Moraine Power Generation Project

Registry Search Mobile

Registry Search

Skip to Filters

79 results

Document Notice of Impact Assessment Decision with Reasons

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 45
  • Updated: 2023-10-04
  • Document: 153142E.html
  • Relevance: 379.08
  • Notice of Impact Assessment Decision with Reasons Ottawa — October 4, 2023 — The Impact Assessment Agency of Canada (the Agency) decided that an impact assessment is not required for the Moraine Power Generation Project (the project) located in Alberta, proposed by Moraine Initiatives Ltd. (the proponent). In accordance with subsection 16(2) of the Impact Assessment Act (the IAA), the Agency has taken into account each of the following factors: the Detailed Project Description, and the ...
1 alternate format found
French HTML
  • Relevance: 328.08
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa — 4 octobre 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact n'est pas nécessaire pour le projet de centrale électrique Moraine (le project) situé en Alberta, proposé par Moraine Initiatives Ltd. (le promoteur). Conformément au paragraphe 16 (2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a pris en compte les éléments suivants : la description détaillée du projet, ...

Document Notice of Time Limit Resumption

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 41
  • Updated: 2023-09-22
  • Document: 153059E.html
  • Relevance: 377.84
  • Notice of Time Limit Resumption Ottawa — September 22, 2023 — On September 13, 2023, Moraine Initiatives Limited (the proponent) provided its response to the Summary of Issues and Detailed Project Description for the Moraine Power Generation Project to the Impact Assessment Agency of Canada (the Agency). On September 22, 2023, the Agency accepted these documents as it determined that they contained the information prescribed by the Information and Management of Time Limits Regulations. The ...
1 alternate format found
French HTML
  • Relevance: 326.84
  • Avis de reprise du délai Ottawa — 22 septembre 2023 — Le 13 septembre 2023, Moraine Initiatives Limited (le promoteur) a fourni sa réponse au sommaire des questions (en anglais seulement) et une description détaillée (en anglais seulement) pour le projet de centrale électrique Moraine à l'Agence d'évaluation d'impact du Canada (l'Agence). Le 22 septembre 2023, l'Agence a accepté ces documents, car elle a déterminé qu'ils contenaient les renseignements prescrits par le Règlement sur les ...

Document Supporting geospatial data - Detailed Project Description

  • Project Moraine Power Generation Project
  • Document Category: Geospatial data files
  • Reference Number: 46
  • Updated: 2023-09-18
  • Document: 153213E.html
  • Relevance: 377.43
  • Supporting geospatial data – Detailed Project Description Moraine Initiatives Limited (MIL) has provided electronic geospatial data files on September 13, 2023, related to the Moraine Power Generation Project. The dataset contains the following 5 layers for maps provided in the Detailed Project Description. These data files are available to the public under the terms of the Open Government Licence – Canada. Layer Name Projection (name) Page number Interconnection Option 1 NAD 1983 UTM ...
1 alternate format found
French HTML
  • Relevance: 326.43
  • Données géospatiales connexes – description détaillée du projet (anglais seulement) Moraine Initiatives Ltd. a fourni des fichiers électroniques de données géospatiales le 13 septembre 2023 liées au projet de centrale électrique Moraine. L'ensemble de données contient 5 de couches pour les cartes fournies dans la description détaillée du projet. Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – Canada. Nom de la ...

Document Summary of the Detailed Project Description of a Designated Project

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 43
  • Updated: 2023-09-13
  • Document: 153067E.pdf
  • Relevance: 376.92
  • Prepared for: Moraine Initiatives Limited Project Description Summary Moraine Power Generation Project Prepared by: Stantec Consulting Ltd. 110220760 Revision 01 September 13, 2023 PROJECT DESCRIPTION SUMMARY Moraine Power Generation Project i Acronyms / Abbreviations AC Alberta Ministry of Culture (formerly Alberta Culture and Status of Women [ACSW]) AEPA Alberta Ministry of Environment and Protected Areas (formerly Alberta Environment and Parks [AEP]) ...
1 alternate format found
French PDF
  • Relevance: 325.92
  • Préparé pour : Moraine Initiatives Limited Description sommaire du projet Projet de production d’électricité de Moraine Préparé par : Stantec Consulting Ltd. 110220760 Révision 01 Le 13 septembre 2023 DESCRIPTION SOMMAIRE DU PROJET Projet de production d’électricité de Moraine i Acronymes/Abréviations AC Alberta Ministry of Culture (anciennement Alberta Culture and Status of Women [ACSW]) AEPA Alberta Ministry of Environment and Protected Areas ...

Document Notice of Time Limit Suspension with Reasons

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 39
  • Updated: 2023-08-10
  • Document: 152706E.html
  • Relevance: 373.44
  • Notice of Time Limit Suspension with Reasons Ottawa — August 10, 2023 — On August 4, 2023, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Moraine Power Generation Project (the project) proposed by Moraine Initiatives Ltd. (the proponent). The Agency has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have ...
1 alternate format found
French HTML
  • Relevance: 322.44
  • Avis de suspension du délai avec motifs Ottawa — 10 août 2023 — Le 4 août 2023, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours pour l'étape préparatoire en vertu de la Loi sur l'évaluation d'impact pour le projet de centrale électrique Moraine (le projet), proposé par Moraine Initiatives Ltd. (le promoteur). L'Agence a pris cette mesure à la suite d'une demande écrite du promoteur (anglais seulement) de suspendre le délai afin d'avoir suffisamment de ...

Document Summary of Issues

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 38
  • Updated: 2023-07-17
  • Document: 152477E.pdf
  • Relevance: 371.01
  • Moraine Power Generation Project – Summary of Issues – PAGE 1 of 5 Summary of Issues - Moraine Power Generation Project This document provides a high-level summary of issues submitted to the Impact Assessment Agency of Canada (the Agency) about the Moraine Power Generation Project (the Project) during the comment period on the Summary of the Initial Project Description (IPD), submitted by Moraine Initiatives Ltd. (the Proponent). The issues highlight information that support decision ...
1 alternate format found
French PDF
  • Relevance: 320.01
  • Sommaire des questions – projet de centrale électrique Moraine – page 1 de 5 Sommaire des questions – projet de centrale électrique Moraine Le présent document fournit un sommaire de haut niveau des questions présentées à l’Agence d’évaluation d’impact du Canada (l’Agence) à propos du projet de centrale électrique Moraine (le projet) pendant la période de consultation sur le sommaire de la description initiale du projet (DIP), présenté par Moraine Initiatives Ltd. (le promoteur). Les ...

Document Notice of Time Limit Resumption

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 17
  • Updated: 2023-07-10
  • Document: 152733E.html
  • Relevance: 370.3
  • Notice of Time Limit Resumption Ottawa — July 10, 2023 — On July 7, 2023, the comment period on the summary of the Initial Project Description for the Moraine Power Generation Project was completed. The activity for which Moraine Initiatives Ltd. (the proponent) requested that the time limit be suspended on June 9, 2023 has thereby been completed, and the 180-day time limit has resumed. The 180-day time limit is the period of time within which the Impact Assessment Agency of Canada (the ...
1 alternate format found
French HTML
  • Relevance: 319.3
  • Avis de reprise du délai Ottawa — 10 juillet 2023 — Le 7 juillet 2023, la période de commentaires sur le résumé de la description initiale du projet pour le projet de centrale électrique Moraine est terminée. L'activité pour laquelle Moraine Initiatives Ltd. (le promoteur) a demandé (anglais seulement) la suspension du délai le 9 juin 2023 a ainsi terminé et le délai de 180 jours a repris son cours. Le délai de 180 jours est la période de temps au cours de laquelle l'Agence d'évaluation ...

Document Notice of Time Limit Suspension with Reasons

  • Project Moraine Power Generation Project
  • Document Category: Additional Information
  • Reference Number: 8
  • Updated: 2023-06-13
  • Document: 152732E.html
  • Relevance: 367.59
  • Notice of Time Limit Suspension with Reasons Ottawa — June 13, 2023 — On June 9, 2023, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit within which it must provide Moraine Initiatives Ltd. (the proponent) with a notice of the commencement of the impact assessment of the Moraine Power Generation Project (the project), if the Agency decides that an impact assessment of the project is required. The Agency has taken this action further to a written request ...
1 alternate format found
French HTML
  • Relevance: 316.59
  • Avis de suspension du délai avec motifs Ottawa — 13 juin 2023 — Le 9 juin 2023, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours au cours duquel elle doit fournir à Moraine Initiatives Ltd. (le promoteur) un avis de début d'évaluation d'impact pour le projet de centrale électrique Moraine (le projet), si l'Agence détermine qu'une évaluation d'impact du projet est requise. L'Agence a pris cette mesure à la suite d'une demande écrite (en anglais seulement) ...

Document Public Notice - Participant Funding Available

  • Project Moraine Power Generation Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Updated: 2023-05-24
  • Document: 152020E.html
  • Relevance: 365.59
  • Due to the ongoing wildfires, this application period has been extended by 21 days and will now end on July 14, 2023, at 11:59 p.m. Public Notice Moraine Power Generation Project Participant Funding Available May 24, 2023 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous Peoples participate in the impact assessment process for the proposed Moraine Power Generation Project, a new natural gas-fired power plant ...
1 alternate format found
French HTML
  • Relevance: 314.59
  • En raison des feux de forêt qui sont en cours, cette période de demande d'aide financière est prolongée de 21 jours et terminera maintenant le 14 juillet 2023 à 23 h 59. Avis public Projet de centrale électrique Moraine Disponibilité d'une aide financière aux participants Le 24 mai 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) met à la disposition du public et des peuples autochtones une aide financière pour favoriser leur participation au processus d'évaluation d'impact ...

Document Public Notice - Public Comments Invited on a Summary of the Initial Project Description

  • Project Moraine Power Generation Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-05-18
  • Document: 152021E.html
  • Relevance: 365
  • Due to the ongoing wildfires, this comment period has been extended by 21 days and will now end on July 7, 2023, at 11:59 p.m. Public Notice Moraine Power Generation Project Comments Invited on the Summary of the Initial Project Description What is happening? May 18, 2023 — Moraine Initiatives Ltd. (the proponent) is proposing the Moraine Power Generation Project, a new natural gas-fired power plant located near Whitecourt, Alberta. The Impact Assessment Agency of Canada (the ...
1 alternate format found
French HTML
  • Relevance: 314
  • En raison des feux de forêt qui sont en cours, cette consultation publique est prolongée de 21 jours et terminera maintenant le 7 juillet 2023 à 23 h 59. Avis public Projet de centrale électrique Moraine Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 18 mai 2023 — Moraine Initiatives Ltd. (le promoteur) propose le projet de centrale électrique Moraine, une nouvelle centrale électrique alimentée au gaz naturel, située près ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Moraine Power Generation Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Updated: 2023-05-18
  • Document: 147644E.pdf
  • Relevance: 365
  • Prepared for: Moraine Initiatives Limited Project Description Summary Moraine Power Generation Project Prepared by: Stantec Consulting Ltd. 110220760 Revision 01 May 1, 2023 PROJECT DESCRIPTION SUMMARY Moraine Power Generation Project i Acronyms / Abbreviations AC Alberta Ministry of Culture (formerly Alberta Culture and Status of Women [ACSW]) AEPA Alberta Ministry of Environment and Protected Areas (formerly Alberta Environment and Parks [AEP]) AER ...
1 alternate format found
French PDF
  • Relevance: 314
  • Préparée pour : Moraine Initiatives Limited Description sommaire du projet Projet de production d’énergie électrique de Moraine Préparée par : Stantec Consulting Ltd. 110220760 Révision 01 Le 1er mai 2023 DESCRIPTION SOMMAIRE DU PROJET Projet de production d’énergie électrique de Moraine i Acronymes/Abréviations AC Alberta Ministry of Culture (anciennement Alberta Culture and Status of Women [ACSW]) AEPA Alberta Ministry of Environment and Protected ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Date modified: