Cross Lake Band of Indians Wastewater Lagoon Upgrade
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
CLBOI is undertaking a wastewater lagoon upgrade project for the community of Cross Lake. The project involves the upgrade of the existing two-cell wastewater treatment lagoon to include a new cell and a SAGR treatment system. There are two parts to the project. The existing wastewater lagoon consists of two cells, the southerly cell is the existing aerated cell and is suspected to contain a large rock outcrop along the floor of the cell; the north cell is the polishing cell.
Part 1:
- A new aerated cell will be established to the east of the existing aeration cell. The new cell (cell #1) will have a synthetic liner that has a sand layer on top of the synthetic liner and will be aeriated.
- The existing aerated cell will be modified to become the secondary cell (cell #2). The cell will be dewatered and sludge removed. The large rock outcrop in the cell will be removed through blasting of the rock. The cell will then be lined with a synthetic liner topped by a sand layer and will be aerated.
- A new two cell SAGR system will be installed to the west of the refurbished cell #2.
- A blower building will be constructed to the north of the new cell (refer to drawing CL103 Item #7)
Part 2:
- Two options are currently being explored for the decommissioning of the existing north cell (polishing basin)
- Dewatering of the cell and the sludge remove to a sludge dewatering cell with geotubes, then capping of the cell.
- Dewatering of the cell and the sludge left in situ and the cell capped.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Cross Lake Band of Indians Wastewater Lagoon Upgrade | - | November 21, 2022 |
1 | Public Comment Period on Intent to Make a Determination | - | July 19, 2022 |
Contacts
Tebesi MosalaIndigenous Services Canada
Tebesi Mosala, Senior Environmental Specialist
200-365 Hargrave Street
Winnipeg, Manitoba R3C 4H4
Telephone: 204-984-0711
Fax: 204-983-2936
Email: tebesi.mosala@canada.ca
-
Location
- Cross Lake (Manitoba)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2022-07-19 -
Proponent
Cross Lake Band of Indians -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83824
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
CLCOI Road B Sewer and Water
Cross Lake Band of Indians -
Cross Lake Women's Shelter
Cross Lake Women's Shelter -
Cross Lake Band of Indians - CHRT41 - Jordan Principle Building
Cross Lake Band of Indians -
New Fibre Installation
Project site 1 - Cross Lake First Nation -
Cross Lake Band of Indians - 14 Portable Classrooms
Cross Lake Band of Indians -
Cross Lake Youth Centre
Cross Lake Band of Indians -
Launch Ramp Reconstruction - Whiskey Jack Portage, MB - Fall 2021
Whiskey Jack Portage -
Norway House Cree Nation Business Center
Norway House Cree Nation -
New Tower Construction, Upgrade Towers & New Fibre Installation
Project site 1: Norway House Cree Nation -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
Thompson Very High Frequency Omni-directional Range (VOR) Replacement
Directory of Federal Real Property # 13101: Thompson (VOR/DME) (Manitoba) -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Moody Road Development Municipal Servicing Project
Nishichawayasihk Cree Nation -
Nisichawayasihk Cree Nation Road Paving Project Phase 2
Nisichawayasihk Cree Nation Road Paving Project - Phase 2 -
Bunibonibee Cree Nation - 48 Unit Subdivision
Bunibonibee Cree Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
York Factory First Nation Remedial Actions Project
York Factory First Nation -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River - Harbour Improvements
Poplar River -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River Bridge Replacement
Poplar River First Nation -
Poplar River First Nation School
Poplar River Manitoba School -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
York Factory Prevention Centre
York Factory -
Bell MTS Radiocommunication Antenna Addition on York Factory First Nation Reserve No. 304
York Landing, MB -
York Factory First Nation Remedial Actions Project
York Factory First Nation -
York Factory - New Subdivision with road and utilities - 2324
York Factory -
Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021
Wasagamack First Nation