/C, Parcel 10 and Parcel 12. The Project will be completed in two phases: Phase I: the design of a remedial action plan and tender package by Dillon Consulting, followed by Phase II: the remediation activities which will be completed by external Contractors with oversight from ...

Project Halifax Stanfield Runway 14-32 Terrain Removal

  • Location (Enfield, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80465
  • Last Modified: 2020-10-19
  • Relevance: 10294.35
  • At Halifax Stanfield International Airport, three areas of terrain near Runway 14-32 require modification to adjust grading and elevations.  The adjustment of the terrain will include removal and off-site disposal of approximately 8,000 m3 of pyritic slate bedrock, which underlies much of the airport property.  Off-site disposal will occur at an approved facility, following analytical testing of the material to confirm the absence of contaminants.  The areas will be reinstated ...

Project St. John's Building Retrofit Project

  • Location (St. John's, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81001
  • Last Modified: 2020-10-19
  • Relevance: 10294.26
  • Project Description: The St. John's Research and Development Centre building retrofit project consists of the demolition of buildings 38 (greenhouse and header house) and 39 (vehicle storage) along with the renovation and addition to building # 25 (Main Office/Lab complex). The renovation and addition includes hazardous material abatement, construction of a new building envelope, new mechanical and electrical systems. As part of the renovation project, a new greenhouse and header house ...

Project Summerland Irrigation Infrastructure Rehabilitation

  • Location (Summerland, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81002
  • Last Modified: 2020-10-19
  • Relevance: 10294.25
  • Project Description: The existing irrigation system at the Summerland Research and Development Centre is 70-100 years old. The current system has reached the end of its expected life cycle and is experiencing failures to isolation valves and pressure reducing valves, as well as having significant leaks in the system. A feasibility study was completed in spring of 2020 and recommended replacing the underground pipe network with new steel and PVC pipe networks and provide new pressure relief ...

Project Capital work at the Port Blandford Marina

  • Location (Town of Port Blandford, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80847
  • Last Modified: 2020-10-19
  • Relevance: 10293.99
  • The applicant proposes to carry out necessary capital work to the newly constructed marina facility to make it ready for the 2020 season and to establish a major tourism draw for the area.  These improvements to the new facility will provide necessary accessibility to all boaters, will add safety measures and will increase capacity for usage both by local residents and visitors to the area.  The proposed project will include installation of an accessibility dock and 8 ...

Project Webequie Supply Road Project

  • Location (McFaulds Lake area - Eastern limit, Ontario) (Webequie First Nation - Western limit)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80183
  • Last Modified: 2020-10-19
  • Relevance: 10293.8
  • Webequie First Nation is proposing the construction and operation, including maintenance, of a 107-kilometre all-season road connecting the Webequie Airport and the McFaulds Lake area in northern Ontario. The corridor would be approximately 35 metres in width in order to accommodate a two-lane gravel surface industrial supply road and could enable future infrastructure development such as transmission lines and broadband. As proposed, the Webequie Supply Road Project would connect Webequie ...

Project Marten Falls Community Access Road Project

  • Location (Marten Falls, Ontario) (Northern end of Painter Lake forestry road)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80184
  • Last Modified: 2020-10-19
  • Relevance: 10293.79
  • Marten Falls First Nation is proposing the construction and operation, including maintenance, of an all-season multi-use community access road approximately 190 to 230 kilometres in length, connecting the northern end of Painter Lake forestry road to the community of Marten Falls. Marten Falls is located at the junction of the Albany and Ogoki rivers, approximately 170 kilometres northeast of Nakina, Ontario. As proposed, the Marten Falls Community Access Road Project could ...

Project Junior Commissariat Officers' Quarters - Recapitalization Project

  • Location (Niagara National Historic Sites, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81003
  • Last Modified: 2020-10-18
  • Relevance: 10287.46
  • The recapitalization of the Junior Commissariat Officers' Quarters, a federally Recognized Heritage Building, is part of a series of Federal Infrastructure Initiative projects initiated in 2015 at Butler's Barracks National Historic Site. The Junior Commissariat Officers' Quarters is structurally unsound in certain areas, and renovations to the structure will be substantial including the replacement of the roofing system, stabilization and repointing of the chimneys, ...

Project Marathon Palladium Project

  • Location (Marathon, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 54755
  • Last Modified: 2020-10-16
  • Relevance: 10281.76
  • Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 km from Marathon, Ontario. The proposed project would include three to four open pits, an ore processing plant, tailings and mine rock storage facilities, site access roads, a transmission line, explosives factory and magazines, water management facilities, ancillary mine infrastructure and associated activities. The rate of production would be approximately 22,000 tonnes per day ...

Project Demolition of Office Building and Parking Canopies

  • Location (Demolition of Office Building and Parking Canopies, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81082
  • Last Modified: 2020-10-16
  • Relevance: 10281.64
  • The proposed project  RDM Enterprises Ltd. are proposing to demolish a two-storey 2,660 square foot (~250 square metres) office building and two parking canopies with footprints of approximately 16,150 square feet (~1500 square metres) and 8,600 square feet (~800 square metres) at their facility at 10897 Timberland Road in Surrey BC. The structures will be removed by way of contents removal, possible hazardous products and materials removal and subsequent mechanical demolition for ...

Project Frog Lake Waste Management Transfer Station

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81081
  • Last Modified: 2020-10-16
  • Relevance: 10281.56
  • A new waste management transfer station will be built to replace the existing facility at Frog Lake, Alberta.  The new facility will provide more effective management and separation of waste materials and improved safety and security.  In doing so they will reduce tipping fees and give the Frog Lake First Nation more control over the operations.  the project will include a 1.3ha site adjacent to the existing wastewater lagoons, an upgraded access road, a security fence and ...

Project Telus Roehampton CP Rail Yard Mobility

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81080
  • Last Modified: 2020-10-16
  • Relevance: 10280.72
  • Telus is proposing to connect fiber service to a mobility shelter on a CP Rail Yard, including replacing an existing pole and pedestal, connecting conduit to existing pedestals, and adding new 1-100mm HDPE conduit through directional drilling to tie into an existing line and pedestal in the Town of Banff near Mountain Goat Lane and Lynx Street

Project Remediation of a watercourse at Canadian Forces Base (CFB) Bagotville, Saguenay (Quebec)

  • Location (north-east of CFB Bagotville, on lot 5 828 910, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80588
  • Last Modified: 2020-10-15
  • Relevance: 10277.76
  • Department of National Defence (DND), is planning to carry out a remediation of a watercourse located within a contaminated site on CFB Bagotville property. Previous environmental studies have shown contamination of the sediment and of the surface water by various contaminants. The project will include excavation of the sediment, about 45 cm in depth, for a distance of 480 m. Contaminated soil will be disposed in accordance of the applicable regulations, in an authorized site for the ...

Project Underground Complex Substation Replacement, North Bay, ON

  • Location (Approximately 1.8 km south of 22 Wing's Main Base, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80853
  • Last Modified: 2020-10-15
  • Relevance: 10277.64
  • The Department of National Defence is replacing the existing Underground Complex's electrical substation at 22 Wing North Bay. The substation is located on Department of National Defence property south of Tower Drive and is the primary electrical service for the Underground Complex. The existing substation is required to be replaced as it suffered damage in 2019. The replacement system will involve disposal and replacement of existing transformers, grounding systems, switching, metering, ...

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80101
  • Last Modified: 2020-10-15
  • Relevance: 10277.54
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta. As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of clean coal per year, over a mine-life of about 25 years.

Project Star Blanket Water Treatment Plant Upgrades

  • Location (Star Blanket First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81079
  • Last Modified: 2020-10-15
  • Relevance: 10277.51
  • The Proposed Project Design and construct a new water treatment plant for Star Blanket First Nation to be located on S10 TP23 R11 W2M. The new plant will include concrete reservoir with a capacity of 420,000 liters, one new well with pump and raw water supply line, bio-filter pre-treatment, membrane final treatment and distribution pumping. The plant will provide 2.0 lps of treated water. The buiding size is approximately 500 m2. The new building is located just north west of the old water ...

Project MEDA 324 kW Solar Farm

  • Location (Muskoday IR 99, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80980
  • Last Modified: 2020-10-15
  • Relevance: 10276.96
  • Muskoday First Nation through Muskoday Economic Development Authority (MEDA) were successful in their submission of a 324 kW solar project through the SaskPower Power Generation Partner Program in November of 2018. Muskoday is working with MiEnergy who can assist with the engineering, procurement and construction of the 324 kW solar facility to be located on reserve land  to operate over a 20 year period, however the lifetime of the panels is estimated to be 25 years. The solar panels will ...

Project Kehewin Treatment Centre - 2020-3825

  • Location (Kehewin Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81036
  • Last Modified: 2020-10-15
  • Relevance: 10276.95
  • The Kehewin Treatment Centre will fill a need for shelter and access to social resources for the Kehewin Cree Nation. Proposed site: On reserve lands directly east beside the Kehewin Health Centre, near Eagles Landing Convenient Store along the north side of Highway 657. "Construction" includes placing 6 ATCO trailers from ATCO Structures on the empty grass lot (previously disturbed) within the core area of the community. The trailers will serve as a quarantine zone by providing ...

Project Dock Removal - Georgian Bay Islands National Park

  • Location (Georgian Bay Islands National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81075
  • Last Modified: 2020-10-15
  • Relevance: 10276.83
  • The crib structure for several of our docks has been severely damaged from high water and ice over the past two years. The locations of these docks are Honey Harbour, Tonch South and Tonch East and one dock in Frying Pan Bay. These docks are unusable and a safety concern. Removal of the dock and cribs will be done through contract using a barge with excavator. The complete structure will be removed including the wooden frame and large stones within the crib. New docks for these locations are in ...

Project Clairière de plantes baccifères au terrain de camping du lac Pine, parc national du Canada Wood Buffalo

  • Location (Wood Buffalo National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80846
  • Last Modified: 2020-10-15
  • Relevance: 10276.83
  • Berry bushes located within a distance of 50 m from campsites at Pine Lake campground will be considered for removal. This distance is consistent with backcountry camping safe practices to designate sleeping areas 50 m from food cooking and storage areas – Bears and People (Parks Canada 2015).

Project Golden Ears Forcemain (GDEFM) Project

  • Location (Golden Ears Forcemain Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80995
  • Last Modified: 2020-10-15
  • Relevance: 10274.77
  • The proposed project Metro Vancouver proposes to design, construct, and install twin sewer forcemains beneath the Fraser River to connect the new Golden Ears Pump Station, located north of the Fraser River, to the expanded Northwest Langley Wastewater Treatment Plant. This project is a component of a larger long-term servicing plan for Metro Vancouver to divert waste from Maple Ridge and Pitt Meadows to an upgraded Northwest Langley Wastewater Treatment Plant (NLWWTP) in the Township of ...

Project Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning

  • Location (Montreal Lake IR 106B, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81076
  • Last Modified: 2020-10-14
  • Relevance: 10273.53
  • Construction of the Solid Waste Transfer Station at S31-T52-R27-W3M and decommissioning of the existing disposal site. Approximately 500 lin.m. of perimeter chain link fence surrounding the site. New access roadways and 125m x 125m built up gravel pad serving as the transfer station area. Concrete retaining walls for ramp disposal area and separation of non-household waste materials. Used oil storage tank, used battery storage container and 30 cu.yd. waste bins will also remain on site ...

Project Municipal Water Infrastructure, City of Pickering Zone 4 and 5

  • Location (City of Pickering, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80594
  • Last Modified: 2020-10-14
  • Relevance: 10273.4
  • The Regional Municipality of Durham proposes to construct a potable water storage reservoir and pumping station to service Zone 4 and Zone 5 water pressure district in the City of Pickering.   This project comprises of the following components : • An underground reinforced concrete potable water reservoir to service Pressure Zone 4 within the City of Pickering. The reservoir will have a design capacity of 11,525 m3 (11.5 ML) with provision for future expansion. • A ...

Project Tunnel Repairs

  • Location (National Defence Medical Centre Dental Wing, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81066
  • Last Modified: 2020-10-14
  • Relevance: 10273.39
  • Repair of existing underground tunnel located in vicinity of National Defence Medical Centre Dental Wing and Central Heating Plant. Project scope is excavation and exposure of the tunnel structure, and resealing of the tunnel's expansion joints. Specific project activities will include excavating to expose the exterior walls of the existing concrete tunnel, repairing the joints, followed by returning the soil back into place with dressing. It is expected that this project will be ...

Project Docks, Hasting Village Marina North and South Side

  • Location (Hastings Village Marina, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80656
  • Last Modified: 2020-10-14
  • Relevance: 10273.39
  • The County of Northumberland and Municipality of Trent Hills propose the construction of two docks on the north and south shores of the Trent River at the Hastings Village Marina.   On the north shore: Construction of a dock approximately 90m long parallel to the existing stone retaining wall. Project provisionally includes up to seven floating "finger" docks 6.1m in length. The dock will consist of treated timber and/or composite PVC decking and steel.   On the south ...

Project Rideau Ferry Bridge Rehabilitation, County of Lanark

  • Location (County of Lanark, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81078
  • Last Modified: 2020-10-14
  • Relevance: 10273.37
  • The project involves rehabilitation of an existing bridge that crosses the Rideau Canal at the interface between Big Rideau Lake and Lower Rideau Lake. The proponent is the County of Lanark. The following is a synopsis of the proposed work:                In fall of 2021 work will be focused on the substructure, and includes re-facing the abutments (which are terrestrial) with new concrete, and replacing the bearings ...

Project Castle Project

  • Location (Elkford, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80702
  • Last Modified: 2020-10-14
  • Relevance: 10273.37
  • Teck Coal Limited is proposing to expand its existing Fording River Operations, a metallurgical coal mine located approximately 29 kilometres north of Elkford, British Columbia. As proposed, the Castle Project would include project-specific components such as an open pit, waste-rock storage areas, warehouses, maintenance and fueling facilities, access roads on Castle Mountain and linkages to Fording River Operations' power and utilities. The Castle Project would maintain the production ...

Project Marine Operations Facility

  • Location (Marine Operations Facility, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81077
  • Last Modified: 2020-10-14
  • Relevance: 10273.27
  • The proposed project  Saam Towage are proposing to construct a marine operations facility to support tug towage activity in and around the Vancouver Harbour. The proposed works include the installation of a single-storey wood-frame modular building with a footprint of approximately 2,650 square feet (~250 square metres) and a paved loading area for delivery trucks. The building will be ...

Project YUL Montréal-Trudeau International Airport - Replacement of an electrical service entrance to supply power to an existing building

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81074
  • Last Modified: 2020-10-14
  • Relevance: 10272.59
  • The project consists of replacing the electrical service entrance.  This work requires the addition of two new utility poles with overhead wiring including an underground portion from the last pole to the new transformer. The project has been approved by Hydro-Québec. In order to avoid power supply problems and possible breakdowns, it is hoped that the work will be completed before winter.

Project Shoreline Protection Repairs, Advocate Harbour Small Craft Harbour, Cumberland County, NS

  • Location (Advocate Harbour DFO-SCH (Harbour Code 1002) is located on Advocate Harbour which opens into Advocate Bay and the Minas Basin in Cumberland County, Nova Scotia., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80969
  • Last Modified: 2020-10-14
  • Relevance: 10272.53
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake a shoreline protection repair project at Advocate Harbour, located in Advocate Harnour in Cumberland County, Nova Scotia. The shoreline protection repair will consist of the use of heavy equipment such as excavators and haul trucks working from the shore. The proposed repair project includes the temporary removal of over 400 kg of existing stone (for reuse), the removal/disposal of unusable stone (and concrete ...

Project Proposed Dredge Material Management Site, Toney River, Pictou County, NS

  • Location (The Toney River property is located along the Sunrise Trail (Hwy 6) in Toney River, Pictou County, NS (PID #65210932)., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81062
  • Last Modified: 2020-10-14
  • Relevance: 10272.46
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake the development of a dredge material management site intended to be used to receive, store, and manage sediment material resulting from maintenance dredging activities conducted at Toney River Small Craft Harbour. Site works will involve the construction of an access road that will facilitate the transportation of dredge material from the harbour to the selected location within the proposed property that will ...

Project Demolition of the Rappel Tower at Canadian Forces Base Beaumont Hamel Armoury, Grand Falls - Windsor, Newfoundland and Labrador

  • Location (Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80991
  • Last Modified: 2020-10-14
  • Relevance: 10272.22
  • The Department of National Defence is proposing the demolition of the Rappel Tower located at the Canadian Forces Base Beaumont Hamel Armoury. The Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor, Newfoundland and Labrador at a Latitude 48°56'07.6"N and Longitude 55°39'37.7"W. The armoury site is used for army reserve and cadet training. The Rappel Tower is constructed of six pressure treated wooden poles and ...

Project Ogilvie Culvert Decommissioning

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80993
  • Last Modified: 2020-10-14
  • Relevance: 10270.64
  • The approximate 116-year old concrete culvert arch structure has not been used for process water discharge for many years. The concrete structure is reaching the end of its service life and should be decommissioning by permanently filling it in to ensure safety users of the culvert, CN and Neighbouring companies. The culvert is located at the rear east side of the ADM facility situated at 950 Mill Street, Montreal, Quebec and at the south-west corner of the Windmill-Point Basin.

Project Wheatley Harbour Maintenance Dredging - 2020-2021

  • Location (Wheatley Harbour, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80984
  • Last Modified: 2020-10-13
  • Relevance: 10269.36
  • Wheatley Harbour is located at the west end of Lake Erie, approximately 15 km east of Leamington, Ontario. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH). Active littoral transport occurs from the north-east to the south-west along the shoreline and has resulted in sedimentation against the east side of the east pier, within the lee of the detached breakwater, and within the harbour entrance ...

Project Fenceline Construction and Maintenance at Richmond Training Area

  • Location (Colonel Sherman Armoury and Richmond Training Area, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80820
  • Last Modified: 2020-10-13
  • Relevance: 10269.3
  • A fence is required around the perimeter of the Richmond training area. The proposed fence installation and maintenance will be a two-part project. For the fence line construction, a 4 metre swath of vegetation along the property line will be cleared. Low spots will be raised so that the fence is even height and in a straight line which increases its effectiveness at restricting access. Straining posts with concrete footings will be installed every 30 metres, or where there is a change in ...

Project 5th Canadian Division Support Base (CDSB) Gagetown Green Power Purchase Agreement (PPA)

  • Location (5th Canadian Division Support Base (CDSB) Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81073
  • Last Modified: 2020-10-13
  • Relevance: 10269.23
  • The Government of Canada is committed to using 100% clean electricity by 2022 where available, and through the Pan Canadian Framework on Clean Growth and Climate Change, will produce and purchase new renewable electricity that will displace production of the high carbon portion of the electricity grid. The Government of Canada is also targeting industry to reduce greenhouse gases (GHGs) and look to the electricity sector as a priority for this reduction. To respond to this goal, the Department ...

Project Reorganisation of the Grosse Île Harbour, Îles-de-la-Madeleine

  • Location (Grosse-Île, Îles-de-la-Madeleine, QC, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80826
  • Last Modified: 2020-10-13
  • Relevance: 10269.17
  • The harbour redevelopment project proposes to relocate a section of Breakwater 301 to allow for the installation of a portion of the existing and new floating pontoons, which will help relieve congestion in the fishing harbour. In addition to this work, wooden cribs (fixed docks 1 and 2) will be built to geometrically optimize the junction between the relocated breakwater, the boat launch and the existing wharf. Thus, the two existing lines of floating pontoons will be removed and the most ...

Project MLCN Montreal LK East Lagoon

  • Location (Montreal Lake IR 106, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81051
  • Last Modified: 2020-10-13
  • Relevance: 10269.14
  • Expansion of the existing East core sewage lagoon and decommissioning of the west core sewage lagoon. Existing 1.10ha primary lagoon cell being expanded with an additional 4.43ha primary lagoon cell. Existing 12,900 cu.m. primary lagoon cell being expanded with an additional 146,252 cu.m. lagoon storage cell. Approx. 5,750 lin.m. of new 150mm dia. DR17 sewage force main from SPS no.2 to the east lagoon. Approx. 500 lin.m. of new 200mm dia. PVC gravity sewer main from SPS no.1 to SPS no.2. The ...

Project GCT Deltaport Expansion - Berth Four Project

  • Location (Delta, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81010
  • Last Modified: 2020-10-13
  • Relevance: 10268.94
  • GCT Canada Limited Partnership is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia, approximately 35 kilometres south of Vancouver. As proposed, the GCT Deltaport Expansion - Berth Four Project would add a fourth berth on the east side of the Roberts Bank Causeway, include an expansion of the intermodal rail yard along the causeway (Roberts Bank Way) and dredging to provide safe access for ships. ...

Project Valentine Gold Project

  • Location (Valentine Lake, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80169
  • Last Modified: 2020-10-13
  • Relevance: 10268.91
  • Marathon Gold Corporation is proposing the construction, operation, decommissioning, and reclamation of an open-pit gold mine located at Valentine Lake, approximately 55 kilometres southwest of Millertown in Newfoundland and Labrador. As proposed, the Valentine Gold Project would include two open pits, disposal piles, crushing and stockpiling areas, site infrastructure, a tailings management facility, and mine site haul and access roads. Production capacity is estimated at 18,000 tonnes ...

Project Keltic Loop Road Rehabilitation - Cape Breton Highlands National Park

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80988
  • Last Modified: 2020-10-11
  • Relevance: 10258.55
  • The purpose of this project is to assess the condition of the existing roadways, as well as the related buried infrastructure and erosion issues. Following the assessment, a consultant will provide the best options for the redesign/rehabilitation of the roadway and buried infrastructure. Once the design has been developed, construction may take place in phases over the site's off-seasons. Keltic Road consists of a one directional looped road, providing access to the Keltic Lodge and ...

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: