Pointe-aux-Basques wharf modernization project at the Port of Sept-Îles
The current state of Pointe-aux-Basques wharf at the Port of Sept-Îles requires immediate action, given the age of the infrastructure. The work mainly consists of installing a new curtain wall (sheet pile) in front of the existing wharf over a length of approximately 220 meters, replacing the upper tie rods, improving the defense and mooring system and redesigning the surface of the terminal. These improvements will make it possible to develop the offer in transit of goods by improving the carrying capacity which will be greatly increased at the terminal. The project also includes upgrading of drainage pipes in anticipation of climate change, with the addition of a runoff treatment system. This modernization will secure the infrastructure that is currently under significant usage restrictions. The useful life of the infrastructure is almost reached (95% and more).
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of determination | - | April 8, 2020 |
List all records
Contacts
Irene KoutsimanisEnvironmental Assessment - Quebec region
Évaluation environnementale Région du Québec, Administrative assistant
700 place Leigh-Capreol
Dorval, Quebec H4Y 1G7
Telephone: 514-633-2916
Fax: 514-633-3250
Email: aea-eaa@tc.gc.ca
-
Location
- Pointe-aux-Basques (Quebec)
-
Project Type
- Ports and Harbours
-
Status
Completed -
Start Date
2020-02-12 -
Proponent
Sept-Îles Port Authority -
Authorities
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
80475
Nearby projects
..within 200 kilometres-
BA042154 Heating system conversion - Buildings B300/B301
HMCS Jolliet, in the city of Sept-Îles -
Sept-Îles Airport - Remplacement of a reservoir
Sept-Îles Airport -
Kami Iron Ore Project
Pointe-Noire -
Expansion of an iron ore storage area and extension of the railway
Port of Sept-Îles -
Runoff management system optimization project at Pointe-Noire facilities
Pointe-Noire -
Ecocentre development in Uashat Mak Mani-Utenam
Uashat Mak Mani-Utenam -
Arnaud Mining Project
Sept-Îles -
Côte-Nord Mining Railway Project
Sept-Îles to Emeril Junction (Labrador) -
North Shore Extension / Saguenay - Sept-Iles Natural Gas Pipeline
Sept-Îles -
Maintenance Dredging at Rivière-au-Tonnerre Fishing Harbour
Rivière-au-Tonnerre Fishing Harbour -
Manitou and C Street Extensions and D Easement
Ekuanitshit -
Relocation of the Domestic Outfall of the Mingan Wastewater Treatment Plant
Ekuanitshit -
Stabilization and Protection of the Mingan River Bank
Ekuanitshit -
Installation of a 15,000L diesel fuel tank at the Rivière-au-Renard Search and Rescue station.
Rivière-au-Renard Search and Rescue station -
Development of new campsites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve
Mingan Archipelago National Park Reserve