Notice of Time Limit Resuming

Ottawa — May 10, 2021 — On May 8, 2021, the Impact Assessment Agency of Canada (the Agency) resumed the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Suncor Base Mine Extension Project.

The time limit was suspended for the comment period on the draft Tailored Impact Statement Guidelines and the draft Public Participation Plan at the request of Suncor Energy Inc. (the proponent). Following an additional request to extend the time limit, the comment period closed on May 7, 2021.

The 180-day time limit is the period of time within which the Agency must provide the proponent with a notice of the commencement of the impact assessment, if the Agency decides that an impact assessment of the project is required.

For further information on this impact assessment, please contact:

Suncor Base Mine Extension Project
Impact Assessment Agency of Canada
160 Elgin St, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 343-549-5813
Email: IAAC.BaseMine-MineBase.AEIC@canada.ca

Document Reference Number: 116

Date modified: