RM Shellbrook Gravel Permit
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Sturgeon Lake First Nation is requesting that ISC issue a 58(4)b permit for the removal of 21,000 y3 of gravel over a 3 year period (7000y3 - 2023, 7000y3 - 2024, 7000y3 - 2025) from an already existing gravel pit on Sturgeon Lake First Nation land. No infrastructure or new roads are required to access the site and sand and gravel. Surface water is over 500 Metres away and no dewatering of the pit is expected. No vegetation, top or subsoil will need to be removed to access resource. No fuel tanks will be stored on site. All Health and Safety rules will be adhered to. Any spills will be cleaned up to acceptable standard and reported to the appropriate authority. Refueling will be done in a designated area and drip pans will be used to avoid spills and drips of fuel onto the ground.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for RM Shellbrook Gravel Permit | - | September 11, 2023 |
1 | Notice of Determination -Start of Public Comment Period | - | July 26, 2023 |
Contacts
ISC-SKENVIndigenous Services Canada
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Sturgeon Lake First Nation (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2023-07-26 -
Proponent
Sturgeon Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
85797
Nearby assessments
...within 200 kilometres-
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
McIlvenna Bay Mine Project
Creighton -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Star-Orion South Diamond Project
Fort à la Corne Provincial Forest -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A