Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

4435 results

Project Construction of 4 shades houses

  • Location (Nawa, Outside Canada) (Agneby-tiassa, Outside Canada) (Loh-djiboua, Outside Canada) (Haut -sassandra, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 88542
  • Last Modified: 2024-05-16
  • Relevance: 799.98
  • May 07, 2024 – Global Affairs Canada must determine whether the proposed construction of 4 shades houses, located in 4 regions in Ivory Coast is likely to cause significant adverse environmental effects. (N 05°40 .640', O 006°38 .530' ; N 06° 05 .878', O 004° 27 .151' ; N 05° 52 .995',O 005° 40 .949' ; N 06° 50 .595',O 006° 36 .043') To help inform this determination, Global Affairs Canada is inviting comments ...

Project Whitby Harbour Sediment Remediation, Whitby, Ontario

  • Location (Whitby Harbour, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87408
  • Last Modified: 2024-05-16
  • Relevance: 799.94
  • Fisheries and Oceans Canada (DFO)  proposes to undertake a sediment remediation project to address historic dioxin and furan contamination in Whitby Harbour, which is located on the northern shore of Lake Ontario, in the Town of Whitby, Ontario. The Whitby Harbour Sediment remediation Project includes the following activities: Establish a temporary storage area (TSA) equipped with a drainage culvert for dredge material. Construction of a transfer dock to facilitate the movement ...

Project Kinonjeoshtegon - CHRT 41 - CFS CENTER AND ASSOCIATED BUIDLINGS - P048401 - 2425

  • Location (Kitechuhmaykoosib Inninuwug First Nation, Ontario) (Kitechuhmaykoosib Inninuwug First Nation - Main site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88491
  • Last Modified: 2024-05-16
  • Relevance: 799.94
  • The proposed project is located in Kitechuhmaykoosib Inninuwug First Nation (KIFN), Ontario approximately 580 km north of Thunder Bay, Ontario. The Project includes two sites (Attachment 1: Figure 1) •Site #1 (the main site) is located at approximate UTM coordinates 16 U 307408 m E 5969562 m N within the main community on land parcel Part 1 Location CL 1715 of Kitchenuhmaykoosib Aaki No. 84 on Canada Land Survey Record 59544 and will be accessible by road year-round •Site #2 (the ...

Project ToB 24DP05 Banff Centre Renovations

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88492
  • Last Modified: 2024-05-16
  • Relevance: 799.94
  • The proponent is proposing interior and exterior renovations to two buildings at the Banff Centre for Arts and Creativity. The two buildings, Vinci and Farrally Hall, are at 100 and 104 St Julien Road. Both buildings will undergo various upgrades, such as new windows and doors, mechanical equipment, and walkways. The upgrades aim to improve the buildings' mechanical and electrical systems, life safety, accessibility, and interior finishes.

Project ToB 23DP65 7 Fairholme Place Deck Repair

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88494
  • Last Modified: 2024-05-16
  • Relevance: 799.94
  • The proponent is proposing to repair the existing deck at 7 Fairholme Place. Work will involve partially demolishing the existing deck and piles and installing the new deck and piles. The new deck will require four new piles and be approximately 9m2 larger than the existing one. No changes to utilities are anticipated. The project will take approximately four weeks to complete.

Project Sweetgrass First Nation Wastewater System Upgrades

  • Location (Sweetgrass First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88556
  • Last Modified: 2024-05-15
  • Relevance: 799.91
  • Sweetgrass First Nation is proposing a wastewater system upgrade project that entails capacity upgrades to the existing lagoon, construction of a new sewage pumping station, and installation of connecting underground sewage force main and sanitary mains. Upgrades completed through this project will provide the community with adequate wastewater infrastructure capacity to support the community's current and future needs. The lagoon expansion site is located immediately east of the ...

Project New Fibre Installation - Mississippi Lake

  • Location (Project site 1: Mississippi Lake, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88476
  • Last Modified: 2024-05-15
  • Relevance: 799.91
  • Bell Canada plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the region of Perth. The project involves the installation of approximately 0.6 km of underground and/or aerial fiber optic cable from the boundary of the Sanctuary along Concession Road 9A.   The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be suspended on ...

Project Telus Communications Inc., new radiocommunications tower (BC112098) on Babine No. 6, Fort Babine, BC.

  • Location (Telus Communications Inc-BC112098 on Babine No. 6, Fort Babine, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85663
  • Last Modified: 2024-05-15
  • Relevance: 799.91
  • Telus Communications Inc. is proposing to erect a new 63m self-support radiocommunications tower on Babine No. 6, Fort Babine, BC.  The purpose of the tower is to provide voice and data services to the area.  The tower will house several large (8 ft.) panel antennas and multiple dishes to support a variety of communication technologies in the PCS, BRS and Cell bands.  The tower may undergo periodic antenna additions, replacements, or other minor modifications.  

Project Zhiibaahaasing Water Storage and Distribution System Upgrades

  • Location (Zhiibaahaasing Indian Reserve. No. 19, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 82872
  • Last Modified: 2024-05-15
  • Relevance: 799.91
  • The project proposes the design and construction for a new water supply system in the community of the Zhiibaahaasing First Nation. The scope of the project includes: A new low lift station building with an extension of the existing intake to the new wet well. New low lift pumps with a connection to the existing raw water forcemain used for the new Emergency Water Treatment Plant. New water treatment plant with slow sand filtration (reusing the existing filter and two new filters), UV ...

Project FortisBC Eagle Mountain Barge Landing Improvements - Indian Arm

  • Location (FortisBC Eagle Mountain Barge Landing Improvements - Indian Arm, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87251
  • Last Modified: 2024-05-15
  • Relevance: 799.9
  • FortisBC Energy Inc. proposes to carry out improvements to an existing barge landing site at the head of Indian Arm of Burrard Inlet. The improvements are required so the site can be used to support project activities related to the proposed Eagle Mountain Woodfibre Gas Pipeline Project. The barge landing would be used for the delivery of materials, equipment, and personnel to the eastern portion of the pipeline route. The improvements would include expansion of a truck turn around area and ...

Project Development Work and Generator Installation - Pointe-à-Carcy Naval Complex

  • Location (Pointe-à-Carcy Naval Complex, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 86122
  • Last Modified: 2024-05-15
  • Relevance: 799.9
  • The Department of National Defence (DND) has proposed a project which consists of the installation of two emergency generators protected by a shelter. The fuel system will be under the shelter and will be connected to the generators. The capacity of the petroleum storage system must be sufficient to power the generators for at least 48 hours and will be more than 5,000 liters. The concrete paving will be removed to allow the passage of underground electrical conduits and then put back on ...

Project Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project

  • Location (Beardy's and Okemasis Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88472
  • Last Modified: 2024-05-15
  • Relevance: 799.9
  • Beardy's and Okemasis Cree Nation is proposing a Water Treatment Plant Upgrades Project.  The project includes construction of a new water treatment plant (WTP) building addition (with a floor area of approx. 350 sq.m), including an underground water storage reservoir (with a treated water volume of 735 cubic meters), a truck fill system with a heated concrete pad, loading dock, and the upgrade of the existing building. The WTP site work includes access roads and culvert ...

Project Removal of the Ville de Vanier wreckage from the Lac Leamy outlet in Gatineau, Quebec

  • Location (Lac Leamy landfill, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88552
  • Last Modified: 2024-05-15
  • Relevance: 799.9
  • The Canadian Coast Guard (CCG) wishes to remove the wreck of the schooner Ville de Vanier which is in the waters of the outlet arm of Lac Leamy, in Gatineau. This wreck was considered a vessel of potential concern in 2019, and was the subject of a technical assessment in 2020 which led to the decision to proceed with its removal from the waters. Indeed, it presents dangers for the safety, health, well-being of the public and the environment, and an advanced state of ...

Project Removal of the Ville de Vanier wreckage from the Lac Leamy outlet in Gatineau, Quebec

  • Location (Lake Leamy Outlet, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 84202
  • Last Modified: 2024-05-15
  • Relevance: 799.88
  • The Canadian Coast Guard (CCG) wishes to remove the wreck of the schooner Ville de Vanier which is in the waters of the outlet arm of Lac Leamy, in Gatineau. This wreck was considered a vessel of potential concern in 2019, and was the subject of a technical assessment in 2020 which led to the decision to proceed with its removal from the waters. Indeed, it presents dangers for the safety, health, well-being of the public and the environment, and an advanced state of degradation.

Project Northlands Enabling Works

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88486
  • Last Modified: 2024-05-15
  • Relevance: 799.83
  • The Vancouver Airport Authority is preparing for future development of the Northlands properties located at the Vancouver International Airport in Richmond, B.C. The project will involve relocating approximately 2.5km of the primary security fence on the north side of the airfield.  In addition to relocating security fence the project will include construction of a new 2.5 km gravel access road within the airfield parallel to the new fence alignment, excavation of a new drainage ditch and ...

Project Lower Similkameen Indian Band - Deflection Berms Project

  • Location (Lower Similkameen Indian Band - Deflection Berms Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88553
  • Last Modified: 2024-05-14
  • Relevance: 799.8
  • The Lower Similkameen Indian Band Band is proposing to build two deflection berms on the Similkameen Indian Reserve No. 2.   The project scope is to build two earthen berms (630m and 260m long) upslope of existing and planned development to deflect flood waters away from structures downslope. The proponent has applied for funding from Indigenous Services Canada's Community Infrastructure Program the construction of the proposed berms. The proponent has applied to Environment ...

Project Birch Narrows Dene Nation Community Centre

  • Location (Birch Narrows Dene Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88554
  • Last Modified: 2024-05-14
  • Relevance: 799.8
  • The project involves the construction of a new community center within the Birch Narrows Dene Nation, adjacent to the community arena and store. The community center will be a 3,070.8 square meter facility, with support buildings including three (3) mental health suites and a sweat lodge/land-based learning facility with an expected lifespan of 25+ years. The scope of work includes site preparation (clearing of trees and grading of the site to support adequate drainage), construction of ...

Project Big River First Nation Reserve Drainage Re-Establishment

  • Location (Big River First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88496
  • Last Modified: 2024-05-14
  • Relevance: 799.8
  • Big River First Nation is proposing a new clear span bridge over the Big River to replace the three existing 2.3 meter diameter culverts. The project will consist of removing existing culverts, excavating for a new channel bed to match existing upstream and downstream channel bed, installing 3:1 sloped embankments at the bridge armored with rip rap in and near the water to prevent erosion during high flows. Construction of the new bridge abutments and wing walls will occur at the top of the ...

Project Development of behind quay 108

  • Location (Sector of l'Anse au Foulon, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 86042
  • Last Modified: 2024-05-14
  • Relevance: 799.79
  • The Port of Quebec wants to develop the land behind quay 108 which will be dedicated to the storage of bulk and general merchandise. Port activities will be in continuity with what is already stored and transshipped on quays 101 to 107 in the Anse au Foulon sector. This project will resolve the problem of lack of space for the continuation of existing activities in the sector. It will also ensure the fluidity of traffic and access to platform 108, in particular by the addition of two new access ...

Project Reconfiguration of the Southwest Sector

  • Location (Saguenay Port, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87173
  • Last Modified: 2024-05-14
  • Relevance: 799.76
  • The project involves the development of a new paved outdoor storage area of 5200m2 total in the southwest sector of the Terminal from an existing area that had an area of 3000m2. The area will have to be excavated by blasting in order to increase the available area to 5200m2.  In addition to this work, lighting upgrades and the construction of a new drainage network in the area will be completed. The outdoor storage area will be specifically used for general cargo.

Project Morden Pesticide and Chemical Building Project

  • Location (Morden, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88479
  • Last Modified: 2024-05-14
  • Relevance: 799.72
  • Project Description: Agriculture and Agri-Food Canada (AAFC) intends to build two storage buildings to store laboratory chemicals (50 m2) and farm pesticides (201 m2) at the AAFC Morden Research and Development Center near Morden, Manitoba. The project also includes: 1. demolition of an existing old pesticide storage building (25 m2), 2. trenching for water, sewer, and electrical services from existing services, 3. constructing a 635 m2 parking lot and driveway, and 4. fencing a 2900 m2 area ...

Project Cheticamp River Restoration (2024): Long Pool & Robert's Brook Tributary

  • Location (Cape Breton Highlands National Park of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88551
  • Last Modified: 2024-05-13
  • Relevance: 799.69
  • This proposal seeks to remediate habitat degradation directly linked to human development at two locations on the Cheticamp River. At Long Pond, an important pool for Atlantic salmon, active erosion is threatening a 60m section that borders the Salmon Pool's Trail. Here, the overall objective aims to protect this important pool, while stabilizing the trail and maintaining visitor access to the upper river. Armor stone will be placed on the north embankment to protect against erosion. ...

Project Pheasant Rump Lagoon Expansion

  • Location (Pheasant Rump Nakota IR 68D, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88550
  • Last Modified: 2024-05-13
  • Relevance: 799.68
  • Pheasant Rump Nakota Nation is proposing a lagoon expansion project. These upgrades will provide adequate wastewater infrastructure capacity requirements to support the community's current and future needs. The lagoon expansion project will consist of a primary cell (0.28 ha treatment area) and an evaporation cell (17,176 sq.m. of evaporation area at full operating level). The existing access road will also be widened in one location to provide adequate space for a truck turn around area. ...

Project Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion

  • Location (Lac La Ronge Indian Band, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88549
  • Last Modified: 2024-05-13
  • Relevance: 799.68
  • The Lac La Ronge Indian Band is proposing a lagoon expansion project within the Lac La Ronge 156 Reserve. The existing two-cell facultative / exfiltration lagoon, located on provincial Crown land, provide wastewater treatment for the LLRIB reserves 156 and 156B and surrounding rural areas that utilize septic hauling. The lagoon is directly connected to the gravity sewer systems, pumping stations and force mains to provide wastewater service for Air Ronge and the LLRIB reserves 156 and 156B. The ...

Project Crown Mountain Coking Coal Project

  • Location (Sparwood, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80087
  • Last Modified: 2024-05-13
  • Relevance: 799.66
  • NWP Coal Canada Ltd. is proposing to construct and operate an open-pit metallurgical coal mine in the Elk Valley, approximately 12 kilometres from the District of Sparwood in southeastern British Columbia. As proposed, the production capacity of the project would be 3.7 million tonnes per year, over a mine-life of about 16 years.

Project Queensborough dike shoreline protection rehabilitation

  • Location (Queensborough dike shoreline protection rehabilitation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88484
  • Last Modified: 2024-05-13
  • Relevance: 799.61
  • The City of New Westminster is proposing to rehabilitate and stabilize a failing segment of existing rip-rap shoreline protection, approximately 130 metres in length, along the Queensborough Dike. The Project would consist of: Site preparation, including removal of vegetation, anthropogenic debris, existing rip rap and profile and grading the slope   Placement of geotextile, filter rock, rip rap and fill, if required Vegetation planting on the rip rap bench and ...

Project Construction of new dykes and water gates in Indonesia

  • Location (North Kalimantan, Indonesia, Outside Canada) (East Kalimantan, Indonesia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 88480
  • Last Modified: 2024-05-12
  • Relevance: 799.5
  • This initiative, funded by Global Affairs Canada, aims to strengthen Indonesia's climate mitigation and adaptation efforts, and improve the sustainability of coastal livelihoods, by supporting the restoration and protection of mangrove ecosystems in North and East Kalimantan, Indonesia. Project activities include: (1) restoring degraded mangrove ecosystems and protecting intact mangroves; (2) building policymakers' capacity to better incentivize mangroves' restoration and ...

Project McArthurGlen Designer Outlet Expansion Phase 3

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88548
  • Last Modified: 2024-05-10
  • Relevance: 799.36
  • Templeton DOC Limited Partnership is proposing to expand the McArthurGlen Designer Outlet Vancouver Airport located at the Vancouver International Airport in Richmond, B.C. The expansion consists of approximately 6,130 square meters of new commercial retail buildings. Construction activities for the Phase 3 project will include some excavation of existing gravel base material, construction of new foundations, utilities and building structures. The operation of the expanded facility will be ...

Project Micro Modular Reactor Project

  • Location (Chalk River, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80182
  • Last Modified: 2024-05-10
  • Relevance: 799.36
  • Global First Power is proposing the site preparation, construction, operation, and decommissioning of a Micro Modular Reactor nuclear plant at the Chalk River Laboratories site, in Renfrew County, Ontario, approximately 200 km northwest of Ottawa. The project would provide process heat to an adjacent plant via molten salt, and produce approximately 15 Megawatts (thermal) of process heat to generate electrical power and/or heat, over an operating life-span of 20 years. The project requires an ...

Project Grassy Narrows Long-term Care and Treatment Facility Construction

  • Location (Grassy Narrows Long-term Care and Treatment Facility Construction, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88547
  • Last Modified: 2024-05-10
  • Relevance: 799.35
  • Asubpeeschoseewagong Netum Anishinabek (ANA) or Grassy Narrows First Nation (GNFN), is an Ojibway First Nation located in Northwestern Ontario, 80 km from Kenora and is accessible year-round via Highway 671, with a reserve land base of roughly 4,130 ha. As of February 2022, Grassy Narrows First Nation had a registered population of 1,599 with 968 living on reserve. The Asubpeeschoseewagong Anishinabek (ANA or Grassy Narrows) First Nation is an Ojibway First Nation with a reserve land base of ...

Project Standing Buffalo Gas Station Expansion

  • Location (Standing Buffalo Dakota Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88469
  • Last Modified: 2024-05-10
  • Relevance: 799.34
  • Standing Buffalo Dakota Nation is proposing the expansion of the existing convenience store and gas station facility wholly contained on the site at the junction of Highway 56 and Highway 727. The expansion consists of a new 243 m2 service station building and island gas pumps. New 5000 L above ground storage tanks will be installed to feed the new underground piping installed to the new pump island. There will be no underground storage tanks on site as the pumps will be fed directly from the ...

Project Mistawasis Nehiyawak Lagoon Upgrades

  • Location (Mistawasis Nêhiyawak, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88546
  • Last Modified: 2024-05-10
  • Relevance: 799.34
  • Mistawasis Nehiyawak is proposing an infrastructure upgrade project, relating to sanitary sewer treatment, collection and pumping. The project includes the construction of a new facultative lagoon, 1.2 km north east of the existing lagoon within 35-48-6 W3M.  Anew sewage force main will be required to be constructed from the existing sewage pumping station to the new lagoon location. The Project also includes a new gravity sewer in a common trench with the new forcemain to the lagoon to ...

Project Septic (Holding Tank) Installation at Port Severn ON Post Office

  • Location (3280 Port Severn Road South, Port Severn, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87444
  • Last Modified: 2024-05-10
  • Relevance: 799.34
  • Canada Post is proposing to install a new septic system (holding tank) at the Port Severn Post Office, located in Port Severn, Ontario.  Project works will include site preparation, excavation, decommissioning of lines connected to the neighbour's septic tank, installation of new holding tank, repaving and revegetation work, as required.

Project Digby Nova Scotia PARROT/DME Replacement

  • Location (West Dalhousie, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87416
  • Last Modified: 2024-05-09
  • Relevance: 799.24
  • NAV CANADA proposes to replace the existing Position Adjustable Range Reference Orientation Transponder (PARROT) navigation aid with a combined Distance Measuring Equipment (DME) and PARROT. The DME/PARROT site is located southeast of the community of West Dalhousie, Nova Scotia on West Dalhousie Road and the purpose is to provide navigational aid to aircraft operating in the area. The new DME/PARROT will consist of a new equipment shelter, communications tower, and fence, and a new utility ...

Project Outfall Pipeline Extension, Lewisporte, NL

  • Location (Lewisporte, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87427
  • Last Modified: 2024-05-09
  • Relevance: 799.24
  • The proposed project will involve the excavation and placement of new and existing material to fill voids along the existing harbour bottom and provide a suitable base for the new outfall pipe. The new 610mm outfall pipe will be connected to the existing 610mm outfall pipe, to extend the outfall pipe by 170m. The new HDPE outfall pipe will be ballasted using concrete ballast blocks.

Project Summit Lake PG LNG Project

  • Location (Prince George, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 87307
  • Last Modified: 2024-05-09
  • Relevance: 799.18
  • JX LNG Canada Ltd. is proposing to develop a new liquefied natural gas (LNG) facility located about 30 kilometres north of Prince George, British Columbia (B.C.). The Summit Lake PG LNG Project would produce up to 2.7 million tonnes of LNG per year and include storage capacity for up to 200,000 cubic metres of LNG. The project would operate for 30 years. As part of the overall project, the proponent would build a new two-kilometre pipeline connecting to an existing natural gas pipeline. Ten ...

Project Energy Performance Contract (EPC) McNaughton Feeder Replacement- Canadian Forces Base Kingston

  • Location (Canadian Forces Base Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87440
  • Last Modified: 2024-05-08
  • Relevance: 799.16
  • The Department of National Defence (DND) has proposed a project. The McNaughton medium voltage system is being updated. A new electrical distribution loop will be installed along existing roadways throughout Canadian Forces Base (CFB) Kingston on the McNaughton side of the base, north of Highway 2. This work includes adding a new switchgear. The existing electrical lines will be removed and associated concrete encased ducts abandoned in place. All excess soil will be characterized before ...

Project Peterborough County - County Road 32, Hickey's Bridge Replacement

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87442
  • Last Modified: 2024-05-08
  • Relevance: 799.15
  • The County of Peterborough has proposed a complete replacement of Hickey's Bridge, a single span (9.1m) precast concrete slab structure with asphalt surface and rock timber crib abutments, located on County Road 32 (River Road). The existing structure is in fair condition with deterioration of ballast walls, concrete abutment slabs, and precast girder ends due to leaking expansion joints. The underside of the girders also exhibits isolated deterioration. The existing crib abutments show ...

Project CN Zanardi Bridge, Causeway, and Corridor Connection

  • Location (Zanardi Rapids, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80852
  • Last Modified: 2024-05-08
  • Relevance: 799.14
  • The Canadian National Railway Company (CN) is proposing to improve rail capacity and connectivity on the Skeena Subdivision in Prince Rupert, British Columbia (BC), through the construction of a new Zanardi Bridge, causeway connection to Kaien and Ridley Island, and connection to existing track at Mile 85.47.   The Project is proposing construction that will overlap into Federal Lands and water administered by the Prince Rupert Port Authority (PRPA).

Project Great Bear Gold Project

  • Location (23 kilometres southeast of Red Lake, Ontario)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 85832
  • Last Modified: 2024-05-08
  • Relevance: 799.13
  • Kinross Gold Corporation is proposing the construction, operation, decommissioning and abandonment of a new open-pit and underground gold mine with an on-site metal mill, located 23 kilometres southeast of Red Lake, Ontario. As proposed, the Great Bear Gold Project would include three open-pits and produce up to 60,000 tonnes of ore per day, while the metal mill would process up to 15,000 tonnes of ore per day. The project would operate for about 20 years.

Project Diversifying service offerings and increasing the capacity of the DG Canest Transit inc. terminal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88504
  • Last Modified: 2024-05-08
  • Relevance: 799.13
  • The proposed project is part of the National Trade Corridors Fund (NTCF) financing agreement reached between Montreal Port Authority and Transport Canada. The objectives of the project are to diversify the service offerings and increase the capacity of the DG Canest Transit inc. terminal. The project will take place at the sections 43 and 44 of the Port of Montreal (3700 Notre-Dame Est Street) and will include the following works Adjusting and adding equipments inside the existing ...

Project Coldbrook Biodiversity Facility Water Control Structure Modifications, Coldbrook, Kings County, Nova Scotia

  • Location (The site is located on Grist Mill Pond on Spittal Brook, a tributary of the Cornwallis River, Annapolis Valley, Kings County, Nova Scotia., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88545
  • Last Modified: 2024-05-08
  • Relevance: 799.13
  • The proposed project involves the improvements to the concrete water control structure that supplies the Coldbrook Biodiversity Facility, a DFO – owned property in Coldbrook, Nova Scotia.   The project involves the improvements to the sluice gates, overflow spillway, and access walkway. The existing sluice gates will be disconnected for inspection; gate stem replaced; and manual actuators removed and replaced. The overflow spillway stop logs will be removed and replaced with ...

Project McCartney's Flat IR#4 Water System Improvements

  • Location (T'IT'Q'ET McCartney's Flat IR#4, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85940
  • Last Modified: 2024-05-08
  • Relevance: 799.13
  • The planned water system improvements project will include a new groundwater supply well, treatment facility with UV disinfection and chlorination equipment, and a set booster pumps and a downstream distribution system to convey water to the north system, located above the reservoir (see attached map). The system will also provide water for future developments in the area. The proposed water system improvements include the construction of a new water treatment plant and distribution system, as ...

Project YUL Montréal-Trudeau International Airport - Development of a concrete storage area

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88543
  • Last Modified: 2024-05-08
  • Relevance: 799.12
  • The project consists of developing a storage area with reclaimed concrete slabs of approximately 9,500 m2 in the restricted area, in the northeast sector of the airport. The work includes site preparation, slab installation and drainage reprofiling.

Project Project on the Bonaventure Expressway: Repairs to the slab on concrete girders and other structural components on the elevated lanes

  • Location (Bonaventure Expressway, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87390
  • Last Modified: 2024-05-08
  • Relevance: 799.12
  • Built between 1965 and 1967, the Bonaventure Expressway is reaching the end of its service life. The Jacques Cartier and Champlain Bridges Incorporated (JCCBI) will be carrying out maintenance and repair work to increase the service life of the elevated lanes between the Victoria Bridge and the Peel Basin.   Inspections have revealed defects in the different structures of the expressway's elevated lanes. Signs of wear and delamination have also been observed in the deck slab on ...

Project Keltic Road Rehabilitation Project

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80988
  • Last Modified: 2024-05-08
  • Relevance: 799.11
  • The project proposes to rehabilitate Keltic Road in Cape Breton Highlands National Park. Proposed works include the inland realignment of the Keltic In Road away from the coastal zone to address safety concerns caused by coastal erosion, and upgrades to aging infrastructure, including water and electrical systems. The existing portion of the Keltic In Road will be restored to a natural state in the future. Improvements to the existing conditions of the Keltic Out Road, such as repaving and ...

Project Renovation of hangar 6 at Mgr-Blanche terminal of the Port of Sept-Iles, to create a cruise passenger reception pavilion

  • Location (Port of Sept-Îles, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88544
  • Last Modified: 2024-05-08
  • Relevance: 799.11
  • The development of a permanent pavilion for welcoming cruise ship passengers in Sept-Îles has long been planned as part of the international cruise stop's development. Currently, a canvas tent at the Mgr-Blanche terminal serves as the reception pavilion, but with the arrival of winter cruises, a permanent solution is needed. Indeed, Sept-Îles is the only stop on the St. Lawrence without a permanent building for cruise passengers. The new pavilion must reflect the Innu identity, ...

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Authorities Display Filters

Date modified: