Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The proposed project (the Phase 2 JP Project) is the construction and operation of a new Jordan's Principle (JP) building on the same site as the proposed Phase 1 Cultural Centre Project (Figure 1). The Phase 2 JP Project is to provide recreation and special needs health services to children in Misipawistik Cree Nation (MCN). The Phase 2 JP Project includes: • an approximately 2,786 m2 single-story JP building • an approximately 109-stall, gravel vehicle parking lot • outdoor structures such as play structures, a storage shed, an outdoor storage compound, garage, outdoor kitchen, outdoor gathering area, smoke shack, sweat lodge, splash pad/water pumphouse, and medicine garden (Figure 2) • an approximately 50 m long, 6 m wide gravel access road extension in an approximately 20 m right of way connecting the Site to the proposed Cultural Centre access road north of the Site, and • connection of the new JP building to the existing utility network (potable water, sewer, telecommunication, and overhead power) located directly adjacent (west and north) of the Site (the initial access road construction and upgrades/extensions to utility services to the Site are described under the Phase 1 Cultural Centre Project).
The Phase 2 JP Project activities during the approximately 24-month construction phase (timing to be determined during the detailed design) include: • excavating areas required for the foundation of the building, parking lot, access road extension and drainage ditches • grading/landscaping, and installation of culverts to allow for proper drainage away from the building and roads • construction of the Jordan's Principle building and outdoor structures • placement and compaction of granular roadway materials • restoration of the surface, including re-vegetation/re-seeding, installation of fencing, signage, and lighting, and • furnishing of the building interior. Clearing/grubbing and the installation of the temporary construction camp are anticipated to take place as part of the Phase 1 Cultural Centre Project.
The Phase 2 JP Project activities during the operation phase include:
• maintenance (grading and re-surfacing) of the access road as needed
• maintenance of the property (lawn care and snow clearing)
• building and property maintenance, and
• regular servicing for solid waste.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | February 6, 2024 |
Contacts
JonathanEnvironment Management and Planning
Ayonniyi Dehinbo, Senior Environmental Specialist
365 Hargrave
Winnipeg, Manitoba R3B 3A3
Telephone: 431-334-6471
Email: ayonniyi.dehinbo@sac-isc.gc.ca
-
Location
- Misipawistik Cree Nation (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2024-01-03 -
Proponent
Misipawistik Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87191
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River - Harbour Improvements
Poplar River -
New Tower Construction, Upgrade Towers & New Fibre Installation
Project site 1: Norway House Cree Nation -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Norway House Cree Nation Business Center
Norway House Cree Nation -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Poplar River Bridge Replacement
Poplar River First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River First Nation School
Poplar River Manitoba School -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Launch Ramp Reconstruction - Whiskey Jack Portage, MB - Fall 2021
Whiskey Jack Portage -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Berens River Bridge Replacement
Berens River First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Cross Lake Band of Indians - 14 Portable Classrooms
Cross Lake Band of Indians -
Cross Lake Women's Shelter
Cross Lake Women's Shelter -
CLCOI Road B Sewer and Water
Cross Lake Band of Indians -
Cross Lake Band of Indians - CHRT41 - Jordan Principle Building
Cross Lake Band of Indians -
Cross Lake Band of Indians Wastewater Lagoon Upgrade
Cross Lake -
New Fibre Installation
Project site 1 - Cross Lake First Nation -
Cross Lake Youth Centre
Cross Lake Band of Indians -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20